S/3011/19/E1 EIA screening opinion new Cambs police station in Milton
EIA screening opinion for up to 4,801 sqm of operational police accommodation and ancillary functions
Land at Milton
South Cambridgeshire
Application reference : S/3011/19/E1
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
EIA screening opinion for up to 4,801 sqm of operational police accommodation and ancillary functions
Land at Milton
South Cambridgeshire
Application reference : S/3011/19/E1
Created by Roxanne (CEO) // 37 threads
We're moving forward on our policy project. This thread is to discuss the various policies and move them towards publication.
Anon // 1 thread
Dog Kennel Hill Bus Lane Widening
Closes 29 Sep 2019
Opened 23 Aug 2019
Contact
Lola Olanlokun
(Project Manager)
Highways
Overview
We want to improve bus journey times along Dog Kennel Hill, as it has been identified that the bus lane is on a steep hill in this section and cyclists can hold up buses significantly as the lane is currently too narrow for buses to safely overtake cyclists travelling up the hill.
In order to support this, we are proposing to widen the northbound bus lane on Dog Kennel Hill, either side of the junction with Albrighton Road. We are also considering changing the bus lane hours of operation to 24 hours a day 7 days a week. This will reduce conflict with other vehicle types and help buses keep to timetable.
These proposals should improve journey times for passengers using the 40, 176, 185 and 484 bus routes. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.
To do this and maintain the carriageway width for other vehicles, we plan to reduce the width of the central reservation. This will involve the transplanting of one tree, but we plan to plant an additional new tree, so the net impact would be additional tree cover.
Please see the plan for these works here:
If the project goes ahead, works will be undertaken in early 2020. We would try to minimise any disruption, and no full road closure should be required.
Why We Are Consulting
As there may be some disruption for local residents during construction, we want to make sure you have the opportunity to review the proposals and let us know if you have any concerns.
Anon // 1 thread
Traffic order has been raised for the Southwark Spine North section we need to gather feedback for any objections and urgent suggestions.
Focus only on issues that are serious as its going to go in most as is.
Tom McKeown // 3 threads
Events to promote cycling within Histon and Impington. Raise awareness for groups other activities.
Created by Simon Munk // 1 thread
Council says:
Wandsworth Council would like to hear your views on proposed improvements for pedestrians and cyclists along Thessaly Road, enhancing access and the local environment.
As motorised vehicle movements are relatively low on Thessaly Road, the proposals aim to provide safer infrastructure for more vulnerable road users.
The proposed introduction of raised, controlled crossing points would benefit pedestrians, particularly school children visiting local community facilities and St George’s Primary School, whilst also slowing traffic speeds along Thessaly Road.
Within the scope of the scheme, Thessaly Road would also have new raised ‘Copenhagen style’ junctions with side roads, to create an improved pedestrian and cycle user experience and slow down traffic joining Thessaly Road. ‘Copenhagen style’ junctions allow cyclists and pedestrians to have priority over vehicles exiting the side roads. The scheme will also include installation of new high-quality paving materials and new cycle parking.
A segregated cycle track would provide a safe route for cyclists between Battersea Park Road at the north end (which is the subject of proposed improvements being developed in partnership with Transport for London) and Wandsworth Road and Lambeth to the south. It would also provide a safe route to the two new Northern Line Extension stations opening in 2021.
The proposals include improvements to the public realm at the junction of Condell Road, Deeley Road and Battersea Park Road, featuring new seating areas and new planting.
The scheme is part of a package of infrastructure improvements in the area which include proposals for a Controlled Parking Zone and a colourful ‘Happy Street’ redesign for the Thessaly Road rail bridge, all funded by contributions from developers in the area.
In line with strategic masterplans for the Vauxhall Nine Elms Battersea Opportunity Area, Thessaly Road has been identified as a key strategic link for cycle and pedestrian movements from north to south through the opportunity area, and so the proposed improvements reflect the need to meet changing demands of this growing central London area.
It is important for the Council to know the views of local residents and businesses before progressing with any improvements.
Created by John Chamberlain // 2 threads
TfL are consulting on changes to the junction of Camden Street with Camden Road. These include a new pedestrian crossing on Camden Road, cycle ASLs on all three approaches and a left-turn ban plus cycle feeder lane on Camden Street.
The consultation is at https://consultations.tfl.gov.uk/roads/camden-street-camden-road/ This includes a plan of the proposed layout and a Healthy Streets checklist (which shows minor improvements).
You can respond direct to TfL via the website or by email to consultations@tfl.gov.uk. We will put in our formal response before the 29th September deadline, incorporating responses gathered here.
Anon // 1 thread
Overview
We are conducting a parking study in the South East (SE) Bermondsey area, shown outlined in blue below, with a view to introducing a parking zone.
We have received numerous requests from residents and businesses, including a petition, requesting parking controls from a number of streets within the area shown below.
A parking study is an opportunity for the council to assess the parking issues in a certain area by asking the local residents and businesses how they view parking on their street and whether they would like a parking zone to be introduced.
A parking zone is a network of streets covered by parking controls. Each street is marked out with either parking bays or double yellow lines.
The council will analyse responses on a road by road basis and make recommendations to the decision maker on zone boundary and operation days and times based on the street by street analysis.
Any parking controls that we introduce will take into account the results of the consultation as well as existing highway safety issues in the proposed zone, feedback from emergency services, and our wider transport policies reflecting our responsibilities to air quality and active travel.
We would like to hear your views on the proposal.
Please read the consultation booklet and consider the proposed layout design, both attached below, before completing the questionnaire online or by post via the freepost address, by Sunday 22 September 2019.
For more general information about parking in Southwark visit www.southwark.gov.uk/parking
Why We Are Consulting
Since the neighbouring Thorburn Square parking zone was implemented in October 2018 (results of which are summarised here), we have received numerous requests from residents, including a petition, requesting parking controls to be extended into the area to the east of St James Road to address the issue of increased parking pressure.
The study area includes a section of streets in the north of the study area surrounding the Blue where businesses have voiced concern about parking pressure from commuters.
We have had discussions with residents, and met with businesses before launching this consultation to discuss parking issues so that our consulation and design best fits the needs of both residents and local businesses and which complements the Good Growth Fund project at The Blue, currently underway.
Free parking for traders and customers is currently offered at the The Blue car park and improvements to these parking arrangements are being managed separately by the housing parking team alongside the Good Growth Fund project.
19/1101/FUL | Change of use from a dwellinghouse (Use Class C3) to a large scale 11x bedroom House of Multiple Occupation (Sui Generis) | 140 Queen Ediths Way Cambridge CB1 8NL
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S0388/12/OL for 130 dwellings
Construction of a 168 bedroom hotel with ancillary facilities, associated access, gates, car parking (including reconfigured conference centre car parking), cycle parking and landscaping.
Created by Richard Moss // 1 thread
For discussing swept path analysis matters
Created by David Green // 1 thread
There is a dangerous group of cavities developing around the ironworks at the 'T junction' which cyclists have to negotiate every morning, while the new cyclepath to the SciencePark is unavailable.
There is a lot of non-slip surface, that red colour stuff, that has rubbed off and collected just on the bend as the path goes under the bridge, as you leave the P&R
Last week, I came past just as someone was being helped back up again, after their bike slipped on the loose surface.. It feels quite treacherous as you cycle over it.
I cant see anywhere, who to contact about removing all the loose material.
Anyone know a good point of contact to report to?
thanks, Richard
Non-material amendment on application 17/1527/FUL to include changes to Dutch's Corner, townhouses, Mews houses and landscape. Dutch's Corner changes are as follows: raised height of dormer, omission of 3 rooflights, fenestration changes and removal of recess on Ross Street elevation. Townhouse changes are as follows: reconfiguration of rooflights, reduction in bay window depth, 175mm increase to wall and internal changes. Mew houses changes are as follows: fenestration changes, amended position of house, step in roof height relocated, reduced green roof area, amendments to size of basement and front courtyards, relocated cycle store. 5 new trees omitted.
213 Mill Road Cambridge CB1 3BE
Cambridge
Application reference : 17/1527/NMA1
Created by Matthew // 2 threads
The Four Lamps roundabout at the junction of Victoria Avenue, Jesus Lane, Maid's Causeway, Short Street and King Street was built when traffic flows were anticipated to be much higher than they actually are today.
Created by Alex Raha // 1 thread
East Sydenham is changing
A key target of both the Mayor of London and the London Borough of Lewisham’s Transport Strategy is for 80% of all journeys in London to be made by sustainable means of transport (walking, cycling and public transport) by 2041. To achieve this, we have to create street environments where traffic is reduced, and where vulnerable road users, including children and the elderly, feel more comfortable making journeys on foot or by bike.
What are the issues are most important for us to address?
How would you like to change East Sydenham to make your area healthier, greener and more pleasant to live in?
Reserved Matters application for second housing phase (known as BDW2) including 330 dwellings with associated internal roads, car parking, landscaping, amenity and public open space. The Reserved Matters include access, appearance, landscaping, layout and scale and related partial discharge of conditions 8, 10, 14, 18, 26, 27, 29, 35, 40, 49, 52, 58, 62, 63, and 66 pursuant to outline approval 07/0003/OUT and use of the Pavilion building for Use Classes A1 (shops), A3 (restaurants and cafes), A4 (drinking establishments), A5 (hot food takeaways).
Land Between Huntingdon Road And Histon Road, Cambridge Known As "Darwin Green One"
Cambridge
Application reference : 19/1056/REM
sound+fury // 1 thread
Application reference : 19/1022/FUL
Created by Debra Storr // 1 thread
Corn links delayed until 2020.
Link from Uni to Foresterhill not et wit a lot of support in discussions
Grampian Cycle Partnership
Created by Debra Storr // 1 thread
Sustrans sought suggestions for improvements
Created by Debra Storr // 1 thread
Plans in progress for cycleroute from Ellon to Aberdeen. Parts of route exist. Grampian Cycle Partnership involved with both Aberdeen and Aberdeenshire Councils.
sound+fury // 1 thread
Application reference : 19/1048/FUL
Created by Debra Storr // 1 thread
King St/Ellon Road is a main artery into Aberdeen. We are advised that the traffic volumes due tot he AWPR have reduced and in order to lock in this benefit there need to be some urgency to utilise freed up road space to more sustainable forms of transport.
And no - the parallel NCR1 isn't suitable. It's hilly with cobbles and have weird diverts. as a tourist route through the university and Old Aberdeen, its fine.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Created by Martin L-S // 1 thread
Ever since Tesco opened their new shop on East Road, there has been poor unloading practice.
The company is unloading always from the front of the store with a large lorry which:
- Is stopped in the (advisory) cycle lane.
- The tail of the lorry is opened into the carriageway without a banksman, with the corner of it at the same height as a cyclist having to merge round the lorry - there is real potential for a head injury because of the relative invisibility of this
- Causing traffic to be reduced to one effective lane (or two, just squeezing through, if no large vehicles), causing delays for a half an hour period.
They have stopped using the zig-zag lines.
This photo shows the danger that is created:
http://www.cyclestreets.net/location/68145/
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
From member R.A.G.
There used to be two very useful cycle boxes (ASLs) in either direction at the junction traffic lights where ARR crosses SR. However, they have relayed the junction, and also repainted, but these two ASLs have disappeared.
While I actually think that a lot of ASLs are not that necessary (when the only option is to go straight on or turn left, and the volume of cyclists is always very low) as I'm sure you are more than aware, ASLs in positions such as these ones, are actually very important. If you are turning left from ARR onto SR the it is not an issue, however if you are continuing on ARR across the junction, then it is. ARR crosses SR with a slight left right shimmy, so you have to turn left first, then be in the right hand lane on SR, before you turn right to continue onto ARR, which is almost impossible/very dangerous without taking up the centre of the ARR single lane, before temporarily turning left onto the SR right hand lane of two.
I would like to think that they will be painted back in time, but it would seem that all other painting has been completed, and the workmen have moved on, so it doesn't look likely.
It is mildly ironic, while supposedly increasing cycling safety down SR, they have in turn decreased it on an adjoining roads such as ARR, and perhaps numerous others.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Dawes Jaguar // 0 threads
Bunbury Road is busy, but road users emerging from Woodlands Park Road and Northfield Road have to play a game of chicken as they try to judge the best moment to make a rapid exit without crashing into each other. Adding to the processing overload, the following must also be taken into account by road users:
* A service road opposite Woodlands Park Road connects with Bunbury Road at this point.
* A cycle path runs from the junction down to Bunbury Gardens.
* A zebra crossing, one that many motorists (including police drivers) fail to stop for, presumably because of the processing overload.
Lacking acceleration, cyclists face a long wait either at the junction or the zebra crossing. Either way they risk being mown down by a motorist lacking the superhuman skills required to negotiate this junction safely. Since even police drivers make dangerous mistakes here, then it is clearly hopelessly wrong.
There is quite a bit of space here. I would suggest as a minimum a single lane roundabout be created, but since Bunbury Road is busy and there is already a cycle path here it should be made a proper Dutch-style roundabout. To ease the design, close Northfield Road at this point to motor traffic (Northfield Road runs parallel to Bunbury Road).
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Created by Jean Dollimore // 3 threads
The North-South Cycle Superhighway is already under construction between Stonecutter Street and Elephant & Castle.
TfL, together with Camden and Islington Councils, is now consulting on proposals to extend it north up to King’s Cross.
The proposal is that it should continue north on Farringdon Road to Greville Street where northbound cyclists would turn onto a quiet back-street route to King’s Cross.
Southbound cyclists from King’s Cross would turn off the back-street route onto Farringdon Road at Ray Street via a new signalised junction and continue south on a stepped cycle track.
Detailed proposals
Section 1 - Farringdon Street (between Stonecutter Street and Holborn Viaduct)
https://consultations.tfl.gov.uk/cycling/afgdegdg8t9
Section 2 - Farringdon Street (between Holborn Viaduct and Charterhouse Street)
https://consultations.tfl.gov.uk/cycling/afgdasrcgrm2908
Section 3 - Farringdon Road and Saffron Hill (between Charterhouse Street and St. Cross Street)
https://consultations.tfl.gov.uk/cycling/rcgrthth5w6
Section 4 - Farringdon Road and Saffron Hill (between St. Cross Street and Ray Street)
https://consultations.tfl.gov.uk/cycling/cg25ty5cy
Section 5 - Farringdon Road, Ray Street, Herbal Hill and Warner Street
https://consultations.tfl.gov.uk/cycling/cg5eh4h
Section 6 - Warner Street and Phoenix Place
https://consultations.tfl.gov.uk/cycling/cv45h646
Section 7 - Pakenham Street, Calthorpe Street and Cubitt Street
https://consultations.tfl.gov.uk/cycling/c5hv365j753j
Section 8 - Ampton Street, Sidmouth Street and Tavistock Place
https://consultations.tfl.gov.uk/cycling/vch34yv3u
Section 9 - Tavistock Place and Judd Street
https://consultations.tfl.gov.uk/cycling/qgc245y
See also this related scheme for the treatment of the Euston Road junction and continuation northwards: http://camdencyclists.cyclescape.org/issues/2057-midland-road-and-euston-road-judd-street-junction-north-south-cs-link
Created by Simon Munk // 1 thread
The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.
Proposals
Based on the results of the survey and the feedback from Emergency Services we have
developed a set of proposals that aim to make improvements for all road users:
• Bus stop improvements to provide better access for passengers including disabled users.
• Improve and raise the existing zebra and signal crossings.
• A new raised zebra crossing on Billet Road near Cecil Road.
• 20mph speed limit along Billet Road.
• Better and energy efficient street lighting.
• Tree planting and footway resurfacing along the road.
• A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
• Two-way, fully segregated east and west cycle track.
• New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
• Raised areas at junctions that prioritise pedestrians and slow traffic down.
• De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
• Parking bays relocated at certain unsafe locations along the road to be converted to
segregated cycle track. New parking bays will be provided nearby.
• Various waiting and loading restriction at locations of concern to improve road safety
and ensure smooth flow of traffic.
• Anti-skid surface to help prevent vehicles from skidding.
Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.