Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
-
-
Berechurch Hall Road Speed Limits
Berechurch Hall Road is a busy road that is becoming increasingly residential West of the junction with Berechurch Road (J1). The speed limit has been reduced from 40mph to 30mph, except for a section of 40mph East of J1.
To improve safety for pedestrians, cyclists, and motorists, the current speed limits should be reduced by 10mph (Fig 4.1) and traffic lanes correspondingly narrowed (7.2.5-7).
-
Camulodunum Way - Baronswood Way Missing Link
The sub-LTN 1/20 white line (6.5.2-3) segregated bidirectional cycleway (Table 5-2 & 5-3) along Camulodunum Way (CW) and Baronswood Way (BW) are not connected, leaving unconfident cyclists travelling North/South along CW via the toucan crossing from the new development 202025 unable to continue North to the Town Centre, as advertised in planning documents.
The gap could be easily filled to the existing standard on CW/BW via footway conversion.
-
Highgate Road Safe and Healthy Streets
Camden is consulting on making permanent the trial scheme put in during summer 2020:
- Extension of hours of operation to 24/7 – “at all times” for the following bus lanes on Highgate Road:
- the southbound bus lane CMO15 which runs from St Albans Road to Dartmouth Park Road,
- the northbound bus lane CMO16 which runs from Carrol Close (97 Highgate Road) to Wesleyan Place,
- and the southbound bus lane CMO17 which runs from Burghley Road to Fortess Road .
- Waiting and loading restrictions extended to ‘at any time’ in all bus lanes.
- Addition of two loading bays outside 109-111 Highgate Road in CMO16 and outside 12 Highgate Road in CMO17 with hours of operation of 7pm-7am for loading for commercial properties.
They also propose the following new measures
- the extension of the existing southbound bus lane “CMO15” to the north, up to the roundabout with Swains Lane
- the removal of paid-for/permit parking bays along Highgate Road to remove existing pinch points and facilitate the extension of the bus lane (10 outside the tennis courts and 18 opposite Grove Terrace).
- the introduction of ‘at any time’ waiting and loading restrictions at the junction of Highgate Road and Carrol Close, to improve road user and pedestrian safety
-
21/04425/FUL: Change of use to 9 bed large HMO. 49 College Fields
Change of use from a small HMO (use class C4) to a 9 bed large house in multiple occupation (use class sui generis).
49 College Fields Cambridge Cambridgeshire CB4 1YZ
Cambridge
Application reference : 21/04425/FUL
-
Walking and cycling in and around Huntingdon
A new thread to highlight issues in and around Huntingdon which we may wish to engage with / support our partners with.
-
PA_212689_22ValDrive
Outline application for erection of 3 bedroom two storey house on garden of 22 Valentines Drive.
-
PA_212657_25Creffield
Retrospecitve application for garden fence and cycle/bin store
-
PA_212540_BlueOwlGtHorks
Part change of use from retail to domestic, with proposed gates and post and rail fence to front of car park. Erection of car barn to rearof site.
-
Millfield Lane Safe and Healthy Streets
In June 2020, a No Entry (with cycle exception) was placed on Millfield Lane just south of the junction of Merton Lane, making the southern section one way northbound for motor vehicles. In addition, several parking spaces were removed at the bend to provide more space for walking. This was done with an experimental traffic order and Camden is now consulting on making the changes permanent and building a proper footway at the widened section.
Extras
Camden also proposes:
- to convert 11 extra parking bays on Millfield Lane to double yellow lines and double kerb blips to improve visibility, reduce conflict between drivers and cyclists and to minimise vehicle movements which are hazardous to pedestrians.
- and to remove parking on Merton Lane close to the junction with West Hill
- and to remove parking at the junction of Merton Lane and Millfield Lane and widen the footway
They also ask whether we would like to have Merton Lane one-way for motor vehicles (eastbound only)
-
PA_212507_WyvernFrm600
Outline Planning Application (with all matters reserved except access) for the erection of up to 600 dwellings, land for a co-located2FE primary school and early years nursery, public open space and associate infrastructure. Vehicular access from Londo
-
O/COL/01/1624_SeverallsHosp
Residential development (approximately 1500 dwellings including conversion of some retained hospital buildings) mixed uses, including community facilities, employment and retail, public open space, landscaping, new highways, transport improvements, reserved route of the Northern Approach Road Phase 3 (NAR3), and associated development.
-
PA_212506_ChesterwellDayNursery
Mixed use development comprising nursery at ground floor level and residential units at first floor with associated parking and landscaping as a part of Neighbourhood Centre NC2
-
PA_212490_Copford6Hses
Construction of 6 new residential homes with associated landscaping and parking
-
PA_212479_MTroofconv
Conversion of existing roof space of Block A2 to create 1no. 1bed flat with 25sqm private terrace, together with allocation of 1no. car parking spaces (AMENDED DESCRIPTION)
-
PA_212473_63HighSt
Listed building: Proposed Change of Use from accommodation ancillary to the existing Gaming Centre (Sui Generis) to C3 (residential dwelling) on existing 2nd floor. Listed Building Consent for minor alterations to facilitate the change of use.
-
21/04350/FUL: change of use to 11no flats, 620-622 Chartwell House, Newmarket Rd
Change of use from B1(a) (offices) to Class C3 (11no flats) with changes to external elevations including new balcony structure and dormer windows
620-622 Chartwell House Newmarket Road Cambridge CB5 8LP
Cambridge
Application reference : 21/04350/FUL
-
Active Travel in Fenland
Camcycle would like to support communities across the county as part of our strategy to influence decision-making at a regional level and our campaign for Zero Carbon Streets in Cambridgeshire which aims to empower local groups to work for better walking and cycling in their areas. Fenland has historically been badly served in terms of active travel investment and is an important district in which to support improvements.
-
21/04260/FUL Change of use of a vacant office to Hostel
Change of use of a vacant office (Class E, previously Class B1) to Hostel (Sui generis) and use of the roof space as external amenity space.
49 Sidney Street (First And Second Floor) Cambridge Cambridgeshire CB2 3JF
Cambridge
Application reference : 21/04260/FUL
-
Brook Street
Suggestions to reduce traffic (via restricting southbound traffic) and potentially add cycling infrastructure on Brook street.
See google document.
-
Guided busway hazard
Sunday 26th of September 10.15pm I was cycling from Cambridge North to Histon. I collided with a fence immediately after exiting the A14 tunnel and sustained a dislocated shoulder along with other injuries.
There is definitely a hazard here because
1) the busway and tunnel from Cambridge North are brightly lit. The busway after the tunnel towards Histon is unlit.
2) about 30m after the tunnel the width of the busway tarmac surface suddenly reduces due to the introduction of the gravel strip (approx 1m wide). There is also a fence near the start of the gravel strip (I assume for the small animal tunnel)..
I cycled through the tunnel and noticed a cyclist coming in the opposite direction (without lights), so I took avoiding action by moving to the left. I may have then glanced at my mobile phone on my handlebars. When I looked up I saw the fence in my headlight. I then hit or clipped the fence.
-
PA_212385_78NSR
Change of Use from Class D1 (New Ee) Health Clinic previously trading as The Physiotherapy Practice to Class C3(a) Dwelling House.
-
PA_212451_56MilRd
New studio dwelling
-
21/04212/FUL: 3 no. self-contained flats, 21 Sandy Lane
Replacement of an existing building with a development of 3 no. self-contained flats
21 Sandy Lane Cambridge Cambridgeshire CB4 1HZ
Cambridge
Application reference : 21/04212/FUL
-
21/04190/FUL: 3 dwellings, land adj. to 25 Rawlyn Road
Erection of 3 dwellings along with off street parking, private amenity space, cycle parking/ storage and refuse storage, demolition of existing rear garage lean-to and reconfiguration of the pavement along Stanesfield Road
Land Adjacent To 25 Rawlyn Road Cambridge Cambridgeshire CB5 8NL
Cambridge
Application reference : 21/04190/FUL
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
New route next to railway track: Dumfries - Greenlea
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
-
Narrow Approach To Clifton Suspension Bridge With Unsuitable Cycle Lane
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
-
Link from SPCC route to Ipswich town centre
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
-
Twickenham Bridge to Thames Path
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
-
Cycle path with give ways
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road. -
Various improvements between Ipswich and Harwich International
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
-
Northstowe Planning Application
Major planning application here - c. 10,000 homes
-
Manor Circus
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
-
No Entry except Cycles?
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign. -
Turn Dock Street entrance into continuous pavement/cycle track
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
-
Dangerous cycle lanes in Ipswich Town Centre
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
-
Restrictive Permeability between Bristol and South Gloucestshire on Wordsworth Road
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
-
Proper cycle provision on Cherry Hinton Road needed
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
-
Reduce conflict between cycles and pedestrians around Stoke Bridge
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
-
Litlington to Therfield over the A505 at Royston
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
-
Chicanes too close
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream
-
Upgrade footway on Wherestead Road over A14 to allow cycling and sign
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
-
Calton Gardens / Holloway
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
-
Lower Mortlake Road side roads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines. -
Cycle track priority over A14 slip roads
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
-
Railway Route between Cambridge and Cherry Hinton
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
-
Cycle lane infringement on Pembroke Street and Downing Street
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
-
Dean Rd - Longford Close bridge
The bridge between Dean Rd and Longford Close is currently a pedestrian only bridge, marked no cycling. Coupled with other improvements, provision of a decent facility here that could be used by cyclists with minimal conflict with pedestrians would open up a decent quiet route from the schools in Hampton (Hampton Academy, Hampton Boys, LEH) to the A316 cycle route.
-
cars parked in cycle lane
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
-
Herbert St - bollards after roadworks
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...