21/00537/FUL: 5no. dwellings, 29 High Street Chesterton
21/00537/FUL | Demolition of existing dwelling and erection of five dwellings and associated landscaping | 29 High Street Chesterton Cambridge CB4 1NQ
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00537/FUL | Demolition of existing dwelling and erection of five dwellings and associated landscaping | 29 High Street Chesterton Cambridge CB4 1NQ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00284/FUL | Erection of a detached building containing 1no. 2-bed and 1no. 1-bed duplex apartments, with associated car parking and landscaping | 1 Maitland Avenue Cambridge CB4 1TA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00442/FUL | Two storey side and single storey front and rear extensions to create one, two bed flat and one, one bed flat | 5 Davy Road Cambridge CB1 3QW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00358/FUL | Refurbishment and extensions to the existing building to provide 2 no. commercial units (Use Class E) at ground floor with 6 no. flats to the rear and on the upper floors along with cycle parking, landscaping and associated infrastructure | 78-80 Cherry Hinton Road Cambridge CB1 7BH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00526/FUL | Retrospective for the existing rear L-shape extension and change of use of dwelling from small HMO C4 to large scale 8 no. person HMO (Sui Generis), including use of the existing rear L-shape extension. | 2 Galfrid Road Cambridge CB5 8ND
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00220/FUL | Construction of 1no. Detached 1 1/2 storey dwelling to the rear of no. 579 Newmarket Road | 579 Newmarket Road Cambridge CB5 8PA
Created by Steven Moseley // 1 thread
Demolition of dilapidated GP surgery building and replacing it with state of the art new medical centre with staff accommodation on first floor, parking, cycle and waste storage and ancillaries.
Created by Steven Moseley // 1 thread
Full planning application for a two-storey temporary school building (640m2) and single-storey admin block (66m2) for Trinity School at Gilberd School as part of Alpha Trust including minor alterations to landscaping + hard standing.
Created by Steven Moseley // 1 thread
The ABRO site (now called the DSG) forms part of the Defence Estate and was used as a military vehicle repair facility. The site was vacated in about 2019 and has not been used since that time. The Defence Estates have decided to dispose of the site as it is no longer required for military purposes.
Created by Stuart Johnson // 1 thread
Barriers blocking shared path in Tollgate, Colchester for cyclists, wheelchairs, mobility scooters etc.
Created by Steven Moseley // 1 thread
East Suffolk and North Essex NHS Foundation Trust (ESNEFT) are preparing two planning applications for a proposed Elective Orthopaedic Centre and Northern Approach Road access at Colchester Hospital, Turner Road, Colchester. The public is invited to comment on the development proposals in a consultation between 1 March and 12 March 2021.
The detailed elements of the works involved with the Elective Orthopaedic Centre comprise:
The detailed elements of the works involved with the Northern Approach Road access comprise:
The new Northern Approach Road access point is proposed to be located to the south‐western corner of the site, and will create a clearer, more legible and direct access for staff, patients and visitors from the strategic network in line with other local hospitals in Essex, and will provide improved highway safety and environmental benefits to residents residing along Turner Road, as well as encouraging improved sustainable travel behaviours.
More information on the plans can be downloaded here
Your views are very important to help us develop our proposals. Please use the SurveyMonkey comments form here, or alternatively email your response direct to Sam Hazell samhazell@lppartnership.co.uk
The consultation period will run from Monday 1 March 2021 until 5.00pm on Friday 12 March 2021.
Created by Steven Moseley // 1 thread
"When Colchester council approved the plan, in about 2007, it insisted that all private motor traffic enter and leave the estate via an access on to the A134 (Cordelia Drive), near to the A12 but at the farthest point from the town centre. ...
A year ago, the developers, Mersea Homes and Countryside, decided they didn't like this arrangement and applied to scrap the bus gate. They hedged their bets and also asked to move the bus gate into their estate, giving 160 homes access to Mile End Road.
Colchester council rejected the scrapping of the bus gate but granted a temporary access for five years to be covered by a legal agreement.
The developers decided to go to appeal." (blog)
Created by Stuart Johnson // 1 thread
The new shared path that runs parallel to Severalls Lane has obstructive chicane barriers and cyclist dismount signs where the path crosses the drive to Whitehouse Farm.
sound+fury // 1 thread
Created by Stuart Thomas // 1 thread
Barriers restrict access for people of all abilities, e.g. hand cycles, buggies for carers with disabled children, and for this that wish to cycle.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for erection of cycle shelter
93 Regent Street Cambridge CB2 1AW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00188/FUL:
Erection of a two storey dwelling, with associated amenity space, parking, bin and cycle store following demolition of garage.
Land R/o 207 Cherry Hinton Road, Cambridge, CB1 7DA
Created by Diane // 1 thread
There is a proposal to build 35 new homes on Sandy Lane (described by the developers as 26 'family houses' and 9 'affordable homes').
The project has a website: https://yoursay.online/sandy-lane#about-the-project
At 6pm today (23rd February 2021) there will be webinar about the development (hosted by the developers).
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00264/FUL: Erection of two new buildings comprising Class E(g)i/E(g)ii floorspace including ancillary accommodation/ facilities with associated plant and cycle parking for Block F2 and an Aparthotel (Class C1) with multi-storey car park for Network Rail, including car and cycle parking, for Block B2 with associated plant, hard and soft landscaping and permanent access from Devonshire Road to the Cambridge Station Car Park, utilising the existing pedestrian and cycle access, restricted to emergency access to the railway only.
Blocks B2 & F2, Devonshire Quarter, Devonshire Road, Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00038/FUL
Erection of new 2 bedroom 1.5 storey dwelling, associated works along with new parking/cycle parking following demolition of existing outbuildings
199-201 Cherry Hinton Road, Cambridge, CB1 7BX
Created by nix // 1 thread
The bike lanes across Marble Arch have long been chaotic and poorly marked. Confusion has been increased by the hurried COVID additions. I have found taking my 14 year old to practice learning to ride on North Carriage Drive scary.
I have heard our Chair despair on the subject before.
Specifically there are no clearly marked lanes on the Marble Arch island, through an area mobbed in Summer with visitors, and with a table tennis table on the intuitive route. But a chance has emerged - see below. Link via Westminster web-site to oxfordst@westminster.gov.uk.
Views are sought to "stakeholderteam@murphycareyjv.co.uk by Friday 19 February
sound+fury // 1 thread
New 2 bedroom house being built close to an existing property.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/05396/FUL
Erection of four commercial mid-tech buildings comprising Use Class E (commercial, business and service) to provide flexible office, research and development and light industrial uses, and Use Class B8 (storage and distribution) limited to a maximum of 20% GEFA; together with car parking, cycle parking, landscaping, substation and associated infrastructure (following demolition of the existing buildings).
Trinity Hall Farm Industrial Estate, Nuffield Road, Cambridge, CB4 1TG
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.