21/00772/OUT | A hybrid planning application next to ARM
Substantial proposed development next to the Technology Park on Fulbourn Road (ARM).
181 documents.
Lots of bike parking, mostly in double stackers.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by KW // 1 thread
Substantial proposed development next to the Technology Park on Fulbourn Road (ARM).
181 documents.
Lots of bike parking, mostly in double stackers.
Created by Gabriel // 1 thread
The plans for the improved shared pavement between Waterbeach and Milton have been added to the planning portal. Planning application: S/0559/17/COND29
Also please note the A10 SLO for a reduction of the speed limit on these sections from 50mph to 40mph.
https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-slo--reference-number-pr--------a---and-some-surrounding-roads-in-the-vicinity-of-milton--landbeach-and-waterbeach-18-0
From looking at the plans my main concerns
Narrow sections - less than 3m wide, which is not LTN 1/20 compliant and very unambitious seeing as 11,000 homes are being built in Waterbeach.
The separation from the carriageway is also very unambitious at 0,5m and not a properly segregated verge. 0,5m is the absolute minimum suggested in LTN 1/20. 1m is the minimum recommended.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Cambridgeshire County Council proposes to make the above Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Prohibit all motorised vehicles on Oakington Road, Longstanton from a point 460 metres south east of its junction with Wilson’s Road to Longstanton Road, Oakington and Westwick at a point 370 metres north west of its junction with Lowbury Crescent.
Access for pedestrians, cyclists & equestrians will be maintained with provision for access for adjacent agricultural landowners and emergency service vehicles.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Cambridgeshire County Council proposes to make the above Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Revoke 5.5 metres of the residents parking bay outside of 55 De Freville Avenue and replace with double yellow lines to facilitate a dropped kerb access.
Created by Steven Moseley // 1 thread
Part demolition of outbuilding to south west elevation and conversion of existing building to three two bedroom and three one bedroom apartments with associated parking
Created by Steven Moseley // 1 thread
Demolition of double garage and erection of five detached dwellings, garages with landscaping, access and front boundary wall. (re- submission of approval 181630 and 190582)
Created by Roxanne (CEO) // 1 thread
How can cycle parking at Queen Anne Terrace car park be improved and made more secure?
Outline Planning Application for up to 39 market homes and 16 affordable homes with vehicular access from Greate House Farm Road andThe Folley with all other matters reserved.
211392 / 211393
Large development, so several proposals for local routes in planning objection.
Created by Thomas Ashton // 1 thread
A pair of one way swing gates have been installed on Coldhams common. This blocks the path for people like me with a cargo bike because it is not possible to hold the gates open and hold the bike at the same time. I spoke with someone on the site and they said it was needed to stop cows escaping while they replaced the cattle grid. Surely there is a better way that don’t stop access for cargo bikes?
Created by KW // 1 thread
Hybrid planning application comprising: a) outline planning application for commercial development comprising B8 floorspace, including ancillary E(g)i floorspace, and flexible B8/E(g) floorspace, car and cycle parking, landscaping and associated infrastructure with all matters reserved except for access on Parcel A; b) full planning application for ecological enhancements on Parcel B; and c) full planning application for recreation and ecological enhancements, including landscaping, public open space and pedestrian and cycle access on Parcel C. | Land South Of Coldhams Lane Cambridge Cambridgeshire
Has implications for The Tins, Fulbourn Greenway, Cherry Hinton, Coldham's Lane, Brookfields, and Burnside.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing buildings/structures and erection of college accommodation, new access and landscaping
Wilberforce Road Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 2 No. one Bedroom Bungalows
Land To The Rear Of 32 And 32A Gray Road Cambridge CB1 3TA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of outbuilding into one new dwelling, and enlargement of cycle and bin store
1 Grosvenor Court Cambridge CB3 0HU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a 2bed dwelling on land rear of 57 Mowbray Road
57 Mowbray Road Cambridge CB1 7SR
Created by Rosamund Humphrey (Admin Officer) // 1 thread
External Improvements to St Peter's Terrace including improved bike racks & storage, removal of three trees, enlarge gravel area, relay tarmac, new bin stores, new fences and reduce rear garden.
No change of use.
Land At St Peters Terrace Cambridge CB2 1QQ
Created by Marcus Howarth // 1 thread
From https://haveyoursay.tfl.gov.uk/lumley-road
This is in response to a high number of collisions having been recorded at this location involving vehicles turning right from Lumley Road, and northbound traffic on St Dunstan's Hill. Local residents and stakeholders have also raised concerns about this junction. We are now holding a public consultation on our proposals, running from 7 June to 18 July 2021, and you can find details of how to take part below.
We propose making the exit from Lumley Road onto St Dunstan's Hill left turn only. To enforce this, we propose installing a pedestrian island in the carriageway at the end of Lumley Road, which would help prevent vehicles from turning right. This island would include dropped kerbs and tactile paving. As well as prohibiting the right turn, this would also provide a safer and easier crossing point for pedestrians and cyclists crossing Lumley Road.
From impact assessment
Created by Steven Moseley // 1 thread
Resubmission of application number 210196 following redesign, for a single linked 2 bedroom house.
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 172118 - APP/A1530/W/18/3200940 - Demolition of bungalow and barn/shed and the erection of 3no. dwellings.
Created by Steph Potter // 0 threads
This is a junction of a suburban road and a gravelled shared pedestrian/cycle route through Fish Pond Woods. Unfortunately, the dropped kerb to turn from the road onto the path does not line up with the path and there are no double yellow lines to prevent people from parking immediately blocking the path. Once on the path, the path is too narrow and poorly gravelled that it is difficult to try to stop or swerve if meeting a pedestrian or oncoming cyclist.
Created by John Seton // 1 thread
Aggregate Industries have contacted local cycling walking and equestrian groups about Rights of Way improvements they plan to implement on their site near Little Paxton, between the A1 and the River Ouse north of Little Paxton.
They say "As part of our planning permission at Little Paxton and specifically the restoration scheme we are starting to implement our Rights of Way improvements which will see a new network of Public Rights of Way and Bridleways linking Diddington Village with the River Ouse and Little Paxton Nature Reserve".
As the work is on a private site, it my not get picked up through regular County Council planning distribution lists, so this is creating a new issue to create a placeholder for any discussion about the plans.
Created by Steven Moseley // 1 thread
Outline Application, all matters reserved: Existing Dwelling House retained and refurbished with smaller Garden. 3No. new detached 3- bedroom Dwelling Houses.
Created by Jean Dollimore // 1 thread
Goods Way has been one way westbound for motor vehicles for most of its length during recent construction works. The section between the Kings Cross Station service road and York Way is two-way to allow service and construction vehicles to access York Way directly. Two-way cycling has been maintained right along Goodsway.
Camden proposes to make the current arrangements permanent
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by Andrea Bredel // 1 thread
this is one of many cycle lanes here in Ipswich that go on and off the road several times. This is very awkward for cyclists as they need to be very careful when getting back onto the road and most probably confuses drivers as well.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en