Emmanuel College 12/0029/FUL
Starting a thread about this application here so we can continue on from the previous planning list discussion.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by Richard Moss // 3 threads
Planning application submitted for housing near the primary school and a mixed use housing plus retail development at Unwin Square, east of the Permier Inn. Concerns about provision for cycle parking contained in the plans submitted.
Created by Robin Heydon // 1 thread
Proposed package: Streamlining bus services through Cambridge city centre
A package of measures including some of the following is proposed:
• Cambridge Core Scheme extension – potential remove all traffic but buses and cycles from St Andrews Street north of Emmanuel Street through the day.
• Address taxi overcrowding in St Andrews Street.
• Remove / relocate some on-street parking in Jesus Lane.
• Bus priority measures along Chesterton Road
• Improved bus stop infrastructure in Hobson Street and Jesus Lane.
• Removal of some parking on Histon Road and Station Road.
• On Street ticketing at busy or constrained boarding points to reduce bus standing time and pedestrian congestion.
• Enhanced enforcement of infringements on key bus routes and stops.
• Rerouting of some buses away from Bridge Street / Magdalene Street.
• Park and ride capacity enhancements
• Rural interchange enhancements on longer routes benefiting from the city centre improvements.
ATM proposed next to Hills Road cycle lane
Martin Lucas-Smith // 3 threads
The LSTF is the funding from government for sustainable transport for the region. This issue covers discussion of the bid.
Martin Lucas-Smith // 2 threads
Planning application by Sainsbury's on Mill Road - various issues.
Created by Simon Nuttall // 1 thread
I'll hang a thread off this general issue where we can share news - at least while we transition to using this new system.
Created by Heather Coleman // 1 thread
The planning application has the promise of new, extra cycle parking, which should be good news. However, details are scant to say the least and as new jobs will presumably be created, I fear it will do nothing to alleviate the chronic shortage of cycle parking on site, especially at this location at the rear of the Concourse, and a place of choice to park if you have cycled from Trumpington.
Warrington Cycle Campaign have produced a leaflet aimed at improving the mutaul understanding of cyclists and bus drivers points of view.
It is called "Bus Drivers & Cyclists in Harmony"
We hope to promote better relations between the two groups via a similar leaflet. The key goal is safety but enhanced respect by both parties would be of benefit.
We have serious concerns over the standards of driving of certain classes of vehicles in Cambridge.
We have an opportunity to push for both bus companies and and local authorities to train their drivers to a higher standard
Under the 'Certificate of Profession Competence' drivers of certain classes of vehicle are required to undertake 'continuing training'
There has been an article in Local Transport Today about training in London. see:
http://www.transportxtra.com/magazines/local_transport_today/news/?id=29476&StartRow=1
"A COURSE designed to cut the number of lorry accidents in urban areas, particularly those involving cyclists and pedestrians, has gained industry accreditation.
The ‘safe urban driving’ (SUD) course developed by Transport for London and London boroughs has been accredited by the Joint Approvals Unit for Periodic Training, the body set up by the sector skills councils for freight and passenger transport to manage the driver Certificate of Professional Competence (CPC). "
"EU directive 2003/59 requires lorry and van (over 3.5 tonne) drivers to obtain a CPC by completing 35 hours of training every five years. The requirement came into force in 2009, so the first deadline is September 2014. "
"The second half of the course sees the lorry drivers get on bicycles and go on-road to understand how cyclists position themselves on the road, and how to drive in the presence of cyclists. This module was developed by Cycle Training UK for the London Borough of Lambeth. "
I've already pointed out this scheme to the cycling officers
It may be that we can get the LA's to approach Stagecoach on this issue and it could form part of any 'Quality Contract'
Created by Jim Chisholm // 1 thread
The County is proposing a 'controlled parking zone' to cover a wide area around Addenbrooke's. The exact limits are to be discussed, and issues will arise in area of new housing where the roads are yet to be adopted.
An initial meetimg for stakeholders is to be held at Hills Road VI form college on Thursday February 2nd from 18:30 to 20:30
The map shows the area being studied
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Created by velocipedus@gmail.com // 2 threads
Hills Road Bridge is a Natural Bottleneck which has high bike density. Bike Traffic to the school on Hills Rd will need to turn right into Purbeck Rd. There is a bus stop on the left which slows down traffic, but generally cars are in an accelerating mood here. Right turn pocket? Traffic Light? suggestions please
Created by velocipedus@gmail.com // 1 thread
Hills Rd, traffic waiting at lights, cyclist have hard time to filter forward because lane width, presence of buses, long red light period. Sense of obstacle and injustice high because of Bus/Bike Lane liberty in the approach.
Over the years there have been multiple issues on this site.
Created by velocipedus@gmail.com // 1 thread
On tool for reducing cut-through traffic is "Access Only" signage. What is the potential of this sign. Where is it used? How is it being enforced? Are there opportunities to
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by User 2125 (deleted) // 1 thread
The shared access path on Colne road, on its north side, creates conflict between cycles and vehicles. The provision seems worse than using the road. The presence of commercial premises on both sides of this road make the use of a shared access path highly problematic.
More photos can be found on the campaign blog.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by FrenchyF // 0 threads
The bike lane here starts too close to the junction - drivers hug the kerb before the cycle lane starts, and this makes the lane useless.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by jpennycook // 1 thread
Brighton Hill Community Planning Group is consulting:-
Now consulting!
Brighton Hill Community Planning Group
If you live work or volunteer in Brighton Hill please let us know your views.
Complete the survey (https://www.snapsurveys.com/wh/s.asp?k=149700756001)
The consultation will close on 14 August 2017.
Created by Rob Earl // 0 threads
Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.
Created by Rob Earl // 0 threads
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Stephan Matthiesen // 1 thread
The path between Hyvot Loan and Guardwell Glen has two narrow chicanes at both ends, which are quite overgrown too.
This path is important as it allows people to leave the quiet route northwards towards Ellens Glen, so you can avoid parts of the busy Gilmerton Rd.
I contacted the Active Travel team about it and they are going to look at it. There is some uncertainty if this is owned by the Morrison supermarket or the council. The chicanes were put in after local complaints about motorbike, so the Active Travel team has to investigate if this is still a concern.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by FrenchyF // 1 thread
The road markings at the junction between Old Dalkeith Road and Little France Cottages should be repainted. Adding a bike lane would also be an improvement.
Created by FrenchyF // 1 thread
Just south of Little France Road, the southbound bike lane on Old Dalkeith Road is appalling. It's alongside a parking bay, but the parking bay isn't wide enough for cars to fit into it without them sticking into the bike lane. Even if it was, "dooring" would still be a significant hazard.
Even away from the parking bay, the bike lane is too narrow.
The bike lane really needs to be wider and further away from parked cars. If this isn't possible, I think it would be better to have no cycle lane at all.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Rob Earl // 1 thread
Access to QR10 from Fillyside Road requires either:
- Cycle across busy/fast road and up full height kerb
- Turn right onto busy/fast road for ~100m, turn left up dropped (but not flush) kerb
- Cycle on pavement and cross at traffic island
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Kokomo // 0 threads
usually have to wait a very long time here - reduce the wait time after pushing the button! This crossing needs to be more responsive like the one round the corner on Clerk St.
This small change will make a big difference to this route to the Innocent Path
Created by jpennycook // 1 thread
Outline planning application for the erection of up to 95 dwellings with public open space, landscaping and sustainable drainage system (SuDS). Demolition of garages to form a vehicular access point from Bow Drive and replacement garaging. All matters reserved except for means of access
Land At Goddards Farm Goddards Lane Sherfield-on-Loddon Hampshire
"Whilst there are no cycle routes currently in the vicinity of the site, the topography of the
surrounding roads make them generally conducive to encourage cycling. These provide
connections for cyclist from the development site to the wider area."
Basingstoke
Application reference : 17/02190/OUT
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by acsimpson // 0 threads
There is a gate across the full width of the national cycle network just west of the Railway line past Dalmeny. This forces all path users to use the uneven verge which can get very muddy at certain times of year.