Glebe Way - possible contraflow
Cycling against the direction in Glebe Way allows access from toucan in Staines Rd to bridge over A316.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Paul L // 0 threads
Cycling against the direction in Glebe Way allows access from toucan in Staines Rd to bridge over A316.
Created by Paul L // 0 threads
A contraflow here would make it easier to cycle from Bushy Park to Kingston Bridge.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Andrew Woodward // 0 threads
More cycle parking capacity is required in Sheen. This would be a good location for more capacity.
Created by Andrew Woodward // 1 thread
More cycle parking required in Sheen - this is a good location for some more capacity.
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Andrew Woodward // 0 threads
Parents with children on school run frequently cycle on pavements on this stretch of road due to the hostile road conditions - in particular high vehicle speeds & lack of segregated cycle lanes.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly. Cars frequently speed up to 40mph on approach to this crossing.
Created by Andrew Woodward // 0 threads
LCN 37 provides a quiet route from Upper Richmond Rd West to Sheen, Mortlake & Barnes. To follow it eastbound the sign post for the left turn into Denehurst Gardens is located high up on the opposite carriageway - see top right in the photo. This is a completely obscure sign that 99% of cyclists will miss.
Created by Andrew Woodward // 1 thread
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Andrew Woodward // 0 threads
There is short one way stretch here - this would be easy to make 2 way for cyclists and is key to creating a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road.
Created by Andrew Woodward // 0 threads
This roads is a one way street that feed into Clifford Ave just south of Chalkers Corner. Clifford Avenue is a nightmare for cyclists and there isn’t an obvious remediation because its not very wide and its the South Circular road. Opening up Kingsway to 2-way cycling would enable cyclists travelling north up Clifford Ave who want to travel east/west on the A316 cycle track to get off Clifford Ave as quickly as possible and avoid the queue up to Chalkers corner. It would also give residents of Kingsway a legal cycle route that does NOT force them into Clifford Ave.
Created by Andrew Woodward // 0 threads
This roads is a one way street that feed into Clifford Ave just south of Chalkers Corner. Clifford Avenue is a nightmare for cyclists and there isn’t an obvious remediation because its not very wide and its the South Circular road. Opening up Somerton Ave to 2-way cycling would enable cyclists travelling north up Clifford Ave who want to travel east/west on the A316 cycle track to get off Clifford Ave as quickly as possible and avoid the queue up to Chalkers corner.
Created by velocipedus@gmail.com // 1 thread
University Technical College (UTC) Cambridge is to be launched at the Long Road 6th From site.
The UTC will open in new build facilities in September 2014 and will deliver a technical education to 670 students aged 14 to 19
It is a collaboration of Cambridge University Health Partners, Cambridge Regional College, Babraham Institute, Napp Pharmaceuticals, Medical Research Council, Wellcome Trust Sanger Institute, Long Road Sixth Form College, Parkside Federation Academies, Cambridge Cleantech, Cambridgeshire County Council, East of England NHS, Anglian Water, The Cube, AmeyCespa
Public Exhibition 11 April 2013
4pm to 8pm
Long Road Sixth Form College
Cambridge Regional College in association with Long Road Sixth Form College, their industry partners and Cambridge University Health Partners are developing designs for an exciting new University Technical College on the Long Road Sixth Form College site.
Project Manager is Laurence Wells
c/o Cambridge Regional College
Kings Hedges Road
Cambridge
CB4 2QT
Tel 01223 418502
Created by Sam Saunders // 1 thread
The barrier where Malago Greenway joins Cotswold Road/Windmill Hill is unreasonably restrictive - not just to tricycles, cargo and trailer bikes but also to baby buggies and mobility aids. The low hoop presents an unnecessary hazard to anyone with less than good eyesight.
Created by christhebull // 1 thread
Alright folks, if we're going to get the whole "Freeways and Greenways" network off the ground than we need to make sure we know what the existing routes are like (as some of us know certain parts of the city better than others). Here is my take on this section of the Frome Greenway:
1) The route is fairly direct and a lot flatter than the road through Stapleton past Colston's School, it is also free of motor traffic
2) Part of the route twists and turns *right next to* a lake and is shared by dog walkers. Whilst I recognise that this is meant to be a relatively leisurely route through a park, we don't want anybody taking an unexpected swim. The path also floods after heavy rainfall.
3) The lakeside stretch is particularly hazardous at light. To cut down on energy costs, movement activated lights could be installed on an ideally re-aligned path.
4) The route loses cohesiveness near the M32 junction. Improvements to the path and to signage are needed to direct cyclists to the Stapleton Road shared use section.
5) One of the bridges is exceptionally narrow (haven't measured, but can't be more than 1 metre) and is only fit for single track use
6) At the gated access off Wickham Glen, there is a passage to the side which is filled with loose gravel which gives poor traction on cycles as well as an open drainage channel which is a trip hazard on foot and bike
Overall the route already has strong potential to form a quality part of the greenway network, but these issues should be addressed as part of the overall network creation.
Created by Sam Saunders // 1 thread
New lights and crossings have been installed and pedestrians have recently been given a much safer way to cross Berkeley Place from west to east. The build-out near the end of Procathedral Lane has narrowed the roadway and made the pedestrian crossing time much shorter than it was. The two traffic lanes heading north east out of Berkeley Place are each now reduced to about 2.9 metres wide, leaving very little, or no space for a vehicle to pass a cyclist or for a cyclist to approach the ASL when traffic is stationary. The upward incline can make this even more awkward for a cyclist who needs to stop and then restart from a position behind or alongside vehicles south west of the build-out.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by User 2125 (deleted) // 1 thread
The shared access path on Colne road, on its north side, creates conflict between cycles and vehicles. The provision seems worse than using the road. The presence of commercial premises on both sides of this road make the use of a shared access path highly problematic.
More photos can be found on the campaign blog.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by FrenchyF // 0 threads
The bike lane here starts too close to the junction - drivers hug the kerb before the cycle lane starts, and this makes the lane useless.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by jpennycook // 1 thread
Brighton Hill Community Planning Group is consulting:-
Now consulting!
Brighton Hill Community Planning Group
If you live work or volunteer in Brighton Hill please let us know your views.
Complete the survey (https://www.snapsurveys.com/wh/s.asp?k=149700756001)
The consultation will close on 14 August 2017.
Created by Rob Earl // 0 threads
Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.
Created by Rob Earl // 0 threads
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Stephan Matthiesen // 1 thread
The path between Hyvot Loan and Guardwell Glen has two narrow chicanes at both ends, which are quite overgrown too.
This path is important as it allows people to leave the quiet route northwards towards Ellens Glen, so you can avoid parts of the busy Gilmerton Rd.
I contacted the Active Travel team about it and they are going to look at it. There is some uncertainty if this is owned by the Morrison supermarket or the council. The chicanes were put in after local complaints about motorbike, so the Active Travel team has to investigate if this is still a concern.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by FrenchyF // 1 thread
The road markings at the junction between Old Dalkeith Road and Little France Cottages should be repainted. Adding a bike lane would also be an improvement.
Created by FrenchyF // 1 thread
Just south of Little France Road, the southbound bike lane on Old Dalkeith Road is appalling. It's alongside a parking bay, but the parking bay isn't wide enough for cars to fit into it without them sticking into the bike lane. Even if it was, "dooring" would still be a significant hazard.
Even away from the parking bay, the bike lane is too narrow.
The bike lane really needs to be wider and further away from parked cars. If this isn't possible, I think it would be better to have no cycle lane at all.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Rob Earl // 1 thread
Access to QR10 from Fillyside Road requires either:
- Cycle across busy/fast road and up full height kerb
- Turn right onto busy/fast road for ~100m, turn left up dropped (but not flush) kerb
- Cycle on pavement and cross at traffic island
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Kokomo // 0 threads
usually have to wait a very long time here - reduce the wait time after pushing the button! This crossing needs to be more responsive like the one round the corner on Clerk St.
This small change will make a big difference to this route to the Innocent Path
Created by jpennycook // 1 thread
Outline planning application for the erection of up to 95 dwellings with public open space, landscaping and sustainable drainage system (SuDS). Demolition of garages to form a vehicular access point from Bow Drive and replacement garaging. All matters reserved except for means of access
Land At Goddards Farm Goddards Lane Sherfield-on-Loddon Hampshire
"Whilst there are no cycle routes currently in the vicinity of the site, the topography of the
surrounding roads make them generally conducive to encourage cycling. These provide
connections for cyclist from the development site to the wider area."
Basingstoke
Application reference : 17/02190/OUT
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by acsimpson // 0 threads
There is a gate across the full width of the national cycle network just west of the Railway line past Dalmeny. This forces all path users to use the uneven verge which can get very muddy at certain times of year.