211253_FordhamHth
Proposed single storey dwelling
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by John Seton // 1 thread
Aggregate Industries have contacted local cycling walking and equestrian groups about Rights of Way improvements they plan to implement on their site near Little Paxton, between the A1 and the River Ouse north of Little Paxton.
They say "As part of our planning permission at Little Paxton and specifically the restoration scheme we are starting to implement our Rights of Way improvements which will see a new network of Public Rights of Way and Bridleways linking Diddington Village with the River Ouse and Little Paxton Nature Reserve".
As the work is on a private site, it my not get picked up through regular County Council planning distribution lists, so this is creating a new issue to create a placeholder for any discussion about the plans.
Created by Steven Moseley // 1 thread
Outline Application, all matters reserved: Existing Dwelling House retained and refurbished with smaller Garden. 3No. new detached 3- bedroom Dwelling Houses.
Created by Jean Dollimore // 1 thread
Goods Way has been one way westbound for motor vehicles for most of its length during recent construction works. The section between the Kings Cross Station service road and York Way is two-way to allow service and construction vehicles to access York Way directly. Two-way cycling has been maintained right along Goodsway.
Camden proposes to make the current arrangements permanent
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use from offices (B1) to dwellinghouses (C3)
Tom McKeown // 1 thread
Access to Impington Village College has not been looked at in any detail since the college opened in 1939. What issues are there for cycling to the college? What opportunities are there to make improvements?
Created by Jean Dollimore // 1 thread
The main proposal is for a new Zebra crossing outside the Harmood Children’s Centre
The new zebra will be 6.5m wide and replaces a 12+ m wide crossing with a pedestrian island. The consultation says: “Reducing the carriageway width can also have a traffic calming effect.
Space will also be provided for rain gardens (SUDs) and cycle parking for 6 to 8 bikes
The other proposal is to provide a temporary bus stand for the 27 bus during the Morrisons development and to relocate the affected parking bays. The new bus stand will be beside the Denton residential block at the northern end of Ferdinand Street.
Created by Roxanne (CEO) // 1 thread
https://www.cambridgesciencepark.co.uk/cambridge-science-park-north/
Trinity College has begun to consult on a proposal to transform a parcel of adjacent agricultural land to the east of Histon and Impington into Cambridge Science Park North. The proposal is at early stages with a submission having been made into the Call for Sites process which forms part of the Greater Cambridge local plan
Science Park North will be created on land which is currently used for farming, but is located close to the Park and Ride and the waste transfer site which are both accessed from the A10.
It is located close to the Area Action Plan land to the east and the Project Team is working closely with AAP Members on a number of areas which are of mutual interest. It is anticipated that the timescale for the AAP process will match the development timescale for the Greater Cambridge Local Plan and the CSP North timetable is planned to complement this.
CSP North is also located close to Cambridge Regional College, which sits between the existing science park and the proposed expansion land. Discussions are underway with CRC with the ambition of providing facilities for greater collaboration in the future which could be in the form of expansion but also education and work apprenticeship schemes for future students of the CRC.
The transport strategy for Cambridge Science Park North is targeted at complementing the improvement plans for the existing science park. The initial aim is to ensure that there is no increase in car use across the two sites, with a medium and long-term target of reducing car usage across the two sites completely.
The early ideas are to provide a consolidated space for parking which will serve both Science Park sites, which will be linked to a mobility hub providing pedestrian, cycling, autonomous vehicle and sustainable mass transit facilities for onward travel. These will utilise existing infrastructure such as Mereway Cycle Route and the Guided Busway as well as proposed infrastructure such as The CAM.
These proposals will improve access to the whole of Cambridge, reducing current traffic on the Milton Road by providing a hub serving the wider AAP area including access to Cambridge North Station.
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Cambridgeshire communities must work together for a green recovery from Covid-19 and to play our part in reducing carbon emissions. Zero Carbon Streets is the campaign that brings local groups together to do this.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01609/FUL | Demolition of existing HMO and construction of 7 no. replacement 1 bedroom apartments and 1 no. restaurant | 60 Mill Road Cambridge CB1 2AS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01764/FUL | Conversion of 3bed dwelling to 2no. 1bed flats and 1no. 2bed flat, following a part two storey side and rear and part single storey rear extensions. | 45 Kings Hedges Road Cambridge CB4 2QE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01697/FUL | Retrospective change of use (Use Class C3 or C4) to a large house of multiple occupation (Use Class Sui Generis). | 40 Hanson Court Cambridge CB4 2SE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02148/PRI03O | Prior approval for a change of Use from Offices (Class B1(a)) to 1 No. Dwellinghouse (Class C3). | Anglia Accommodation Services 190 Green End Road Cambridge Cambridgeshire CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01791/FUL | Construction of a 1 bed bungalow | Land Rear Of 190 Green End Road Cambridge Cambridgeshire
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 201309: Demolition of existing structures & redevelopment to construct 4 No. three bed residential dwellings (Class C3) with associated garages, car parking & access. All matters r
Created by Steven Moseley // 1 thread
Erection of new dwelling (previously approved under 172115)
Created by Steven Moseley // 1 thread
he Essex County Council (St Nicholas Street, Colchester) (One Way) Order 202*Statement of ReasonsSummary of the LocationSt Nicholas Street, Colchester, illustrated on drawingref. 169_HAT_GA_110 Rev. B.Reasons for the Proposed ChangesThis one-way restriction is part of a wider public realm improvement project proposed by Colchester Borough Council for the area around St Nicholas Square. For details of the proposed development, visit their webpage https://www.colchester.gov.uk/info/cbc-article/?id=KA-035711Benefits of the Proposed ChangesTo enhance the public realm in St Nicholas Square, and minimise carriageway to create enhanced footways and space availablefor outdoor seating. The key aims of the St Nicholas Square project are to:• Create a more pedestrian friendly environment, less dominated by car anddelivery traffic• Create more outdoor seating space for cafés and restaurants to spill out• Createspace for market stalls and events to happen• Ensure the space is accessible to all usersA number of local Councillors have been supportive of the scheme and the overall ambition to create a more pedestrian friendly and open square, which supports local businesses through the creation of more external seating areas, more space for markets and events, and increased footfall in the long term.CBC have secured central government funding enabling the project to move forward.
sound+fury // 1 thread
It's unclear if there is any cycle parking related to this attraction.
Created by Rosamund Humphrey (Admin Officer) // 2 threads
21/01625/FUL | Refurbishment, reconfiguration and extension of the existing chapel building to create an improved day nursery facility with external play area and 13 residential apartments (following part demolition), together with associated landscaping and infrastructure | Church Hall 6A Chapel Street Cambridge Cambridgeshire CB4 1DY
Created by Steven Moseley // 1 thread
Proposed Change of Use From Stables to Medical Clinic (class E) & Refurbishment of Structure. Clinic to be used as a private GP clinic and for other allied medical professionals like Physiotherapy. Existing vehicular access to be upgraded.
Created by Steven Moseley // 1 thread
Change of use of stable/outbuildings/annexe to form a single dwelling
Created by Steven Moseley // 1 thread
Erection of four bedroom detached house
Created by Steven Moseley // 1 thread
Erection of 2 No detached single storey dwellings with attached garages, existing dwelling and garage to be demolished and alterationsto existing vehicular access
Created by Steven Moseley // 1 thread
Redevelopment of site to residential comprising of 9 flats.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)