Planning app 12/0408/FUL: substantial residential development behind Greens off Cromwell Road
Construction of 136 residential units (class C3) with associated car parking and landscaping.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by David Earl // 1 thread
Construction of 136 residential units (class C3) with associated car parking and landscaping.
Martin Lucas-Smith // 2 threads
Mill Road suffers from a dreadful lack of cycle parking.
Coming from Oxford Street, trying to get to the coach stops is quite difficult.
Created by Jim Chisholm // 2 threads
For several years there have been proposals, counter proposals, and problems over access over partly Trinity College land that should give good cycle commuting routes from Bar Hill, Dry Drayton, Madingley and even Hardwick.
We need to work with NW Cambridge team at the University, Trinity College, Bidwells (Trinity's land agents), County, SCambs, and Local Parish Councils
If a solution can be found S106 monyey is available
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Martin Lucas-Smith // 1 thread
The speed limit here is currently 40mph.
Martin Lucas-Smith // 1 thread
The North West Cambridge site proposes traffic calming changes in Oxford Road and Windsor Road.
Proposals at:
http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=LRVINSDX01D00
then click on this second link:
http://idox.cambridge.gov.uk/online-applications/files/31B8D2EEB48A4F65255321E5DF860E38/pdf/11_1114_OUT-TRANSPORT_ASSESSMENT-857517.pdf
and scroll to numbered PDF page 26.
Created by Gregory Williams // 1 thread
A new Sainsburys supermarket is proposed at Westgate-on-Sea. The cycle infrastructure in this location is poor and this is an opportunity to help improve it.
Created by Shaun McDonald // 0 threads
Part of the TfL junction review http://tfl.gov.uk/junctionreview
11/0008/FUL was recently rejected by the Planning Committee but the club only have the lease till the end of the 2013 season having sold it to developers. It's likely some kind of development will occur on this site since the club needs the money.
The Old Press/Mill Lane supplementary development plan was adopted in 2010. Things have been quiet since then but the University still have plans to refresh this area. Part of the plan involves making Granta Place shared use.
Martin Lucas-Smith // 12 threads
Various related matters regarding the new CB1 development, e.g. new housing blocks and their cycle parking, routes through the development.
For issues relating to cycle parking at the station itself, see:
http://www.cyclescape.org/issues/36-cycle-parking-at-the-station
instead
Created by cobweb // 1 thread
Coming up in the Planning Committee meeting for April 4th, 9.30am.
Created by cobweb // 3 threads
Outline planning permission was given in 2008 for this development of up to 347 houses. In 2011 a reserved matter relating to the design on the junction was refused by the Joint Development Control forum. This is still a subject of debate. Another concern is the path adjacent to Babraham Road which is much used by staff at Addenbrooke's either on foot on by bike.
Martin Lucas-Smith // 21 threads
The Cambridge City, South Cambridgeshire, County Council Strategic Transport and Spatial Planning Group are considering a new Transport Strategy for Cambridge (TSC).
Other transport strategies will no doubt emerge in future.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by cobweb // 7 threads
A development of 1,780 houses, including community facilities, roads, footpaths and cycleways. Frontage land has already been built on (this is the land facing Huntingdon Road) and outline planning permission given.
Created by cobweb // 4 threads
A development of 1,200 homes and a country park to the south of Cambridge.
Created by Klaas Brümann // 1 thread
Cllr Sabastian Kindersley (LD, Gamlingay) writes in a letter in todas Cambridge News that "the university plans to rebuild the road bridge linking Haslingfield and Barton. ... chance to provide a safe combined pedestiran/cycle path down on to the track so residents can avoid the narrow and dangerous road and so access the A603 safely. The approx cost of this work is £40,000.
What do we know about this?
Martin Lucas-Smith // 6 threads
South Cambridgeshire District Council are reviewing their Local Plan. It is important that cycling issues are dealt with and brought to their attention during this process.
Martin Lucas-Smith // 9 threads
The Great Kneighton (Clay Farm) development will have effects on cycling. A series of planning applications have been passed and more will come.
Anon // 0 threads
Department for Transport press release 23 March 2012:
http://assets.dft.gov.uk/press-releases/20120323a/east-england-fact-sheet.pdf
Cambridgeshire "Better Bus Area Fund"
Cambridgeshire will receive £1,724.000 to improve accessibility, bus journey times on key bus routes in Cambridgeshire. The changes will include new traffic management on four corridors into the city, bus priority, upgraded buses, improved interchanges (including with Guided Busway), smart ticketing top-up on street and real time passenger information. For further information, go to http://www.cambridgeshire.gov.uk/NR/rdonlyres/1BA212D3-E038-47C5-9E0A-50E2BDBE3AB7/0/CambridgeshireBBAFproposalFINAL.pdf.
The proposals include much of relevance for cyclists, including bus priority at junctions, a "bus gate" through the middle of Mitcham's Corner and more.
Created by Simon Nuttall // 1 thread
A campaign member and resident of the area has sent this:
I've just received a consultation paper from the City Council for residents of Stanley Road, Garlic Row and Oyster Row. I've summarised the proposals below.Scheme 2 Option B seemed the most significant.
Scheme 1. Extension of parking and loading restrictions on Stanley Road
Scheme 2, Option A. "No entry except cycles" on Garlic Row adjacent to the junction with Mercers Row
Scheme 2, Option B. Oyster Row becomes one-way in the northeasterly direction. No exemption for cycles.
Comments to Gavin Card at the City Council by the 30th March (gavin.card@cambridge.gov.uk or PO Box 700, CB1 0JH)
Created by Rohan Wilson // 0 threads
The Grove Pub. Transport Statement recognises that 19 cy spaces should be provided (1 per 15sqm public space), states they are in "garage" but details not given, just assumed space available. Needs closer look. TRICS database for a Leeds Sikh Temple shows no cycling, 16.4% walking, 3.6% public tpt.
Created by George Coulouris // 0 threads
The Foot tunnel should be more accessible
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Shaun McDonald // 2 threads
The cycle parking outside the Sainsburys is damaged, some stands are bent, others are missing.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout