Hospital Rd - Southway ramp
The current stairs and ramp down to Southway from Hospital Road prevent cycles using what would be a useful node in the wider cycle network.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
The current stairs and ramp down to Southway from Hospital Road prevent cycles using what would be a useful node in the wider cycle network.
Created by Steven Moseley // 1 thread
"Linking the A120 and A133 with a new road will unlock land to provide housing and business space, improving connectivity locally and within the wider region. It will serve a new Park and Choose site and manage traffic congestion going to Colchester Town Centre, the University of Essex and its Knowledge Gateway Technology and Research Park.
A Rapid Transit System that will prioritise public transport on a key route through Colchester. It will enable housing and business growth, allowing new and existing residents to benefit from frequent, high-quality, reliable transport connecting to the key destinations within the town. These types of system have proved successful in other towns and cities, helping create a shift away from car travel. A recently implemented example of this is the Belfast Rapid Transit Glider.
The system will service a new Park and Choose site on the proposed new community east of Colchester and help to better connect future growth areas with the rest of the town."
Created by Steven Moseley // 2 threads
"Braintree, Colchester and Tendring Councils along with Essex County Council joined together to put forward plans for three new settlements built to Garden City Principles.
The three sites based west of Braintree, on the Braintree / Colchester border and on the Colchester / Tendring border could deliver up to 43,000 new homes along the North Essex A120 corridor with significant employment opportunities and transformational new infrastructure over the next 50 years."
In May 2020 the planning inspector found the other two proposed settlements to be unsound, leaving East of Colchester as the only one of the three that could proceed.
Created by Shaun McDonald // 1 thread
Erection of multi-storey car park and ancillary buildings; Creation of access road and paved external spaces; Re-location of site access onto Friars Bridge Road. Outline application to consider access, scale and layout only (landscaping and appearance as reserved matters).
Portman Road C Car Park Portman Road Ipswich Suffolk
Ipswich
Application reference : 20/00398/OUTI3
Created by John Chamberlain // 1 thread
Road Closure on Howland Street every weekend in June
rskedgell // 0 threads
The section of Leytonstone Road E15 between number 165 and Cherry Tree Road had a single yellow line waiting restrictions, loading restriction kerb markings and bollards until 2017-18 when the road was resurfaced. A new advisory cycle lane was introduced, but the yellow lines and kerb markings were not reinstated, although I can find no evidence that the traffic order has been revoked. Footway parking has since become a serious problem here, both narrowing the available width of the footway and obstructing the cycle lane. The single yellow line and kerb markings need to be reinstated. As CEOs seem unable to enforce the footway parking, consideration should also be given to converting the cycle lane to a mandatory lane, which would enable CCTV to be used to issue PCNs by post from 22 June 2020 (there is a Newham CCTV camera at the corner of Leytonstone Road and Gurney Road).
Created by Roxanne (CEO) // 1 thread
Collection of advice for people who cycle or are thinking about cycling.
Installation of an internally illuminated Digital Interactive Wayfinding Totem displaying walking routes and cycle, bus and train information, replacing existing real time bus information sign.
Cambridge Railway Station Station Road Cambridge Cambridgeshire CB1 2JW
Cambridge
Application reference : 20/01850/ADV
20/02171/OUT | Outline planning application for the development of Northstowe Phase 3A for up to 4,000 homes, two primary schools, a local centre (including employment, community, retail and associated services, food and drink, community, leisure, residential uses and other accommodation), secondary mixed use zones (including employment, community, retail and associated services, food and drink, community, leisure, residential uses), open space and landscaped areas, sports pitches, associated engineering and infrastructure works, including the retention of the existing military lake and creation of a new lake, with details of appearance, landscaping, layout, scale and access reserved. Application is accompanied by an Environmental Statement and involves works to/affecting existing Public Rights of Way. | Northstowe Phase 3A Rampton Road Longstanton Cambs
Created by Tim Burford // 2 threads
Cambridgeshire County Council has removed the cycle lane markings on Shelford Rd, apparently as part of their response to Covid-19 - but the roadside signs are still in place. Who knows what the plan is?
Photos on Cyclestreets at #124215 to 124265 (only 7 photos, but the numbering seems to have gone mad).
Created by Edward Taylor // 1 thread
Brief proposal for temporary measures in Milton.
Raised as a result of COVID-19 distancing measures
In addition to or in concert with suggestions arising from Spaces to Breathe
1. Use a point closure at the north side of Cambridge to forbid southbound through traffic. Why? It eliminates through traffic in Milton, especially at peak times. There are other versions of this idea for Milton, such as modal filters. Driving into Milton centre should be further discouraged in favour of the A10 bypass.
2. Implement a 20mph speed limit throughout Milton. Why? Reducing speed limits slows down drivers, a bit. It shifts the balance in favour of walking and cycling. The street environment becomes calmer, cleaner and quieter. In residential areas, there are more walkers and people just drive slower naturally. In these areas, cycling and walking becomes more pleasant and statistically safer. Fatality rate in collisions drops significantly.
3. Remove on-street car storage on Cambridge Road / High street. Why? On-street car storage encourages people to choose the car when making journeys within Milton. (I've done it myself.) Nowhere within Milton is more than a 3 minute cycle journey away.
4. Give cyclists and pedestrians priority at several key junctions on the Milton-Cambridge cycle route.(Winship road to Cambride Road) Why? To encourage people to use these routes and improve safety.
The DfT has made it clear that the money will only be allocated for measures that truly make space for cycling (please let me know if you want to see the letter, as it has not been widely shared). Those painted lanes do not meet the criteria set by the government, so they will have to be paid by Cambs Highways.
The deadline for councils to bid for the funds is Friday June 5th - in 6 days! If anybody has got any follow up suggestions I would suggest emailing our concillors well before that date, as any measures proposed will also have to be reviewed by Cambs Highways before they are sent off.
sound+fury // 1 thread
Change of use from Class 1 to Class 3 residential. See thread for more.
Condition 17 - Cycle parking and Refuse storage
1 Mere Way Cambridge Cambridgeshire CB4 2JP
Cambridge
Application reference : 17/1894/COND17
Created by Anna Williams – Head of Campaigns & Engagement // 0 threads
The Greater Cambridge Partnership (GCP) has secured up to £400m of funding for the second stage of the City Deal.
20/01474/REM | Reserved Matters application pursuant to application 07/0620/OUT for Phase 3 of the Community garden at Clay Farm, to include a permanant community building (replacement of temporary building), new central east-west footpath through community garden and new cycle link to western edge of site. | Land South Of Long Road And East Of Hobson's Brook Clay Farm Development Site Long Road Cambridge
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Modification of planning obligations (Affordable Housing tenure) contained in a Section 106 Agreement dated 11 July 2018 pursuant to planning permission 17/2214/FUL.
Land At Anstey Way Cambridge Cambridgeshire
Cambridge
Application reference : 20/02289/S106A
Created by Tim Burford // 1 thread
www.cyclestreets.net/location/115949/ to 115951 -
After all our correspondence with the chief exec of Highways England this is a pretty clear two fingers to all non-motorised users - the shared-use footway comes to a sudden end dumping north/westbound cyclists et al in the south/eastbound side of a dual carriageway with a 'safety' barrier blocking the way across. Insane.
Created by Roxanne (CEO) // 3 threads
What makes a good school street?
Where should we have school streets in Cambridge?
How can we campaign for school streets?
20/02142/OUT | Outline planning application for the development of Northstowe Phase 3B, comprising up to 1,000 homes, a primary school, secondary mixed use zone (with retail and associated services, food and drink, community, leisure, employment and residential uses), open space and landscaped areas, engineering and infrastructure works, with details of appearance, landscaping, layout, scale and access reserved. Application accompanied by an Environmental Statement. | Northstowe Phase 3B Station Road Longstanton Cambs
Thom S // 1 thread
Wide road with narrow pavements and marked parking bays on both sides taking up half the width of the footpath
Could we propose to LBHF that left and right turns here are cycle-only, creating low-traffic neighbourhoods east and west of Wandsworth Bridge Road, allowing safe cycle access from Putney to Embankment?
Created by Casey // 1 thread
In order to create a safe cycling and active transport environment we need to point out what we need, where.
In line with the policy announcement from Grant Shapps MP changes should be urgent and immediate so this is a space to plan, map them out and look at detail. We have the benefit of this being a forum where we have access to a lot of expertise in technical detail so feel free to suggest, upload photos, discuss, wish.
Created by Jim Chisholm // 1 thread
We need a front page link to sections about bike maintanace (links to YouTube videos) and tips for novice (or returning riders) Cycle Streets/ Bikeability etc (there were articles about maintence in old newsletters.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Environment and Scrutiny Committee consists of eight councillors who scrutinise the decisions of the Executive Councillor for Communities, Executive Councillor for Climate Change, Environment and City Centre, plus the Executive Councillor for Streets and Open Spaces.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Brown // 1 thread
Conflict between pedestrians and cyclists on stretch of CGB shared-use path alongside allotments and CGB in Trumpington
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Created by George Coulouris // 7 threads
This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:
1. Safe routes to schools
2. Areas without through motor traffic (AWTTs)
3. Protected space on main roads/major junctions
4. Safe cycle routes via parks and canals (Greenways)
5. 20mph speed limits
6. Liveable town centres
so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by TMiles // 0 threads
Cyclists benefit from an almost continuous cycle or bus lane along the A660 from the city centre. This route is much used by students cycling between central university campuses and accommodation in north-west Leeds.
After the central traffic lights in Headingley, the cycle lane ends and the road narrows. Although the road later widens out to two lanes, there is a stretch (marked on the map) where cyclists have insufficient space on what is a busy radial road.
There are two possible solutions here. The first would be to widen the north-west bound lane to allow a standard width cycle lane to be marked out. The second option would be to add a phase into the traffic light sequence that grants cyclists a ~10 second head start to clear this narrow stretch. This solution could involve detectors in the cycle lane upstream of the lights to avoid its unnecessary activation. It would also allow cyclists to position themselves better for the next junction, where traffic is split into two lanes.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.