Unhappy pavement 'cyclepath'
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Debra Storr // 1 thread
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
Created by Debra Storr // 1 thread
Shared cyclepath fizzles out with a short length of a parallel roadway providing the infill. Uncomfortable.
Created by Debra Storr // 1 thread
This is a 40mph distributor road which is currently fairly quiet. But many houses are planned in this location. It would have been helpful if the pavement has been built a bit wider and designated as a shared path/cycleway. Even better would be an actual cycleway but we can press for that with the development.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Debra Storr // 1 thread
With a existing cyclepath on south-west of roundabout and a proposed cyclepath on the north east side, the issue of a crossing at the Murcar roundabout needs to be resolved.
Created by Debra Storr // 1 thread
While part of new Balmedie-Blackdog route is tarmac, the southern portion has been left as gravel/ground and will undoubtedly get worse in winter. Funds are being sought to improve.
Created by Debra Storr // 1 thread
Consultation open until 18th August 2019 on cycleway as shown.
Unresolved issue of connections into Blackdog from bus stop on dual carriageway and connection at Murcar onto existing shared cyclepath on west side of dual carriageway.
Created by Hounslow Cycling Campaign // 1 thread
The London Borough of Hounslow is consulting on the Local Plan Reviews for the Great West Corridor and West of Borough opportunity areas. The Local Plans set out planning guidelines for major developments in the respective areas. Each Plan includes a section on "Connecting People and Places" that covers transport aspects of developments.
Steve Curran, the Leader of Hounslow Council, refers to the negative impacts of major roads crossing the Great West Corridor area in his foreword. "Attractive alternatives to the private car" described in pp74-83 of the consultation document include improved walking and cycling infrastructure. Proposals for two new rail links will be rather more expensive.
Councillor Curran expresses concern about the environmental impact of a Third Runway at Heathrow Airport on the West of Borough area but also points out the regeneration opportunities. "Attractive alternatives to the private car" described in pp78-85 of the consultation document include improved cycling and walking infrastructure.
Reserved matters application pursuant to outline approval 06/0796/OUT (amended by Section 73 approval 17/2258/S73) for: an R and D Enabling Building of 13,197 sqm; an Amenities Hub of 3,261 sqm; associated car, motorbike and cycle parking including a Multi Storey Car Park; a temporary Multi Use Games Area; hard and soft landscaping; and internal roads, supporting facilities and ancillary infrastructure.
Astrazeneca Uk Ltd Cambridge Biomedical Campus Francis Crick Avenue Cambridge Cambridgeshire CB2 0AA
Cambridge
Application reference : 19/1070/REM
19/1010/FUL | Conversion and extensions to the existing buildings including demolition of the existing block to the rear of 1 Godesdone Road to deliver a mixed use development comprising a ground floor retail space and 12 1xbed residential units (net increase 9) to the rear and above along with cycle parking and associated infrastructure. | 185-189 Newmarket Road And 1 Godesdone Road Cambridge Cambridgeshire CB5 8HA
Martin Lucas-Smith // 1 thread
Creation of a cycle storage area equiped with racks to facilitate appprox 200 cycles following removal of a large white birch tree to undertake repairs to building caused by tree roots.
Robinson College, Porters Lodge Grange Road Cambridge CB3 9AN
Cambridge
Application reference : 19/0926/FUL
Demolition of existing flats 66-80b Colville Road and erection of 69 affordable dwellings, including 6 houses and 63 apartments, including resident and public car parking, landscaping and associated works
66-80B Colville Road Cambridge Cambridgeshire CB1 9EJ
Cambridge
Application reference : 19/1034/FUL
The A14 works have closed the east side pavement/cyclepath for some amount of time.
This either forces people to cross the rode via 4 toucan crossings (and cycle or walk up a very narrow stretch) which is technically not a cycle path I believe. Alternatively people have to cycle on road across a busy 2 lane 60mph limit roundabout.
sound+fury // 1 thread
Created by Peter Loader // 1 thread
Create an unsegregated cyclist/walker area in the paved area that was produced when the northern arm of Northway, Rickmansworth became traffic-free. Call it Northway Square. This would become the centre of Rickmansworth's cycling/walking network, with Bikeability level 2 routes leading:
* To National Cycle Network Route 61 (The Colne Valley Trail at the Aquadrome), to Mill End, and to Maple Cross.
* To Rickmansworth Station, to Chorleywood, and to The Cedars Estate,
* To Croxley Green, via Three Rivers District Council's car park.
Upgrade the existing public footpath to a bridleway so the route remains on the definitive map.
Martin Lucas-Smith // 1 thread
The section of East Road at the police station end, with the cycle lane, suffers from absolutely rife pavement parking and parking in the cycle lane.
Created by Alex Jenkins // 2 threads
The draft Tower Hamlets Transport Strategy aims to improve the way we move around our borough.
Tower Hamlets is one of the country's fastest growing boroughs. Our roads are the busiest in the UK.
77 per cent of our residents are exposed to unsafe pollution levels, children in the borough have on average up to ten per cent less lung capacity and 43 per cent of Year 6 school children are overweight or obese.
According to Public Health England, pollution is linked to increasing rates of asthma, heart disease, dementia, lung cancer and low birth weight.
The new strategy aims to address these concerns and look at what the council and residents can do to make travel cleaner, safer and accessible for everyone.
Promoting walking and cycling is at the heart of plans to help meet the Mayor of London’s target that 90 per cent of all trips in the borough should be made on foot, by cycle or by using public transport by 2041.
Over the next two months, the council will be asking all those who live and work in the borough to get involved, share their ideas and help shape the future of travel in Tower Hamlets.
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S/2413/17/OL as varied by Section 73 application S/4116/18/VC for the erection of up to 200 residential dwellings (including 40% affordable housing), demolition of no. 117 Rampton Road, introduction of structural planting and landscaping, informal public open space and children's play area, surface water flood mitigation and attenuation, vehicular access points from Rampton Road and associated ancillary works.
Land Off, Rampton Road, Cottenham, Cambridgeshire
South Cambridgeshire
Application reference : S/2549/19/RM
Tom McKeown // 1 thread
The mouth of Cotteham Road is wide and fast. How do we get this improved? Especially in the context of the new school.
Created by Martin Gorst // 1 thread
Ealing Council is consulting on a new scheme for the area outside Ealing Broadway station.
Reduction in Cycle Parking
As part of the scheme, Ealing Council plans to remove 59 cycle stands on and near Haven Green and replace them with 29 stands along the Broadway. This will remove parking for 60 bicycles. As Haven Green is common land, the cycle stands on the grass are only temporary. At some point they will need to be removed. Ealing Cycling Campaign has repeatedly urged the council to earmark a site near Ealing Broadway station for permanent cycle parking. A good location would be the car park along the south side of Haven Green. Unfortunately the council has still not been successful in acquiring the required land, and has not yet decided to instigate compulsory acquisition procedures, or otherwise escalate the process.
At times of peak demand, the cycle stands near Ealing Broadway fill up, and people lock bicycles to trees and other objects. With the arrival of the Elizabeth Line and the new cycleway to Greenford, the demand for cycle parking at the station will grow.
Where’s the Cycle Lane?
The new plans don’t include the contraflow cycle lane (below) the council promised six years ago.
For over 20 years Ealing Cycling Campaign has lobbied the council to build a contraflow cycle path to run along the east side of Haven Green (but not on the common) to link the Mall with the roundabout at Madeley Road. This will provide a direct route to and from Ealing Broadway station so people don’t have to cycle around the Arcadia Centre and Haven Green. In 2013, the council included the cycle path in its mini Holland plans. However, it has disappeared from the latest proposals. This goes against the council’s transport policy for its cycle network, which states: “Where one-way streets are implemented, the default position will be that contra-flow cycle lanes will be provided.”
sound+fury // 1 thread
The changes themselves are not controversial. (College doing some refurbishment of property for student use.) However, for a 7 bed house, they propose only 6 bike rack spaces.
Anon // 1 thread
We would like your views on suggested changes to the controlled parking zone on your road
In 2018 we asked you if would like us to make any changes to the Bermondsey CPZ 'G'
As part of this survey we sent out a total of 9,517 surveys and received a 4% response rate. 65% of those who responded wanted the current parking restrictions to be amended with 61% stating that they struggle to park on a Saturday. We would now like to know in detail the changes that you would like us to make.
We know, from the original survey and changes in the area such as residential developments and an increase in bars and restaurants, that parking stress has increased and we would like to know what changes you would make.
If we receive a majority in favour of amending the operating times and hours of Zone ‘G’ we will put forward a recommended amendment to the Cabinet Member for Environment, Transport and the Climate Emergency to make a final decision.
In addition to potential changes to the operating hours of the controlled parking zone we would also like to know if residents and businesses in the Shad Thames area would like their own separate zone. This would mean that permit holders in this area would have their own permits and would only be able to park in that area.
This decision would then be subject to statutory consultation.
What are the pros and cons of extending the operating hours of my parking zone?
Pros
Cons
If we were able to reduce the amount of vehicles parked in the area, we could consider introducing a variety of street improvements as detailed below:
Created by George Coulouris // 1 thread
Royal College Street works 8th July -16th August
The planters will be replaced by granite kerbs – affecting RCS south of Baynes Street.
The works will start on 8th July and are expected to be completed by 16th August 2019. During the works, northbound cyclists will be diverted to use the with-flow traffic lane whilst southbound cyclists will be diverted to use St Pancras Way.
We will keep you informed here as to which segment of the cycle track is currently unavailable.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Group looking at issues for active travel in the Chesterton area.
sound+fury // 1 thread
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by wookey // 2 threads
Out of the A1307 Linton Greenway consultation has come a plan for the section between Addenbrooke's roundabout and the Babraham P&R, which the county/GCP are keen to move forward. There was an initial invite-only consultation event on Thur 31st Jan for local residents/residents associations to comment.
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Lewisham Cyclists // 1 thread
Royal Borough of Greenwich consultation on improvements to road junction at Blackheath Gate of Greenwich Park for Quietway 1 extension.
Consultation closes 19th April 2019.
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Simon Still // 1 thread
Brixton Liveable Neighbourhood aims to realise the great potential Brixton has for walking and cycling while improving air quality, reducing congestion, supporting local businesses and providing for the growth in jobs and homes planned for the area.
We successfully bid for funding from Transport for London (TfL) to deliver these aims. At the heart of our proposal is transforming Atlantic Road in the town centre, but the ambition goes well beyond this, with proposals to create ‘low traffic neighbourhoods’ in adjacent residential areas that link communities together and ‘healthy routes’ for walking and cycling. Brixton Liveable Neighbourhood is the cornerstone of Lambeth’s Draft Transport Strategy, which seeks to allow people to live healthier lives and create better places for everyone to enjoy.
This is the first stage of consultation, collecting resident and user comments about the area.
Created by Jean Dollimore // 1 thread
Fleet Road is a one-way street with heavy motor traffic and no protected cycle infrastructure. This means that people cycling through the area face unpleasant interactions with motor vehicles as well as needing to make diversions to reach destinations in the area,
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Residents of Beaumont Square and the surrounding area raised concerns about rat-running and the problems it causes in local streets. You may remember that the Council previously consulted residents on traffic management proposals to reduce traffic speed in the area; many of which were strongly supported and have now been implemented. A number of additional ideas were also put forward by residents which have now been considered and we would appreciate your opinion on whether they should be introduced.
One of the problems is the level of traffic trying to avoid the traffic lights at the A11 Mile End Road/White Horse Lane junction. Drivers cut through either Beaumont Square or Eastbury Terrace through to Beaumont Grove to join A11 Mile End Road junction causing safety concerns, particularly for the nursery and nuisance to local properties. In addition, Beaumont Grove suffers problems relating to parking for surrounding shops and takeaways.
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.
Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Paula Downes // 4 threads
The road is unloved, has very few trees, has a lot of traffic, moving fast or jammed. Air quality is poor. Cyclists cycle along the pavement very fast which is dangerous for pedestrians. The cycle lanes on the road are not safe. It is difficult for cyclists to cross the road since there are not enough crossings. A lot of people park near Coldhams Common on Saturdays. Many people have created driveways to avoid people parking in front of their houses in the parking bays. Crossing the little roads (Brampton, Vinery Road, Vinery Way) is difficult because the cars block the path as they wait to get onto Coldhams Lane and greenery prevents pedestrians from going behind those cars.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Created by Stuart Johnson // 1 thread
Currently there is no entry from Creffield Road to Maldon Road, this means cyclists have to divert via Inglis Road which is a poor junction for cyclists. A request has been submitted for changes to the juction to let cyclists enter Maldon Road from Creffield Road. It's understood that Cllr Sue Lissimore has subimtted this to the Local Highways Panel (LHP).
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Finlay KM // 1 thread
A new set of barriers has appeared on the hospital side of the usway bridge at Addenbrookes.
Creates the usual set of problems for cargo bikes and less confident bike users, with the added bonus of being on a steep hill that ices up regularly, and right next to a busway with a record of squishing people who fall onto it.
Created by Steven Moseley // 1 thread
The, albeit contrived, design expects cyclists travelling East (from or across Rawstorn Rd.) into Crouch Street to use this spur to cross to the opposite ("shared use") pavement to avoid the angled parking along the North side of the street. Unsurprisingly, the spur isn't well used, while the short stay spaces are often full, so the spur is regularly used for parking.
Created by Roxanne (CEO) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Created by Stefano B // 1 thread
New TFL survey on the proposed Wembley to Willesden Junction CS.
Have your say - Healthy Streets improvements between Wembley and Willesden Junction
Transport for London (TfL) and the London Borough of Brent are working together to develop Healthy Streets improvements between Wembley and Willesden Junction. These changes would make it easier and safer to walk, cycle, and use public transport in the area. Making the area safer, greener and reducing car travel. In this area, every year, people are seriously injured, some fatally. This cannot go on, and the Mayor has set a target to reduce the number of deaths and serious injuries on London’s roads to zero by 2041. Toxic air quality and high levels of physical inactivity are also contributing to premature deaths and poor health, especially in children. Together we want to improve this, particularly around schools. We know to achieve this some compromises will have to be made especially how much we use cars to travel. We want to create a better environment for everyone who wants to travel to and around the borough. So we are inviting local people to tell us how they currently travel around the area and what changes they would like us to make that would help and encourage more people to choose active travel options in the community.
Have your say - Your feedback at this early stage of planning will be used to help design future proposals which would be consulted on in late 2020/early 2021.
Please complete the following survey by 22 March 2020 to help us better understand how you travel and any travel issues or priorities in the areas of Wembley Central, Tokyngton, Stonebridge, Harlesden, and Kensal Green. Please email wembleywillesdenjct@tfl.gov.uk if you have any questions, comments or suggestions.