Vision Zero Partnership
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
(Moved related thread created 2 months ago.)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 0 threads
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
(Moved related thread created 2 months ago.)
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Roxanne (CEO) // 1 thread
Further expansion of the Biomedical Campus
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of four dwellings, including a dropped kerb and associated infrastructure following the demolition of the existing buildings on site. | 8 Kings Hedges Road Cambridge CB4 2PA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Retrospective change of use from Hotel (C1 Use) to House In Multiple Occupation (HMO) (sui-generis) | Oakley Lodge 627 - 631 Newmarket Road Cambridge Cambridgeshire CB5 8PA
Created by Roxanne (CEO) // 1 thread
The Carter Bridge is looking worse for wear in many ways.
We've had a question about who is responsible for maintenance. Network Rail and Cambridge County Council, Cambridge City Council have apparently denied responsibility and there has been a suggestion that Essex County Council may be responsible.
What do we know about responsibility and previous actions to keep the bridge maintained?
Created by Will Bramhill // 1 thread
1960s roadbuilding seared through the town. Modern road planners have already provided a good toucan crossing between Wellesley Road and Crouch Street West across Southway/Lexden Road. Providing a better ramp from Wellesley Road would help facilitate this.
Essex Housing is redeveloping the Essex County Hospital site as housing. The company has agreed various cycling measures as part of this scheme. It has allocated £25,000 towards remodelling the Wellesley Road/Creffield Road/Maldon Road junction. Gwyn Owen, head of Essex Housing, has agreed that any money left over can be put towards a new, wider ramp. There may also be funds from the Local Highways Panel.
Created by Steven Moseley // 5 threads
Of and relating to Essex County Council.
Created by Steven Moseley // 1 thread
The response to, and effects of the coronavirus pandemic
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Steven Moseley // 7 threads
Policy Documents, guidance, consultations etc. from UK Government.
sound+fury // 1 thread
From the previous thread:
Key information:
The establishment of the new JDCC, composed of members from both South Cambridgeshire District Council and Cambridge City Council have now been completed and the previous JDCC has been dissolved...
'In terms of the remit of the new Committee, some cross boundary sites have been included that were not within the remit of the previous Committee ... both Councils have adopted Local Plans which include specific policy designations – some of which overlap the Administrative boundary of the two Councils. Whilst both Councils have created a shared planning service, this does not change the statutory position of the two Councils as distinct “local Planning Authorities” ... The additional sites include the North East Cambridge Area Action Plan areas within both City and SCDC, Cambridge Biomedical Campus/Addenbrookes site and the extension of Peterhouse Science Park/ARM on Fulbourn Road.'
Created by Rosamund Humphrey (Admin Officer) // 2 threads
Site: The Meadows Community Centre, Arbury
Proposal:
Erection of new community hub and 22 council rented affordable dwellings, car parking, replacement multi use games area, new vehicular access off Arbury Road and enhancements to the recreation ground and installation of substation (as part of wider proposal for the full Meadows site seeking permission for the demolition of existing community centre and the erection of a new community hub, 78 affordable dwellings, car parking, a replacement multi use games area, new play equipment, the creation of new vehicular accesses on to Arbury Road, Daisy Close and St Catharines Road, the provision of new landscaping and substation and the installation of drainage to the football pitch and associated land levelling together with land reprofiling).
https://consultcambs.uk.engagementhq.com/lancaster-way-consultation
Capacity improvements are currently underway to the A10/BP roundabout, required as part of the approved Lancaster Way Business Park expansion planning application.
This is a vital development to support economic growth within East Cambridgeshire and expected to generate 2,500+ jobs, 75% will be from the local area. Cambridgeshire County Council agreed to carry out a feasibility study encompassing the A10, BP and Lancaster Way roundabouts to assess the current congestion issues limiting future growth which was completed in October 2018.
This study identified that capacity improvements at the Lancaster Way roundabout would also unlock further benefits of the measures now being constructed at the BP roundabout. The County Council has started to look at what improvements could be made to the Lancaster Way roundabout and the Cambridgeshire and Peterborough Combined Authority and East Cambridgeshire District Council have agreed to provide funding.
The public have the chance to offer comments for consideration on the proposed design.
This consultation is to share the details with residents and receive feedback. We may share your information with our partners in this consultation (East Cambridgeshire District Council and Cambridgeshire and Peterborough Combined Authority) and with the council analysis team.
You do not have to give us any personal information. We will not publish any personal details you do give us, but may publish our response, and include it in public reports, with personal details removed. Personal data will be held securely, in accordance with data protection legislation. We will only store it for 12 months after the consultation results have been analysed and the consultation report published.
Please view the consultation information prior to completing this survey, online at https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/transport-projects/a10-a142-lancaster-way-roundabout(External link)
All surveys should be completed by the closing date of Friday 18 September 2020.
Your views on the project are welcomed.
It's the usual motorist-centric tripe of course, with ridiculous excuses for not building a signalised crossing ("it's rural" - nevermind that Babraham is also rural and they are doing it there).
Following Dft Phase 1 funding arising from the current Covid19 situation, designs are available for cycle lanes covering the approximate 3.2km length from the Haringey boundary to just south of North Finchley.
The design principle has been, where possible, to provide a temporary lightly segregated cycle lane, defined by wands, bolted into the carriageway surface at 4m spacings. In some cases, we have taken a cycle lane width of 2.5m. In other locations, where space permits, we have re-allocated the whole of a current running lane.
At other locations, we have needed to retain a ‘with traffic’ cycle route. In order to mitigate this, these sections of the route will be provided with carriageway cycle markings and signage as is usual, but complemented with the introduction of 20mph limits.
Monitoring of the route will take place (and indeed has already started) to assess cycle and motorised traffic volumes, as well as to assess any changes to the temporary layout that may be necessary.
In developing the design we have engaged with TfL’s cycling sponsors and have incorporated, where applicable, comments and suggestions from their design audit teams and our safety advisors. We have also obtained support from the police in respect of the 20mph limits.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Safety concerns have been raised around Coldham's Lane - specifically, the stretch running from Coldham's Lane roundabout to the Toyota garage.
These concerns ought to help inform proposals for the CL roundabout and the Marshalls land on Coldham's Lane.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
We're working towards a glossary of key terms to help members and the public.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02871/FUL | Erection of 1no. dwelling adjacent to No.30 Caravere Close - Resubmission of 19/0774/FUL | 30 Caravere Close Cambridge CB4 2UG.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02869/FUL | Conversion of single dwelling into two separate dwellings complete with additional rear extensions and loft conversion to main dwelling | 1 Silverwood Close Cambridge CB1 3HA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02821/FUL: Change of use from HMO (use class C4) to large HMO (8 person) (sui generis)
4 Moss Bank Cambridge CB4 1UR
Created by Steven Moseley // 1 thread
Thanks to planning hiccups in the 90s and 00s, there is a missing section of the path between Rouse Way and Meander Mews that prevents it from being used as an alternative for walkers and cyclists to Cowdray Avenue, or as part of leisure routes, e.g. a riverside loop.
Photograph: John Collett, Colchester Civic Society
This is a consultation about Abbeygate House
Created by Rosamund Humphrey (Admin Officer) // 1 thread
19/0261/NMA1 | Non-material amendment with respect to planning permission reference 19/0261/FUL (Erection of 3 no. retail units (2 x use class A1 and 1 x use class A5), 1no. Community Centre (use class D1) and provision of 14 no. dwellings (8 flats and 6 maisonettes) following demolition of existing commercial units and flats).) The amendments sought are the introduction of additional doors to the northern elevation of Block B, and the provision of a new external cycle store to Block B. | 74-82 Akeman Street Cambridge Cambridgeshire CB4 3HG
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Andrew Woodward // 1 thread
I have serious concerns about the safety of this portion of the bike path; arising from its recent re-design. Recently my 10 year old son was in a very close “near-miss” with a car turning off the A316 into Bicester Road; and I believe many more similar incidents are likely occurring. Eventually someone will be seriously hurt or killed on it.
However, the improvement in the track leads cyclists to feel more confident in using it – giving a false sense of security.
In particular:
• The segregated track makes it particularly appealing for inexperienced and more vulnerable cyclists (such as kids).
• This track design leads to an increase in the cyclists speed.
• The smooth/quick nature of the track leads inexperienced cyclists to believe that THEY HAVE RIGHT OF WAY across side roads.
• There are no markings on the roads to tell drivers coming in or out of side roads that cyclists could be on the track crossing their path.
• There is a particular challenge for EASTBOUND cyclists.
To avoid stopping at every side road, when on the track travelling Eastbound (as per red arrow on photo) approaching roads such as Bicester road, the cyclist has to simultaneously
(a) check to their FRONT/LEFT side to see if a car is exiting the side road
(b) check BEHIND them on their REAR/ RIGHT hand side to see if a car is about to swing off the A316 into the side road (usually at speed) - (as per orange arrow on photo).
This is a hard combination to perform – looking 180 degrees opposite directions at the same time. If you are an inexperienced cyclist, on an apparently safe track, it is very likely that you will not realise you have to be this vigilant and not check adequately for cars.
Hence, my boy rode across Bicester road from the east and was very nearly hit by a car turning off the A316.
(Note that travelling from the west is somewhat easier as both the vehicles turning in from the A316 and those turning out from the side roads are in your front field of vision).
My suggestions for improving this situation are:
(1) Clearly mark the bike track across the side roads so cars are aware there are cyclists approaching from the side.
(2) Ideally, give cyclists priority across the side roads; so making cars slow to a halt and making it more intuitive for cyclists.
(3) To facilitate this, would require some stopping space for traffic coming on/off the A316 to after the bike track crossing
At roads such as Bicester road the bike track could be curved to the south by about 2m before crossing the side road – this curve in the track would
(a) naturally slow cyclists down as they approach the side road
(b) would provide vehicles moving onto the A316 a decent gap so they can separate the concerns of first negotiating the bike track then focus on getting on the A316;
(c) for vehicles coming off the A316 the additional space would give them space to stop and give way to cyclists.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.