Created by Rosamund Humphrey (Admin Officer) // 1 thread
Replacement of an existing building with a development of 3 no. self-contained flats
21 Sandy Lane Cambridge Cambridgeshire CB4 1HZ
Cambridge
Application reference : 21/04212/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 3 dwellings along with off street parking, private amenity space, cycle parking/ storage and refuse storage, demolition of existing rear garage lean-to and reconfiguration of the pavement along Stanesfield Road
Land Adjacent To 25 Rawlyn Road Cambridge Cambridgeshire CB5 8NL
Cambridge
Application reference : 21/04190/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion and extension to provide seven flats
3-4 Market Hill Cambridge CB2 3NJ
Cambridge
Application reference : 21/04188/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Part demolition of outbuildings, erection of single storey annexe and change of use to 6 bed HMO (Sui Generis) for 6 persons
7 Kent Way Cambridge CB4 2QY
Cambridge
Application reference : 21/03983/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 2 no. 2 bed flats with associated bin and cycle stores
Land Adjacent King Hedges Road Cambridge Cambridgeshire
Cambridge
Application reference : 21/03991/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use to 11bed HMO for 11 persons (sui generis).
157 Shelford Road Cambridge CB2 9ND
Cambridge
Application reference : 21/03899/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03821/FUL | Extensions and alterations to pair of semi-detached dwellings to create 6x new apartments and 1x detached one bedroom unit. Improvements to front boundary wall and front garden area, including off road parking for 2 vehicles retained and bins and cycle store provided.
87 Perne Road Cambridge CB1 3SB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 6no. dwellings together with access, car parking, bin and bikes stores, landscaping and associated infrastructure
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 7 apartments comprising 1 x 2-bed and 6 x 1-bed units, including bin and cycle storage facilities, together with reconfiguring the pedestrian access to 56A and 58A Cherry Hinton Road and installation of a new ground floor rear wall to the retained retail unit at 56-58 Cherry Hinton Road, following demolition of existing warehouse building
Poor links from Eight Ash Green to Stanway, due to lack of cycling provision on the A1124, and lack of cycle crossing across London Rd.
Created by Steven Moseley // 1 thread
Conversion of existing 6 bed HMO (C4) into 9no. bedroom House in Multiple Occupation (HMO) for up to 9 people (Sui Generis) including the single story rear and side extensions approved under App Ref No's 211168 and 211243.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03437/FUL | Division of existing property into 4 no. 1 bedroom Flats including the construction of a single storey rear extension, two storey side extension and partial first floor extension. | 136 Mowbray Road Cambridge CB1 7TG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03508/FUL | Erection of 2 No. dwellinghouses together with associated access and landscaping works | Land To The Rear Of 368-370 Milton Road Cambridge Cambridgeshire CB4 1SU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03538/CL2PD | Certificate of lawfulness under Section 192 for a change of use of Unit 8 from Dwellinghouse (Class C3) to House in Multiple Occupation (HMO ( 6 bed )) (Class C4), retention of Unit 8A as a separated unit used as a Studio Flat and minor internal layout alterations. | 8 Oak Tree Avenue Cambridge CB4 1BA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03467/FUL | Construction of 4no, 1bed flats and associated external works to rear. |
17 - 19 Radegund Road Cambridge Cambridgeshire CB1 3RH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03439/FUL | Erection of 3 No. 1 bedroom duplex dwellings with associated landscaping, parking, bin and cycle storage. |
Land Adjacent To 22 Mill End Close Cambridge Cambridgeshire CB1 9HS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03498/FUL | Demolition of existing garages and area of hardstanding and erection of 3 No. dwellings together with car parking, landscaping, bin and bike stores and associated infrastructure.
Land At Borrowdale Cambridge Cambridgeshire CB4 3HU
Created by catch // 0 threads
Proposal for new traffic-free routes using mostly existing footpaths/tracks from Cymbeline way opposite Sheepen Rd. to West Bergholt.
Created by Jean Dollimore // 1 thread
Camden is consulting on some proposed improvements for walking and cycling through the junction of Abbey Road and Belsize Road
Created by Steven Moseley // 1 thread
Erection of 4 detached dwellings, access road, new woodland plantation and additional landscaping.
Created by Steven Moseley // 1 thread
Full planning permission for the development of the site to provide 144 new residential units (including affordable homes) with associatedon-site electricity and drainage infrastructure, open space, landscaping, access roads, parking and turning areas,
Created by cpax // 1 thread
. I regularly have to use this mini roundabout ( 3 times a week )and when approaching from Fulbourn I find that drivers are increasingly
ignoring the give-way to traffic coming from the right rule and as I brake they then drive up the cycle route .
Created by Jean Dollimore // 1 thread
Camden Council installed Pop-up cycle lanes on Chalk Farm Road and the lower end of Haverstock Hill last summer. They are now consulting on proposals to make these and associated changes permanent.
The proposals include:
Drop In Sessions
23 September 2021 (Thursday) from 16:00 to 19:00
30 September 2021 (Thursday) from 16:00 to 19:00
Location: Castlehaven Community Centre, 23 Castlehaven Rd, London NW1 8RU
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.