Cherry Hinton Hall
Cherry Hinton Hall is a house and park in Cherry Hinton (south Cambridge). The house and grounds are owned and managed by Cambridge City Council.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cherry Hinton Hall is a house and park in Cherry Hinton (south Cambridge). The house and grounds are owned and managed by Cambridge City Council.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03912/FUL | Residential development containing eight flats along with access, car parking, landscaping and infrastructure | Land Rear Of Gibson House Paradise Street Cambridge Cambridgeshire CB1 1DJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03838/FUL | Demolition of existing house and the erection of 3 No. dwellings | 38 High Street Chesterton Cambridge CB4 1NG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03877/FUL | Change of use from residential (C3) to large scale HMO for 12 persons (Sui Generis)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03966/FUL | Change of use from one dwelling to four flats, single storey rear extension and external alterations. | 1 Blackhall Road Cambridge CB4 3NJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
New thread for committee meetings
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03034/FUL | Erection of new 2-Bedroom house adjoining existing house (number 168 New Street). | 168 New Street Cambridge CB1 2QX
Tom McKeown // 1 thread
Demolition of existing buildings comprising Anglia House, Kendal House inc. flats above, Regency House and Marble Store to rear and 1 Cambridge Road inc. flats above; redevelopment of the site comprising 28 new-build Class C3 residential units, and associated parking, 2no. A1 use class commercial units at ground floor level, inc. 2no. commercial parking parking spaces; proposed new landscaping and public realm improvements to Cambridge Road.
Land Comprising, Kendal Court, Anglia House, Kendal House, Regency House And 1 Cambridge Raod Cambridge Road Impington Cambridge CB24 9YS
Cambridge
Application reference : 20/03742/FUL
The former level crossing near a petrol station and the Strikes bowling alley is a frequent source of conflict between cycling and motoring. As of 2020, this is a toucan crossing just west of the former railway's line, necessitating cyclists to slalom across it. There are short cycleways on the south side of the A148 Lynn Road and Gaywood Road providing access to the main entrance of King Edward School.
20/02728/REM | Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/3064/16/OL for 155 dwellings following demolition of two existing dwellings | Land South Of 279 St Neots Road Hardwick Cambridgeshire
Created by Paul Robison // 1 thread
Storey's Way open again to through traffic
Created by Steven Moseley // 2 threads
Development of 153 dwellings with associated parking, landscaping, open space, drainage and infrastructure and formation of new access and alterations to existing access onto Berechurch Hall Road.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases, in line with government guidance on the Covid-19 response. Walworth has been identified as a priority area.
We are installing experimental measures below to create a low-traffic neighbourhood and re-purpose the street space for the pedestrians, cyclists, the local community and businesses:
- Permeable closures (these are streets closed to motor vehicles but open to pedestrians and cyclists) on: Larcom Street, Browning Street, Merrow Street, Amelia Street, Alberta Street, Iliffe Street, Penton Place, Chapter Road, Cooks Road, Blackwood Street and Walworth Place.
- Introducing a bus gate on Carter Street and Manor Place.
- Footway widening on Braganza Street and Carter Street.
- Introducing a one-way system on Braganza Street Westbound only, and reversing the one-way system on Chapter Road to Northbound only.
We want to hear from you about the effects of these measures.
Created by James London Cyclist // 0 threads
Rye Lane will be closed to motor traffic from 6 July to allow more space for social distancing for shoppers, cyclists and pedestrians, and to ensure the works around Peckham Rye station can be carried out safely at the same time.
We want to hear from you about the effects of this closures.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases. The East Dulwich are has been identified as a priority.
On the 30 June we installed Phase 1 of the East Dulwich Streetspace measures, which is a permeable road closure (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove, south of Tell Grove.
The East Dulwich Streetspace Phase 2 measures will be installed on 3rd September. Details of these are below and aim to re-purpose the street space for pedestrians, cyclists and the local community:
• a permeable closure using planters (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove at the junction with Grove Vale
• a permeable closure using planters on Derwent Grove at the junction with Grove Vale
• a permeable closure using planters on Elsie Road at the junction with Grove Vale
• a permeable closure using planters on Tintagel Crescent at the junction with Grove Vale
• a school street closure during school drop-off and pick-up on Tintagel Crescent and Elsie Road (residents and emergency services will still be permitted entry)
We want to hear from you about the effects of these measures.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases. Dulwich has been identified as a priority.
We have now installed the experimental measures below to re-purpose the street space for pedestrians, cyclists, the local community and businesses:
- a closure of Calton Avenue south of Gilkes Crescent
- a closure on Court Lane at the Calton Avenue junction
- a closure of Calton Avenue at the Dulwich Village junction
We want to hear from you about the effects of these closures.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Greater Cambridge Partnership operates as a Joint Committee, under powers delegated by its three local authority partners.
It is led by a decision-making Executive Board which coordinates the overall strategic vision and drives forward the partnership’s programme of work. It is run in accordance with a clear governance structure, agreed by all partners.
The Executive Board is made up of one representative from each of the City Deal partners. While the law governing Joint Committees only allows the three local authority representatives voting rights, they consider the advice of the other representatives, to make sure decisions also represent the business and academic sectors.
The Board is advised and informed by a Joint Assembly. The Joint Assembly provides advice to the Executive Board, drawing on the broad expertise of its 15 members. The Assembly’s membership is made up of three elected councillors from each of the three councils in the Greater Cambridge area, and reflects the political composition of their council. The other City Deal partners each nominate three representatives, as stakeholders from a range of organisations within the fields of business and academia.
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Issues related to Milton being worked on by Milton Cycling Campaign, a new group formed by Camcycle members living in the village.
Created by Heather Coleman // 1 thread
There's a wet greasy line the length of the southbound carriageway on Hills Road between OLEM and Station Road, just outside the bike lane. When I cycled down there around 8.50am there was a very strong smell of diesel.
TAKE CARE. Diesel doesn't just evaporate as petrol would but leaves a greasy slippery residue that can persist for some days.
I've tried reporting to County, who don't want to know. I've bounced the report to City; who knows if they will do anything or say it's not their problem either.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Planning and Transport Scrutiny Committee consists of nine councillors who scrutinise the decisions of the Executive Councillor for Planning Policy and Open Spaces and the Executive Councillor for Transport and Community Safety.
20/03523/FUL | Erection of a 5 storey building and a 6 storey building for commercial/business purposes, erection of a transport hub, gymnasium, surface parking, landscaping and associated infrastructure including demolition of the existing building (St John's House) and associated structures. | Land In The North West Part Of The St Johns Innovation Park Cowley Road Milton Cambridge Cambridgeshire CB4 0ZT
Residential development of 75 dwellings along with access, car parking, landscaping and all associated infrastructure
Development Parcel L2 Topper Street Orchard Park Cambridge Cambridgeshire
Cambridge
Application reference : 20/03802/FUL
Tom McKeown // 1 thread
Redevelopment of land off Home Close and within the boundary of the Hain Daniels Group factory, in Histon, Cambridge, CB24 9NR. McCarthy & Stone’s initial plans propose to redevelop the site with Retirement Plus (Extra Care) accommodation with 65 apartments, 36 bungalows and seven cottages, all set within attractive landscaped gardens and with 45 on-site car parking bays.
A virtual consultation is available at https://mccarthyandstoneconsultation.co.uk/histon/proposals/ between Wednesday 16th September – Wednesday 23rd September 2020, looking for community feedback ahead of formal planning application.
Created by MJR // 0 threads
The Hardwick Road cycleway abruptly terminates at the corner of Beech Road, within sight of the next section at South Gates roundabout. Cyclists wishing to continue towards town without being obstructed by motorists need to either use six beg-button crossings of the A149 Hardwick Road to cross over and back, or use four beg-button crossings to head towards Hardings Way (where another three beg-buttons and currently a dismount greets them), or they can illegally slalom contraflow through a parking bay, footway and oncoming traffic - and unsurprisingly many do the latter.
All of the houses by the parking bay blocking the way have their own drives and it is not that much used. It could be repainted as a two-way cycleway, protected with posts and the slopes into the ends made shallower.
Created by MJR // 0 threads
A cycleway was built alongside Scania Way, but it is dangerous in many ways, including:
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by Andrea Bredel // 1 thread
this is one of many cycle lanes here in Ipswich that go on and off the road several times. This is very awkward for cyclists as they need to be very careful when getting back onto the road and most probably confuses drivers as well.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en