12/0968/FUL Installation of one bike stand
The installation of one stand in the boundary of M&S facing Market Hill Square.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by cobweb // 1 thread
Madgelene College (at Cripps Court) wish to remove a cycle shed in order to build a timber furniture store. The design and access statement, justifying this, says that few of the racks are used.
Created by cobweb // 1 thread
External works including pedestrian access ramp, alterations to bin storage, covered cycle parking, staff and visitor car parking etc.
Created by cobweb // 1 thread
8 cycle racks shown in the ground floor plan. A retail unit is likely to have some effect on traffic.
Created by cobweb // 0 threads
An application to demolish 191 and 193 Mill Road (opposite St Phillip's Church and replace with 6 studio units and a retail unit. It's a conservation area.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 0 threads
The proposal is to install two bollards on the corner of Hemingford Road in order to prevent cars from mounting the pavement. The pavement here (as with much of Mill Road) is not that wide. A build out was considered but it was felt that this would create pinch point of cyclists.
(Scheme 16, page 29)
Created by cobweb // 0 threads
Two speed cushions are proposed in order to reduce speed and make it safer for pedestrians to cross.
The proposal is to put in double yellow lines and no waiting restrictions at this entrance to the Tins.
Created by cobweb // 2 threads
EIP's from the East Area Committee. Two schemes proposed here, one at the Riverside end of the Tesco path, the other near Stanley Road. For the first, double yellow lines are suggested, for the second, double yellow lines and residents only parking.
Scheme 3, page 5.
Created by cobweb // 0 threads
Not sure if this is something or nothing but in the East Area Committee agenda (EIP Appendix B) there's discussion of Coleridge Community College (Parkside Federation is probably the right name now) installing bollards on the verge.
(Scheme 6, page 11)
Created by Gerhard Weiss // 1 thread
How St is Walthamstow's artery. It carries way too much motor traffic for its size. Many bus routes run through it. Recent improvement plans are looking ok, but are as usual a mixed bag.
This is a general, over-arching issue for discussion of helmet-related and cycle safety promotion strategic matters in Cambridge that periodically (and continually) arise.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by velocipedus@gmail.com // 0 threads
CN Letters 30 July 2012:
"If the Lady whose bottom was smacked by a passenger in a green Ford KA as she cycled along Cambridge Rd, Shelford, towards Trumpington at 11 am on July 25, would like to do anything about it, please get in touch with me via this newspaper. I was following and have the details of the car" (Name withheld in CN)
CCC to local police
"CCC would like to encourage the local police force to get in touch with the informant and take the necessary steps. Such behaviour is degrading, it is extremely dangerous, potentially life threatening, and must not be allowed to become a local custom. We look forward to read in the newspaper that the necessary steps have been taken and that such behaviour will be punished, including revoking of driver's license."
Suggestions?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by Chris Peck // 0 threads
Major development for around 140 dwellings. Godalming Cycle Campaign has written to the developer requesting matters to be taken into consideration to ensure that the development improves access around the site for cyclists.
Some changes to the junctions nearby have been proposed.
http://www.waverley.gov.uk/info/200074/planning/1282/godalming_key_site
Created by Heather Coleman // 6 threads
The Addenbrooke's site is a poor cycling environment in so many ways. A full set of proposals for change are needed.
Created by David Earl // 2 threads
Expansion of the site by 510 vehicles
Martin Lucas-Smith // 2 threads
Large gyratory, which needs removal and replacement with cycle-friendly measures.
Created by Gregory Williams // 1 thread
Cycle parking is required at Bekesbourne railway station. The issue photo is evidence of this.
From the EIP programme for the South Area Committee, a proposal to put in a signalised crossing. (The report mentions Fulbrooke Road (which is in Newnham and not part of this patch) but I think it means here instead.) It's likely to get South Area Transport Corridor funding. No more details given.
Created by Rohan Wilson // 2 threads
Parcels either side of Spine Road's junction with Long Road, and one along eastern edge of housing, west side of proposed secondary school site. http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=M5YZKKDX07900 Official deadline 19 July
12/0794/REM | Reserved matters for 231 dwellings (outline approval 07/0620/OUT) Parcels 1B, 2 And 5 Clay Farm, near Long Road
Created by Rohan Wilson // 0 threads
Cycle parking in lean-to's in rear gardens, access via narrow rear alleys, while cars are in front, across driveway. Site far behind Esso, Aldi and modern factory building. Deadline 25 July
Created by Rohan Wilson // 0 threads
"... office development adjoining Unex House (Savills), providing 5 storeys of B1(a) office space (4688m2) and two storeys of associated parking spaces (3102m2). Providing a total of 7790m2 gross internal floorspace of development. | Car Park Unex House 132 - 134 Hills Road..."
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by User 2125 (deleted) // 1 thread
The shared access path on Colne road, on its north side, creates conflict between cycles and vehicles. The provision seems worse than using the road. The presence of commercial premises on both sides of this road make the use of a shared access path highly problematic.
More photos can be found on the campaign blog.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by FrenchyF // 0 threads
The bike lane here starts too close to the junction - drivers hug the kerb before the cycle lane starts, and this makes the lane useless.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by jpennycook // 1 thread
Brighton Hill Community Planning Group is consulting:-
Now consulting!
Brighton Hill Community Planning Group
If you live work or volunteer in Brighton Hill please let us know your views.
Complete the survey (https://www.snapsurveys.com/wh/s.asp?k=149700756001)
The consultation will close on 14 August 2017.
Created by Rob Earl // 0 threads
Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.
Created by Rob Earl // 0 threads
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Stephan Matthiesen // 1 thread
The path between Hyvot Loan and Guardwell Glen has two narrow chicanes at both ends, which are quite overgrown too.
This path is important as it allows people to leave the quiet route northwards towards Ellens Glen, so you can avoid parts of the busy Gilmerton Rd.
I contacted the Active Travel team about it and they are going to look at it. There is some uncertainty if this is owned by the Morrison supermarket or the council. The chicanes were put in after local complaints about motorbike, so the Active Travel team has to investigate if this is still a concern.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by FrenchyF // 1 thread
The road markings at the junction between Old Dalkeith Road and Little France Cottages should be repainted. Adding a bike lane would also be an improvement.
Created by FrenchyF // 1 thread
Just south of Little France Road, the southbound bike lane on Old Dalkeith Road is appalling. It's alongside a parking bay, but the parking bay isn't wide enough for cars to fit into it without them sticking into the bike lane. Even if it was, "dooring" would still be a significant hazard.
Even away from the parking bay, the bike lane is too narrow.
The bike lane really needs to be wider and further away from parked cars. If this isn't possible, I think it would be better to have no cycle lane at all.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Rob Earl // 1 thread
Access to QR10 from Fillyside Road requires either:
- Cycle across busy/fast road and up full height kerb
- Turn right onto busy/fast road for ~100m, turn left up dropped (but not flush) kerb
- Cycle on pavement and cross at traffic island
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Kokomo // 0 threads
usually have to wait a very long time here - reduce the wait time after pushing the button! This crossing needs to be more responsive like the one round the corner on Clerk St.
This small change will make a big difference to this route to the Innocent Path
Created by jpennycook // 1 thread
Outline planning application for the erection of up to 95 dwellings with public open space, landscaping and sustainable drainage system (SuDS). Demolition of garages to form a vehicular access point from Bow Drive and replacement garaging. All matters reserved except for means of access
Land At Goddards Farm Goddards Lane Sherfield-on-Loddon Hampshire
"Whilst there are no cycle routes currently in the vicinity of the site, the topography of the
surrounding roads make them generally conducive to encourage cycling. These provide
connections for cyclist from the development site to the wider area."
Basingstoke
Application reference : 17/02190/OUT
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by acsimpson // 0 threads
There is a gate across the full width of the national cycle network just west of the Railway line past Dalmeny. This forces all path users to use the uneven verge which can get very muddy at certain times of year.