23/03273/FUL and 23/03273/COND7 east of NMR P&R
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by KW // 1 thread
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
Created by Gregory Williams // 2 threads
There isn't a dropped kerb at the northern end of the Legacy Park cycle path where it meets Chaucer Road. Therefore cyclists can't easily transition between the cycle path and the road here.
Created by Gregory Williams // 1 thread
The signs at the junction between Mill Lane and St. Radigund's Street in Canterbury have gone missing.
The new shared-use path here is lovely except they've installed corduroy paving, with the very narrow bumps, on the newest stretch, to indicate the cycling and pedestrian halves, instead of the usual fat textured paving. Last week in the bad weather it caught my wheel and I skidded on it, only just avoided coming off completely. I couldn't get a photo because it was after dark, but you know the paving I mean. It's not suitable for cycle paths under any circumstances and I don't know why they've used it here. The section they installed previously, along Gregory Park up to the back entrance of the P&R, has the correct paving.
sound+fury // 1 thread
No cycle parking shown in the plans
Created by Martin Wheatley // 1 thread
How exactly more secure cycle parking will work.
Created by Gregory Williams // 1 thread
The cover has gone from the cycle parking opposite B&M Home Store, leaving cycles more exposed to the weather.
Created by Gregory Williams // 1 thread
Each winter the Crab & Winkle Way gets a puddle across the full width of the route a little south of Tyler Hill Road. This can freeze over as ice and mask potholes in the surface beneath.
Created by Josh Grantham // 1 thread
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
Created by KW // 1 thread
23/04936/FUL | Full planning application for the construction of 91 new homes with associated infrastructure, internal roads, open space as part of phase 3 within the Marleigh development as a modification to outline permission S/2682/13/OL to increase the overall unit numbers across the site to 1,391 homes. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by KW // 1 thread
23/04930/REM | Reserved matters application detailing, appearance, landscaping, layout and scale for the construction of 332 new homes and commercial space with associated infrastructure, internal roads, open space as part of phase 3 pursuant to condition 5 (reserved matter) of outline permission S/2682/13/OL dated 30 November 2016. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by Gregory Williams // 1 thread
A tree has fallen blocking NCR1 at Duke's Meadow. In the meantime it is still possible to cut across the grass to continue the route.
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Edward Bainton // 1 thread
Crossing from Bright Street to Geneva Street, the cycle lights do not sense the bike. You can sit through 10 phases and you never get a green light.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Campbell Mccaig // 1 thread
A real lack of strimming too making some paths nearly unuseable.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
Created by Gregory Williams // 1 thread
The River Dour Greenway sign pointing into Lorne Road from the shared path beside Buckland Avenue is missing. Previous Google StreetView imagery shows the sign which has gone missing:
Created by Gregory Williams // 1 thread
Bollards on the path used by the River Dour Greenway between Alfred Road and Brookfield Place limit access for people with trailers or on tandems.
Created by Martin Wheatley // 1 thread
Absolutely disgraceful deposit of mud by tractor drivers hauling harvested beets on Fen Lane (the back way to the north of Swaffham Bulbeck which many of us use to bypass the unpleasant B1102 through the village). In my opinion it is not currently safely passable on a bike. I was on foot, in wellingtons, and found it hard to stay upright. The number of tractors and the aggressive speed at which they are being driven is an additional hazard. Until this is cleared up, the options are the main road through the village, or (somewhat longer but much less busy), divert via High Street, Quarry Lane and Heath Road back on to the B1102 and the Greenway to Swaffham Prior north of the village.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Brown // 1 thread
Conflict between pedestrians and cyclists on stretch of CGB shared-use path alongside allotments and CGB in Trumpington
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Created by George Coulouris // 7 threads
This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:
1. Safe routes to schools
2. Areas without through motor traffic (AWTTs)
3. Protected space on main roads/major junctions
4. Safe cycle routes via parks and canals (Greenways)
5. 20mph speed limits
6. Liveable town centres
so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by TMiles // 0 threads
Cyclists benefit from an almost continuous cycle or bus lane along the A660 from the city centre. This route is much used by students cycling between central university campuses and accommodation in north-west Leeds.
After the central traffic lights in Headingley, the cycle lane ends and the road narrows. Although the road later widens out to two lanes, there is a stretch (marked on the map) where cyclists have insufficient space on what is a busy radial road.
There are two possible solutions here. The first would be to widen the north-west bound lane to allow a standard width cycle lane to be marked out. The second option would be to add a phase into the traffic light sequence that grants cyclists a ~10 second head start to clear this narrow stretch. This solution could involve detectors in the cycle lane upstream of the lights to avoid its unnecessary activation. It would also allow cyclists to position themselves better for the next junction, where traffic is split into two lanes.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.