Newmarket Road/Elizabeth Way roundabout
This is a large roundabout, with a unsatisfactory underpass, that is in need of a total reconfiguration, ideally involving its removal.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
sound+fury // 1 thread
This is a large roundabout, with a unsatisfactory underpass, that is in need of a total reconfiguration, ideally involving its removal.
sound+fury // 0 threads
The pavement here is narrow. Is there a way of improving the environment for walking and cycling at the same time?
sound+fury // 0 threads
Traffic signals hold up not just vehicles but bike riders too. This should change with consideration given to walkers as well.
Created by Jean Dollimore // 1 thread
Due to the expansion of Euston Station to accommodate HS2. residential parking has been reduced around Euston Station, which has triggered a review of provision in the CA-G CPZ.
sound+fury // 0 threads
Several bikes fly parked in this area, showing that bike racks would be welcome. (Reported originally on Twitter by Alex Raha (@Rahario)
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by Roxanne (CEO) // 1 thread
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/0202/17/OL for the development of 110 dwellings with areas of landscaping and public open space and associated infrastructure works The outline was screened and confirmed not too be EIA development
Land east of Teversham Road, Fulbourn, Cambs
South Cambridgeshire
Application reference : S/3290/19/RM
Created by Roxanne (CEO) // 1 thread
Development of retirement care village in class C2 comprising housing with care, communal health , wellbeing and leisure facilities, public space , landscaping, car parking, access and associated development
Land Rear Of 163 To 187 High Street Bottisham
East Cambridgeshire
Application reference : 20/00296/OUM
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by David Earl // 1 thread
The cycleway has a sever problem with tree-root damage. The largest fault is a sharp triangular profile about 10cm high. This has been reported to CambsCC six times according to their fault reporting, starting two years ago, including one person who came off their bike beacause of it. I reported it in September 2018. Nothing whatsoever has been done about it.
I wrote to my county councillor (John Williams, in whose division this also lies) about the failure to act in January. He did not reply. I have written again today.
Yesterday, I was thrown off my bike by my pedal catching the largest upstand. Fortunately the only damage was a sore knee for a few hours.
I have now made a formal complaint of negligence to the Counmty Council. They have had two years and a report of injury, but have failed to act.
Created by David Earl // 1 thread
The chain-link fencing on the south side of the path on the west ramp off the Tins rail bridge is badly bowed out into the path. This is at face level and could take someone's eye out: it is dangerous.
There was already a report on county HIghways for this, which was dismissed as "landowner responsibility", which may be network rail or may be the chalk pits land. There was no indication in the closed issue whether they had actually informed the landowner, so I reported it again today.
Local Plan for LBRUT is being revised to line up better with Mayor and local policy
Martin Lucas-Smith // 1 thread
This is a hostile roundabout. It has been fiddled around with over the years, to add advisory cycle lanes, lights, pedestrian crossings, etc.
The area needs a fundamental redesign, to replace the roundabout probably with a protected intersection design.
It is outrageous that a health site such as Addenbrooke's has such an unsafe and anti-cycling junction as its main entrance.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Martin Lucas-Smith // 0 threads
Now that the residents' parking scheme is in place, it is clear that there are many more spaces provided than are actually in use.
The amount of space should be slimmed down ASAP.
In particular, the area round the exit from the cut-through from Clifton Road desperately needs to have the parking removed year, to make the visibility much better. A couple of vehicles park there, yet they could easily park 20m away in one of the now empty bays.
Station Road has a bit of cycle lane provision, but it is spotty.
There should be cycle lanes on both sides of the road, the full length.
Taxis should have to queue in the station area car park itself, not 250m away on Station Road.
The streetscape along Riverside was upgraded several years ago at the town end. But it then stops.
It should be completed, all the way to Stourbridge Common.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
Martin Lucas-Smith // 0 threads
Maid's Causeway and the town side of Newmarket Road (until the roundabout) is a mish-mash of a few bits of cycle lane. This is a wide road.
This should be changed to proper cycle tracks. This can be done without moving pavements.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 0 threads
Gonville Place at the Mill Road end needs queue-busting cycle lanes, as per East Road.
As the image shows, there is plenty of space here.
The Hills Road end goes to three lanes so that would be more difficult. The Mill Road end is much easier and can be regarded as a simple 'quick win'.
Martin Lucas-Smith // 0 threads
Like many areas of Petersfield, Ainsworth Street has no cycle parking but there are bikes left along the pavements.
Cycle parking should be provided.
Every night, and during the day, there are always at least some spots of car parking unused. Therefore there is scope to remove a few spaces and install residential cycle parking, as per Thoday Street.
Martin Lucas-Smith // 0 threads
Kingston Street has a major problem with pavement parking.
Bizarrely the yellow line restriction on the east side (nearest the railway) allows parking on that side of the road during certain times, but that is not possible to do without either blocking the road or parking on the pavement.
Current restrictions are Monday-Saturday, 8.30am-5.30pm. This should be double yellow lines (24 hours). That would still permit deliveries.
Created by Jean Dollimore // 1 thread
Camden Council wants to improve the Kentish Town area, including improving air quality and making walking and cycling easier and safer. The area included is shown on the attached map on which we have added blue lines to show the links in the Camden cycle network in this area. See map image with the Issue.
Camden has already been engaging with stakeholders at meetings and with local people via the Commonplace engagement map (see link).
Created by Steven Moseley // 1 thread
This developer [1] has put up this barrier in a shared use path important to local cyclists (c.f. the Campaign's original objections), apparently following complaints that the path was being used as a “cut through” by motor cyclists.
Clearly, this constitutes a real problem for cyclists and wheelchair users.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.