21/00772/OUT | A hybrid planning application next to ARM
Substantial proposed development next to the Technology Park on Fulbourn Road (ARM).
181 documents.
Lots of bike parking, mostly in double stackers.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by KW // 1 thread
Substantial proposed development next to the Technology Park on Fulbourn Road (ARM).
181 documents.
Lots of bike parking, mostly in double stackers.
Created by Gabriel // 1 thread
The plans for the improved shared pavement between Waterbeach and Milton have been added to the planning portal. Planning application: S/0559/17/COND29
Also please note the A10 SLO for a reduction of the speed limit on these sections from 50mph to 40mph.
https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-slo--reference-number-pr--------a---and-some-surrounding-roads-in-the-vicinity-of-milton--landbeach-and-waterbeach-18-0
From looking at the plans my main concerns
Narrow sections - less than 3m wide, which is not LTN 1/20 compliant and very unambitious seeing as 11,000 homes are being built in Waterbeach.
The separation from the carriageway is also very unambitious at 0,5m and not a properly segregated verge. 0,5m is the absolute minimum suggested in LTN 1/20. 1m is the minimum recommended.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Cambridgeshire County Council proposes to make the above Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Prohibit all motorised vehicles on Oakington Road, Longstanton from a point 460 metres south east of its junction with Wilson’s Road to Longstanton Road, Oakington and Westwick at a point 370 metres north west of its junction with Lowbury Crescent.
Access for pedestrians, cyclists & equestrians will be maintained with provision for access for adjacent agricultural landowners and emergency service vehicles.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Cambridgeshire County Council proposes to make the above Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Revoke 5.5 metres of the residents parking bay outside of 55 De Freville Avenue and replace with double yellow lines to facilitate a dropped kerb access.
Created by Steven Moseley // 1 thread
Part demolition of outbuilding to south west elevation and conversion of existing building to three two bedroom and three one bedroom apartments with associated parking
Created by Steven Moseley // 1 thread
Demolition of double garage and erection of five detached dwellings, garages with landscaping, access and front boundary wall. (re- submission of approval 181630 and 190582)
Created by Roxanne (CEO) // 1 thread
How can cycle parking at Queen Anne Terrace car park be improved and made more secure?
Outline Planning Application for up to 39 market homes and 16 affordable homes with vehicular access from Greate House Farm Road andThe Folley with all other matters reserved.
211392 / 211393
Large development, so several proposals for local routes in planning objection.
Created by Thomas Ashton // 1 thread
A pair of one way swing gates have been installed on Coldhams common. This blocks the path for people like me with a cargo bike because it is not possible to hold the gates open and hold the bike at the same time. I spoke with someone on the site and they said it was needed to stop cows escaping while they replaced the cattle grid. Surely there is a better way that don’t stop access for cargo bikes?
Created by KW // 1 thread
Hybrid planning application comprising: a) outline planning application for commercial development comprising B8 floorspace, including ancillary E(g)i floorspace, and flexible B8/E(g) floorspace, car and cycle parking, landscaping and associated infrastructure with all matters reserved except for access on Parcel A; b) full planning application for ecological enhancements on Parcel B; and c) full planning application for recreation and ecological enhancements, including landscaping, public open space and pedestrian and cycle access on Parcel C. | Land South Of Coldhams Lane Cambridge Cambridgeshire
Has implications for The Tins, Fulbourn Greenway, Cherry Hinton, Coldham's Lane, Brookfields, and Burnside.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing buildings/structures and erection of college accommodation, new access and landscaping
Wilberforce Road Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 2 No. one Bedroom Bungalows
Land To The Rear Of 32 And 32A Gray Road Cambridge CB1 3TA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of outbuilding into one new dwelling, and enlargement of cycle and bin store
1 Grosvenor Court Cambridge CB3 0HU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a 2bed dwelling on land rear of 57 Mowbray Road
57 Mowbray Road Cambridge CB1 7SR
Created by Rosamund Humphrey (Admin Officer) // 1 thread
External Improvements to St Peter's Terrace including improved bike racks & storage, removal of three trees, enlarge gravel area, relay tarmac, new bin stores, new fences and reduce rear garden.
No change of use.
Land At St Peters Terrace Cambridge CB2 1QQ
Created by Marcus Howarth // 1 thread
From https://haveyoursay.tfl.gov.uk/lumley-road
This is in response to a high number of collisions having been recorded at this location involving vehicles turning right from Lumley Road, and northbound traffic on St Dunstan's Hill. Local residents and stakeholders have also raised concerns about this junction. We are now holding a public consultation on our proposals, running from 7 June to 18 July 2021, and you can find details of how to take part below.
We propose making the exit from Lumley Road onto St Dunstan's Hill left turn only. To enforce this, we propose installing a pedestrian island in the carriageway at the end of Lumley Road, which would help prevent vehicles from turning right. This island would include dropped kerbs and tactile paving. As well as prohibiting the right turn, this would also provide a safer and easier crossing point for pedestrians and cyclists crossing Lumley Road.
From impact assessment
Created by Steven Moseley // 1 thread
Resubmission of application number 210196 following redesign, for a single linked 2 bedroom house.
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 172118 - APP/A1530/W/18/3200940 - Demolition of bungalow and barn/shed and the erection of 3no. dwellings.
Created by Steph Potter // 0 threads
This is a junction of a suburban road and a gravelled shared pedestrian/cycle route through Fish Pond Woods. Unfortunately, the dropped kerb to turn from the road onto the path does not line up with the path and there are no double yellow lines to prevent people from parking immediately blocking the path. Once on the path, the path is too narrow and poorly gravelled that it is difficult to try to stop or swerve if meeting a pedestrian or oncoming cyclist.
Created by John Seton // 1 thread
Aggregate Industries have contacted local cycling walking and equestrian groups about Rights of Way improvements they plan to implement on their site near Little Paxton, between the A1 and the River Ouse north of Little Paxton.
They say "As part of our planning permission at Little Paxton and specifically the restoration scheme we are starting to implement our Rights of Way improvements which will see a new network of Public Rights of Way and Bridleways linking Diddington Village with the River Ouse and Little Paxton Nature Reserve".
As the work is on a private site, it my not get picked up through regular County Council planning distribution lists, so this is creating a new issue to create a placeholder for any discussion about the plans.
Created by Steven Moseley // 1 thread
Outline Application, all matters reserved: Existing Dwelling House retained and refurbished with smaller Garden. 3No. new detached 3- bedroom Dwelling Houses.
Created by Jean Dollimore // 1 thread
Goods Way has been one way westbound for motor vehicles for most of its length during recent construction works. The section between the Kings Cross Station service road and York Way is two-way to allow service and construction vehicles to access York Way directly. Two-way cycling has been maintained right along Goodsway.
Camden proposes to make the current arrangements permanent
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Brown // 1 thread
Conflict between pedestrians and cyclists on stretch of CGB shared-use path alongside allotments and CGB in Trumpington
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Created by George Coulouris // 7 threads
This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:
1. Safe routes to schools
2. Areas without through motor traffic (AWTTs)
3. Protected space on main roads/major junctions
4. Safe cycle routes via parks and canals (Greenways)
5. 20mph speed limits
6. Liveable town centres
so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by TMiles // 0 threads
Cyclists benefit from an almost continuous cycle or bus lane along the A660 from the city centre. This route is much used by students cycling between central university campuses and accommodation in north-west Leeds.
After the central traffic lights in Headingley, the cycle lane ends and the road narrows. Although the road later widens out to two lanes, there is a stretch (marked on the map) where cyclists have insufficient space on what is a busy radial road.
There are two possible solutions here. The first would be to widen the north-west bound lane to allow a standard width cycle lane to be marked out. The second option would be to add a phase into the traffic light sequence that grants cyclists a ~10 second head start to clear this narrow stretch. This solution could involve detectors in the cycle lane upstream of the lights to avoid its unnecessary activation. It would also allow cyclists to position themselves better for the next junction, where traffic is split into two lanes.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.