Unhappy pavement 'cyclepath'
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Debra Storr // 1 thread
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
Created by Debra Storr // 1 thread
Shared cyclepath fizzles out with a short length of a parallel roadway providing the infill. Uncomfortable.
Created by Debra Storr // 1 thread
This is a 40mph distributor road which is currently fairly quiet. But many houses are planned in this location. It would have been helpful if the pavement has been built a bit wider and designated as a shared path/cycleway. Even better would be an actual cycleway but we can press for that with the development.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Debra Storr // 1 thread
With a existing cyclepath on south-west of roundabout and a proposed cyclepath on the north east side, the issue of a crossing at the Murcar roundabout needs to be resolved.
Created by Debra Storr // 1 thread
While part of new Balmedie-Blackdog route is tarmac, the southern portion has been left as gravel/ground and will undoubtedly get worse in winter. Funds are being sought to improve.
Created by Debra Storr // 1 thread
Consultation open until 18th August 2019 on cycleway as shown.
Unresolved issue of connections into Blackdog from bus stop on dual carriageway and connection at Murcar onto existing shared cyclepath on west side of dual carriageway.
Created by Hounslow Cycling Campaign // 1 thread
The London Borough of Hounslow is consulting on the Local Plan Reviews for the Great West Corridor and West of Borough opportunity areas. The Local Plans set out planning guidelines for major developments in the respective areas. Each Plan includes a section on "Connecting People and Places" that covers transport aspects of developments.
Steve Curran, the Leader of Hounslow Council, refers to the negative impacts of major roads crossing the Great West Corridor area in his foreword. "Attractive alternatives to the private car" described in pp74-83 of the consultation document include improved walking and cycling infrastructure. Proposals for two new rail links will be rather more expensive.
Councillor Curran expresses concern about the environmental impact of a Third Runway at Heathrow Airport on the West of Borough area but also points out the regeneration opportunities. "Attractive alternatives to the private car" described in pp78-85 of the consultation document include improved cycling and walking infrastructure.
Reserved matters application pursuant to outline approval 06/0796/OUT (amended by Section 73 approval 17/2258/S73) for: an R and D Enabling Building of 13,197 sqm; an Amenities Hub of 3,261 sqm; associated car, motorbike and cycle parking including a Multi Storey Car Park; a temporary Multi Use Games Area; hard and soft landscaping; and internal roads, supporting facilities and ancillary infrastructure.
Astrazeneca Uk Ltd Cambridge Biomedical Campus Francis Crick Avenue Cambridge Cambridgeshire CB2 0AA
Cambridge
Application reference : 19/1070/REM
19/1010/FUL | Conversion and extensions to the existing buildings including demolition of the existing block to the rear of 1 Godesdone Road to deliver a mixed use development comprising a ground floor retail space and 12 1xbed residential units (net increase 9) to the rear and above along with cycle parking and associated infrastructure. | 185-189 Newmarket Road And 1 Godesdone Road Cambridge Cambridgeshire CB5 8HA
Martin Lucas-Smith // 1 thread
Creation of a cycle storage area equiped with racks to facilitate appprox 200 cycles following removal of a large white birch tree to undertake repairs to building caused by tree roots.
Robinson College, Porters Lodge Grange Road Cambridge CB3 9AN
Cambridge
Application reference : 19/0926/FUL
Demolition of existing flats 66-80b Colville Road and erection of 69 affordable dwellings, including 6 houses and 63 apartments, including resident and public car parking, landscaping and associated works
66-80B Colville Road Cambridge Cambridgeshire CB1 9EJ
Cambridge
Application reference : 19/1034/FUL
The A14 works have closed the east side pavement/cyclepath for some amount of time.
This either forces people to cross the rode via 4 toucan crossings (and cycle or walk up a very narrow stretch) which is technically not a cycle path I believe. Alternatively people have to cycle on road across a busy 2 lane 60mph limit roundabout.
sound+fury // 1 thread
Created by Peter Loader // 1 thread
Create an unsegregated cyclist/walker area in the paved area that was produced when the northern arm of Northway, Rickmansworth became traffic-free. Call it Northway Square. This would become the centre of Rickmansworth's cycling/walking network, with Bikeability level 2 routes leading:
* To National Cycle Network Route 61 (The Colne Valley Trail at the Aquadrome), to Mill End, and to Maple Cross.
* To Rickmansworth Station, to Chorleywood, and to The Cedars Estate,
* To Croxley Green, via Three Rivers District Council's car park.
Upgrade the existing public footpath to a bridleway so the route remains on the definitive map.
Martin Lucas-Smith // 1 thread
The section of East Road at the police station end, with the cycle lane, suffers from absolutely rife pavement parking and parking in the cycle lane.
Created by Alex Jenkins // 2 threads
The draft Tower Hamlets Transport Strategy aims to improve the way we move around our borough.
Tower Hamlets is one of the country's fastest growing boroughs. Our roads are the busiest in the UK.
77 per cent of our residents are exposed to unsafe pollution levels, children in the borough have on average up to ten per cent less lung capacity and 43 per cent of Year 6 school children are overweight or obese.
According to Public Health England, pollution is linked to increasing rates of asthma, heart disease, dementia, lung cancer and low birth weight.
The new strategy aims to address these concerns and look at what the council and residents can do to make travel cleaner, safer and accessible for everyone.
Promoting walking and cycling is at the heart of plans to help meet the Mayor of London’s target that 90 per cent of all trips in the borough should be made on foot, by cycle or by using public transport by 2041.
Over the next two months, the council will be asking all those who live and work in the borough to get involved, share their ideas and help shape the future of travel in Tower Hamlets.
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S/2413/17/OL as varied by Section 73 application S/4116/18/VC for the erection of up to 200 residential dwellings (including 40% affordable housing), demolition of no. 117 Rampton Road, introduction of structural planting and landscaping, informal public open space and children's play area, surface water flood mitigation and attenuation, vehicular access points from Rampton Road and associated ancillary works.
Land Off, Rampton Road, Cottenham, Cambridgeshire
South Cambridgeshire
Application reference : S/2549/19/RM
Tom McKeown // 1 thread
The mouth of Cotteham Road is wide and fast. How do we get this improved? Especially in the context of the new school.
Created by Martin Gorst // 1 thread
Ealing Council is consulting on a new scheme for the area outside Ealing Broadway station.
Reduction in Cycle Parking
As part of the scheme, Ealing Council plans to remove 59 cycle stands on and near Haven Green and replace them with 29 stands along the Broadway. This will remove parking for 60 bicycles. As Haven Green is common land, the cycle stands on the grass are only temporary. At some point they will need to be removed. Ealing Cycling Campaign has repeatedly urged the council to earmark a site near Ealing Broadway station for permanent cycle parking. A good location would be the car park along the south side of Haven Green. Unfortunately the council has still not been successful in acquiring the required land, and has not yet decided to instigate compulsory acquisition procedures, or otherwise escalate the process.
At times of peak demand, the cycle stands near Ealing Broadway fill up, and people lock bicycles to trees and other objects. With the arrival of the Elizabeth Line and the new cycleway to Greenford, the demand for cycle parking at the station will grow.
Where’s the Cycle Lane?
The new plans don’t include the contraflow cycle lane (below) the council promised six years ago.
For over 20 years Ealing Cycling Campaign has lobbied the council to build a contraflow cycle path to run along the east side of Haven Green (but not on the common) to link the Mall with the roundabout at Madeley Road. This will provide a direct route to and from Ealing Broadway station so people don’t have to cycle around the Arcadia Centre and Haven Green. In 2013, the council included the cycle path in its mini Holland plans. However, it has disappeared from the latest proposals. This goes against the council’s transport policy for its cycle network, which states: “Where one-way streets are implemented, the default position will be that contra-flow cycle lanes will be provided.”
sound+fury // 1 thread
The changes themselves are not controversial. (College doing some refurbishment of property for student use.) However, for a 7 bed house, they propose only 6 bike rack spaces.
Anon // 1 thread
We would like your views on suggested changes to the controlled parking zone on your road
In 2018 we asked you if would like us to make any changes to the Bermondsey CPZ 'G'
As part of this survey we sent out a total of 9,517 surveys and received a 4% response rate. 65% of those who responded wanted the current parking restrictions to be amended with 61% stating that they struggle to park on a Saturday. We would now like to know in detail the changes that you would like us to make.
We know, from the original survey and changes in the area such as residential developments and an increase in bars and restaurants, that parking stress has increased and we would like to know what changes you would make.
If we receive a majority in favour of amending the operating times and hours of Zone ‘G’ we will put forward a recommended amendment to the Cabinet Member for Environment, Transport and the Climate Emergency to make a final decision.
In addition to potential changes to the operating hours of the controlled parking zone we would also like to know if residents and businesses in the Shad Thames area would like their own separate zone. This would mean that permit holders in this area would have their own permits and would only be able to park in that area.
This decision would then be subject to statutory consultation.
What are the pros and cons of extending the operating hours of my parking zone?
Pros
Cons
If we were able to reduce the amount of vehicles parked in the area, we could consider introducing a variety of street improvements as detailed below:
Created by George Coulouris // 1 thread
Royal College Street works 8th July -16th August
The planters will be replaced by granite kerbs – affecting RCS south of Baynes Street.
The works will start on 8th July and are expected to be completed by 16th August 2019. During the works, northbound cyclists will be diverted to use the with-flow traffic lane whilst southbound cyclists will be diverted to use St Pancras Way.
We will keep you informed here as to which segment of the cycle track is currently unavailable.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Group looking at issues for active travel in the Chesterton area.
sound+fury // 1 thread
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Andrew Woodward // 1 thread
It would be useful to provide a route from east side of Kew Gardens station; via Burlington Avenue; along Mortlake Road and up the service road alongside the district line to the Thames Path. The service road is already closed to traffic; but cycling is obstructed by a large ugly concrete barrier (see photo). There is room on the north side of Mortlake Road for a short section of dedicated cycling space to link to the junction with Burlington Ave - see http://goo.gl/maps/DG7gh. The crossing could be problematic.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.