21/05423/FUL: new dwelling, land rear of 1 Priory Street
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
Created by Finlay KM // 1 thread
The brook conduit has partially collapsed under the road and the shared-use path. It is currently being repaired (after nearly a year) but the contractors have made use of a very interesting "Cyclists dismount and get an escort" sign. A yellow ramp also makes passing on any non-standard cycle a real challenge. Both of these items are really bad practice and actively discriminate against anyone on a non-standard cycle.
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use of agricultural building to dwellinghouse.
Created by Steven Moseley // 1 thread
Change of Use from Offices to HMO Residential Use
Created by Steven Moseley // 1 thread
Demolition of existing Print Workshop and development of site to provide a replacement print workshop and 5No. residential units with associated vehicle parking and landscaping.
Created by Steven Moseley // 1 thread
Change of use from A1 to C3 to create 4 new 1 bedroom apartments. External repair and decoration. Internal Alternations. Additional Windows and relocation of door to rear elevation. ASHP units to roof top.
Created by Steven Moseley // 1 thread
New Mixed Use Development comprising a convenience store (use Class A1), three flexible use units (Class A1-A5 or Class D1), associated yard and servicing area, parking spaces and landscaping.
Created by catch // 1 thread
New development of 100 homes off the A134 in Horkesley.
https://www.colchester.gov.uk/planning-app-details/?id=442d3ed1-7f61-ec11-8f8f-0022489d9171#ValidationSummaryEntityFormView
Created by Stuart Johnson // 1 thread
Demolition of six retail units part of the Priory Walk Shopping precinct and replacing them with a mixed development of 21 apartments and one retail unit situated on the north side of the junction of Long Wyre Street and Priory Walk.
https://www.colchester.gov.uk/planning-app-details/?id=e10f62af-2c5f-ec11-8f8f-0022489cf2d7
Demolition of a 1960's, 2 storey commercial building on the corner of 14-16 Long Wyre Street and 1-8 Priory Walk and, replacement with 4 storey new building, providing 18 new homes and one commercial unit at ground floor.
https://www.colchester.gov.uk/planning-app-details/?id=1a6462d2-bb5d-ec11-8f8f-0022489cfbff
Conversion and remodelling, including partial demolition, of an existing, Class E, building to form a mixed use development of 37 new,Class C3, self-contained homes and a new Gym Space at Ground Floor.
Created by Michael Robinson // 1 thread
Creating discussion on proposals for Cycleway 9 extension between Brentford and Hounslow town centres.
Hounslow to Brentford walking and cycling changes
We’re proposing to make a series of changes to help people to walk and cycle on Brentford High Street and London Road between Hounslow and Brentford town centres.
We’d like to know your thoughts on our proposals and we are holding a six-week consultation. You can reply by completing our survey, which should take no more than 5-10 minutes to complete.
If you prefer, you can email your comments to haveyoursay@tfl.gov.uk or write to us at FREEPOST TFL HAVE YOUR SAY (Walking and cycling changes between Hounslow and Brentford), no stamp needed.
The closing date for comments is 16 February 2022.
Summary of changes
We’ve described the changes in more detail but in summary we are proposing to make the following changes:
Created by Steven Moseley // 1 thread
Change of use from Sui-Generis (current police station) to residentialcare home (use class C2) Also addition of single front entrance porch/extension
Supplement to housing development application entitled 'Provision of a shared cycleway/footway west onto Ness Road, landscape, drainage, and associated infrastructure of previously approved 15/01175/OUM'
East Cambridgeshire Planning application reference : 21/01771/FUL
Burwell is not in Ely Cycling Campaign's remit but will be important to some Camcycle members.
The proposed infrastructure looks very good in these plans. The Council wouldn't dare require barriers on it because it is intended as a route for emergency vehicles. The rising bollards don't look to be too much of a problem, as long as they can be seen in poor visibility conditions -the plans includes lighting for the route but it might be good for the bollards to include reflective and fluorescent markings.
There already is a dropped kerb at the northwest end of the route (junction with Ness Road).
The plans include the 'Cyclists Dismount' sign for those emerging onto Ness Road.
Created by Steven Moseley // 1 thread
Replacement of bridge and associated highways works involving realignment, junction improvements and width increase of the carriageway.
(CBC version)
Created by Billboyheritagesurvey // 1 thread
The new active travel route is due to open very soon. What needs fixing?
sound+fury // 1 thread
It's a hefty application that will need careful study.
Created by Steven Moseley // 1 thread
Construction of a 3 Bed, Two-Storey, Detached dwelling with garage andassociated parking. Movement of the existing pathway
Created by John Chamberlain // 1 thread
In September 2020, Camden Council put in a segregated southbound cycle track on St Pancras Way under Covid-19 Safe Travel regulations. It was done under an Experimental Traffic Order and they are now consulting on making it permanent or removing it. Details in the attached thread.
Created by Steven Moseley // 1 thread
Convert the existing eight bedsits within an HMO into three separate two-bedroom flats.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cross-party group
Active since 18 May 2021
Westminster is consulting on changes to Maida Hill Market (Harrow Road, Walterton Road). The proposed changes to cycling are limited but it looks from the design that cyclist would lose permeability to Fernhead road.
https://harrowroad.org/assets/Uploads/engagement/211127-Stage-3-Public-Engagement-Boards_MHM.pdf
Created by Steven Moseley // 1 thread
Outline application for 1no. new dwelling.
Created by Steven Moseley // 1 thread
Outline planning application for the development of up to 150 dwellings (including 30% affordable housing) with public open space, landscaping, sustainable drainage system (SuDS) and vehicular access points from Halstead Road and Fiddlers Hill. All ma
Created by Steven Moseley // 1 thread
Demolition of Mercury House and Food @ the Mercury Restaurant; fellingof selected trees; construction of 2-3 storey production block; construction of two-storey extension on northeast corner; infill of porte-cochere to provide internal ground floor acc
Created by catch // 1 thread
Objection to development of land west of Lakelands, off Church Lane / Western Bypass
Response here: https://www.ensembling.com/270062
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)