Fulbourn Neighbourhood Plan
The Fulbourn Parish Council and a group of volunteers from the village has been working to prepare a Neighbourhood Plan to influence the development of the village and the wider Parish.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
The Fulbourn Parish Council and a group of volunteers from the village has been working to prepare a Neighbourhood Plan to influence the development of the village and the wider Parish.
Created by Jean Dollimore // 1 thread
Camden Council is consulting on its proposals to make it easier to cross over the three roads at this roundabout.
One residents’ and three paid for parking spaces will be removed
The drawing is here
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Peterborough Local Plan identifies the required delivery of 19,440 new homes and 17,600 new jobs by 2036.
The 80-hectare Norwood site will provide 2,000 dwellings, a local centre and primary school. Delivery of the development has been sl=plit into two phases. The first phase includes up to 870 dwellings and auxiliary uses, including a primary school and local centre, and will initially be accessed via Newborough Road. The second phase will complete the build.
Development of 945 dewellings, a local centre, a primary school and a secondary school has already begun at the Paston Reserve (adjacent to the Norwood site).
The project requires improvements along the A16 corridor including a new access roundabout with the A16 and a new junction with Newborough Road. The plan is to connect the two points of access with an internal road.
Highways England have agreed in principle to the proposed interventions.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04705/FUL: Removal of Building E (Use Class B8). Extensions and alterations to existing buildings A - D (Use Class E) including first floor extension above existing frontage building, reinstatement of brick chimney, hard and soft landscaping works and associated works and infrastructure.
149 Cherry Hinton Road, Cambridge, CB1 7BY
Created by York Cycle Campaign // 1 thread
Conditions 22 (Submission of details of the junction between the internal access road and the highway) & 26 (Details of the highway works to be submitted) of planning permission 18/01296/FULM
Proposed Hotel 46 - 50 Piccadilly York YO1 9NX
York
Application reference : AOD/20/00352
Created by Steven Moseley // 1 thread
The Ministry of Defence (MOD) is investing in new military firing range capabilities for Colchester Garrison which will release Middlewick Ranges for disposal. This presents an opportunity for the site to contribute towards Colchester’s need for new housing, and the land has been identified in the draft Colchester Local Plan as being suitable for up to 1,000 new homes and supporting local infrastructure.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The council are consulting on a redevelopment of Ditton Walk.
Created by John Seton // 1 thread
A new town development of 25000 houses has been proposed on land that is roughly encircled by Barrington, Foxton, Shepreth, Meldreth, Bassingbourn, Whaddon, Wimpole and Orwell. This number of new houses and associated infrastructure is about half the size of Cambridge, so it would impact all these parishes, and existing cycling commuting and leisure routes in the area. Plans are a a very early stage, but the concept has so far caused concern at district and parish levels. A South West Cambridgeshire Action Group has been set up with representation from each of the parishes in the footprint. A first meeting has been held. The development promises a zero carbon footprint and green transport links.
Early days for detailed cycle campaigning input, so this is a placeholder to start discussions.
Created by Roxanne (CEO) // 1 thread
The Co-op at the Radegund Road/Perne Road roundabout have axed 3 out of 5 exemplary and well-used sheffield stands to install an Amazon collection point.
Created by Steven Moseley // 0 threads
Local Enterprise Partnerships (LEPs) were set up by Government in 2011 to identify and support local strategic growth priorities, encourage business investment and promote economic development. This approach puts businesses in the driving seat and empowers the private sector to determine its own priorities.
The South East Local Enterprise Partnership (SELEP) is a genuine partnership for growth between business, government and education. We put the role of enterprise – as the driving motor of the economy – at the heart of everything we do; and we work in partnership with central government and its key agencies to pursue and attract major investment into the South East to deliver significant economic growth.
One of 38 LEPs established by the government, our role is to forge a partnership which properly understands the economic challenges and opportunities of our area, encourage an environment which delivers prosperity and to be directly accountable to local people and local businesses. LEPs decide what the priorities should be for investment in roads, buildings, and facilities in the area as part of an integrated approach to growth and infrastructure delivery.
We represent the largest LEP area in England outside London, in terms of population and economic output, and cover an area encompassing the local authority areas of East Sussex, Essex, Kent, Medway, Southend and Thurrock.
Created by Steven Moseley // 1 thread
In March 2018 Transport East was launched, as a new Sub-National Transport Body to deliver a collective vision for the future of transport in Essex, Norfolk, Suffolk, Southend-on-Sea and Thurrock.
As a partnership, we bring together the local transport and planning authorities, and business leaders with Network Rail and Highways England. We enable the region to speak with one voice on the transport investment needed to drive transformational growth and improve the quality of life for all that live and work in the region.
Why do we need Transport East?
As one of seven Sub-national Transport Bodies covering England, Transport East will develop a Transport Strategy and Delivery Plan for the region which ensures that transport fully supports its members shared ambitions for economic growth, quality of life and prosperity.
Created by Chris Howell // 1 thread
The City Council through Cambridge Investment Partnership are running a consultation (pre-planning application) for their proposed redevelopment of 71-73 Fen Road, including improved cycle access to the 'Five Trees' open space. This potentially supports an improved new cycle route from Green End Road/Cam Causeway to the Chisholm Trail on Fen Road.
Created by Jean Dollimore // 2 threads
Camden Council is proposing the following changes intended to improve bus journey times, cycling and pedestrian facilities:
But they have forgotten to consider removing the speed cushions in Camden Park Road
The drawing also mentions the potential for vehicle activated speed signs on Torriano Avenue.
BUT
Created by Jean Dollimore // 1 thread
Camden Council recently implemented an LTN in the area around Arlington Road. Following feedback on the scheme, they propose two major amendments
1. No entry into Arlington Road from Inverness Street (i.e. southbound movements restricted to allow only emergency vehicles and bicycles).
This filter will be enforced by
Parking and loading will be forbidden within ten metres of this junction.
2. New filter on Mornington Place at the junction with Clarkson Row/Mornington Terrace (instead of the filter at Mornington Crescent.
This new filter will allow cycles to pass and will be enforced by
The junction of Mornington Place with Mornington Crescent will revert to two-way operation
Created by Jean Dollimore // 1 thread
Camden Council is currently installing Pop-up cycle lanes on Chalk Farm Road .
To facilitate this, they are proposing to make new parking changes to the existing Chalk Farm Road scheme affecting the following streets: Hawley Street, Hartland Road, Harmood Street, Ferdinand Street
Harmood Street: Through-traffic restriction scheme
Camden proposes a filter (that allows cycles and emergency vehicles to pass through) on Harmood Street just south of the junction with Clarence Way.
Enforced by:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04755/FUL | Erection of 1 No. 1.5 storey 2 bedroom dwelling, retention of existing flats, together with bin & cycle store and landscaping | 30 Davy Road Cambridge CB1 3QW
Created by Jean Dollimore // 1 thread
Camden Council has recently installed Pop-up cycle lanes on York Way. They are now consulting on proposals for three of the signalised junctions.
Agar Grove / Brewery Road junction
Freight Lane junction
Handyside Street / Copenhagen Street junction
Created by Flic // 2 threads
Ely hospital is up for redevelopment/expansion. Consultation docs so far don't describe anything other than first priority being a multistorey car park.
Created by Roxanne (CEO) // 1 thread
Issue for general campaigning activity and organisation in Abbey area.
Created by Stephen B // 1 thread
Unfortunately the road I travel a lot on in Littleport is badly pock marked and muddy from frequent farm machinery use.
In these circumstances close passes are even more critical than on better roads if they exist. Many cars give a decent safety pass adhering to the new directives in the Highway Code but many do not. I was shocked to be close passed by a police vehicle this morning and have reported it. I did not want to make a particular complaint but wanted it logged in an incident forum. The call handler suggested I would have to make an official incident report so I had to go down that route.
Created by Steven Moseley // 1 thread
Our Colchester Business Improvement District (BID) is an organisation that represents more than 400 businesses across Colchester town centre and aims to make a difference to our streets. By building relationships and partnerships with key stakeholders across the town, we see Colchester moving in a positive direction through Invigorating, Imagination and Connecting.
Our projects over the next five year will be targeted towards making Colchester a better place to work, live and visit. We will add value through business support, making Colchester cleaner and greener, town centre marketing and events.
Created by Jean Dollimore // 1 thread
Camden Council is consulting on a review of its parking permits and parking charges
Motivation: diesel vehicle ownership and trips have not reduced sufficiently to address the AQ impact.
The proposed changes are from April 2021 unless stated otherwise.
Residents Parking permits
The diesel surcharge to be raised from 21.5% to 50% of the petrol vehicle permit price (surcharge ranging from £65 to £237 per annum).
The petrol vehicle permit price depends on CO2 emissions and ranges from £130-£274 p.a.
Electric vehicles get free permits.
Visitors permits
Not mentioned in the consultation document so presumably remain the same e.g. £1.12 per hour.
Car clubs
The current permit price is £289. This will change to a price based on CO2 emissions with a diesel surcharge.
The price for electric cars will be £86. The lowest CO2 emission polluter pays £289.
Doctors’ permits
The same charges as for a Car Club vehicle.
Paid for parking sessions
Currently, the borough is divided into four areas each with different tariffs. The areas with the two lowest tariffs will be merged.
CO2 emission based charging will be introduced and the diesel surcharge will be raised from 21.5% to 50%
Electric vehicles pay from £2.40 to £4.14 per hour in areas 1 to 3 while the charge for petrol cars range from £3.43 (lowest polluter in the cheapest area) to £5.15 (highest polluter in most expensive area).
Increased price for coaches £13.82 per hour.
Maximum stay of 1 hour where there is currently no maximum and in CPZs with only 2 hours of operation.
South of Euston Road maximum stay reduced from 2 to 1.5 hour. From April 2022.
Motorcycle parking
Discount electric m/c residents’ permit (to £22 p.a.) and increase the price of petrol ones (to £130 p.a.). They also have business permits and visitor permits.
Convert all dedicated solo m/c bays to shared use with one of the various permits. No more free parking for m/cs.
Paid for parking £3.42-£5.92 per hour for petrol and £1.72-£2.96 electric per hour.
Created by Alex Jenkins // 1 thread
Liveable Streets is a multi-million pound borough-wide street and public space improvement programme. It aims to improve the look and feel of public spaces in neighbourhoods across the borough and make it easier, safer, and more convenient to get around by foot, bike and public transport. Tower Hamlets would like to hear your views on the proposals for the Old Ford Road West project area.
We've listened to your concerns on issues including:
What is proposed and why are the proposals important?
Four schemes have been developed to improve walking and cycling, create better public space, reduce through-traffic and improve air quality.
We are proposing traffic changes and calming measures to make local streets safer for everyone. This includes crossing improvements, better street lighting, tree planting, and School Streets.
Every day thousands of vehicles are travelling through the area and not stopping. These vehicles are contributing to the already unacceptable levels of air pollution on your streets, outside your schools and around your local shops. These proposals are also planned to work together with the approved Bethnal Green scheme and proposed changes in the Bow Liveable Streets area. This scheme in the Old Ford Road West area will provide essential links by creating improved active travel routes for everyone.
The Liveable Streets proposals will help improve road safety, public spaces, and air quality. However to achieve this some local residents who want to drive may have to travel longer distances.
All properties will still be accessible by vehicle, but people will also have greater choice on how they get around by removing barriers to walking and cycling.
The Local Plan is being replaced to a new version.
This is a multi-year process, involving several stages of consultation, research, and review.
This will replace the 2018 Local Plan. Discussion on that was at:
https://camcycle.cyclescape.org/issues/72-local-plan-2018-creation-and-review
Martin Lucas-Smith // 1 thread
20/04514/FUL | Erection of a building comprising student accommodation (C2)(113 rooms in 14no flats), including an ancillary reception building, part change of use of existing building from non-residential institution (D1) to cafe (A3), including outdoor terrace with associated landscaping, open space, car and cycle parking and infrastructure. | St Matthews Centre Sturton Street Cambridge Cambridgeshire CB1 2QF.
Neighbour Consultation Expiry Date: Wed 23 Dec 2020
Standard Consultation Date: Wed 25 Nov 2020
Standard Consultation Expiry Date: Wed 23 Dec 2020
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Shaun McDonald // 1 thread
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by aSemy // 1 thread
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area