Vision Zero Partnership
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
(Moved related thread created 2 months ago.)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 0 threads
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
(Moved related thread created 2 months ago.)
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Roxanne (CEO) // 1 thread
Further expansion of the Biomedical Campus
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of four dwellings, including a dropped kerb and associated infrastructure following the demolition of the existing buildings on site. | 8 Kings Hedges Road Cambridge CB4 2PA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Retrospective change of use from Hotel (C1 Use) to House In Multiple Occupation (HMO) (sui-generis) | Oakley Lodge 627 - 631 Newmarket Road Cambridge Cambridgeshire CB5 8PA
Created by Roxanne (CEO) // 1 thread
The Carter Bridge is looking worse for wear in many ways.
We've had a question about who is responsible for maintenance. Network Rail and Cambridge County Council, Cambridge City Council have apparently denied responsibility and there has been a suggestion that Essex County Council may be responsible.
What do we know about responsibility and previous actions to keep the bridge maintained?
Created by Will Bramhill // 1 thread
1960s roadbuilding seared through the town. Modern road planners have already provided a good toucan crossing between Wellesley Road and Crouch Street West across Southway/Lexden Road. Providing a better ramp from Wellesley Road would help facilitate this.
Essex Housing is redeveloping the Essex County Hospital site as housing. The company has agreed various cycling measures as part of this scheme. It has allocated £25,000 towards remodelling the Wellesley Road/Creffield Road/Maldon Road junction. Gwyn Owen, head of Essex Housing, has agreed that any money left over can be put towards a new, wider ramp. There may also be funds from the Local Highways Panel.
Created by Steven Moseley // 5 threads
Of and relating to Essex County Council.
Created by Steven Moseley // 1 thread
The response to, and effects of the coronavirus pandemic
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Steven Moseley // 7 threads
Policy Documents, guidance, consultations etc. from UK Government.
sound+fury // 1 thread
From the previous thread:
Key information:
The establishment of the new JDCC, composed of members from both South Cambridgeshire District Council and Cambridge City Council have now been completed and the previous JDCC has been dissolved...
'In terms of the remit of the new Committee, some cross boundary sites have been included that were not within the remit of the previous Committee ... both Councils have adopted Local Plans which include specific policy designations – some of which overlap the Administrative boundary of the two Councils. Whilst both Councils have created a shared planning service, this does not change the statutory position of the two Councils as distinct “local Planning Authorities” ... The additional sites include the North East Cambridge Area Action Plan areas within both City and SCDC, Cambridge Biomedical Campus/Addenbrookes site and the extension of Peterhouse Science Park/ARM on Fulbourn Road.'
Created by Rosamund Humphrey (Admin Officer) // 2 threads
Site: The Meadows Community Centre, Arbury
Proposal:
Erection of new community hub and 22 council rented affordable dwellings, car parking, replacement multi use games area, new vehicular access off Arbury Road and enhancements to the recreation ground and installation of substation (as part of wider proposal for the full Meadows site seeking permission for the demolition of existing community centre and the erection of a new community hub, 78 affordable dwellings, car parking, a replacement multi use games area, new play equipment, the creation of new vehicular accesses on to Arbury Road, Daisy Close and St Catharines Road, the provision of new landscaping and substation and the installation of drainage to the football pitch and associated land levelling together with land reprofiling).
https://consultcambs.uk.engagementhq.com/lancaster-way-consultation
Capacity improvements are currently underway to the A10/BP roundabout, required as part of the approved Lancaster Way Business Park expansion planning application.
This is a vital development to support economic growth within East Cambridgeshire and expected to generate 2,500+ jobs, 75% will be from the local area. Cambridgeshire County Council agreed to carry out a feasibility study encompassing the A10, BP and Lancaster Way roundabouts to assess the current congestion issues limiting future growth which was completed in October 2018.
This study identified that capacity improvements at the Lancaster Way roundabout would also unlock further benefits of the measures now being constructed at the BP roundabout. The County Council has started to look at what improvements could be made to the Lancaster Way roundabout and the Cambridgeshire and Peterborough Combined Authority and East Cambridgeshire District Council have agreed to provide funding.
The public have the chance to offer comments for consideration on the proposed design.
This consultation is to share the details with residents and receive feedback. We may share your information with our partners in this consultation (East Cambridgeshire District Council and Cambridgeshire and Peterborough Combined Authority) and with the council analysis team.
You do not have to give us any personal information. We will not publish any personal details you do give us, but may publish our response, and include it in public reports, with personal details removed. Personal data will be held securely, in accordance with data protection legislation. We will only store it for 12 months after the consultation results have been analysed and the consultation report published.
Please view the consultation information prior to completing this survey, online at https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/transport-projects/a10-a142-lancaster-way-roundabout(External link)
All surveys should be completed by the closing date of Friday 18 September 2020.
Your views on the project are welcomed.
It's the usual motorist-centric tripe of course, with ridiculous excuses for not building a signalised crossing ("it's rural" - nevermind that Babraham is also rural and they are doing it there).
Following Dft Phase 1 funding arising from the current Covid19 situation, designs are available for cycle lanes covering the approximate 3.2km length from the Haringey boundary to just south of North Finchley.
The design principle has been, where possible, to provide a temporary lightly segregated cycle lane, defined by wands, bolted into the carriageway surface at 4m spacings. In some cases, we have taken a cycle lane width of 2.5m. In other locations, where space permits, we have re-allocated the whole of a current running lane.
At other locations, we have needed to retain a ‘with traffic’ cycle route. In order to mitigate this, these sections of the route will be provided with carriageway cycle markings and signage as is usual, but complemented with the introduction of 20mph limits.
Monitoring of the route will take place (and indeed has already started) to assess cycle and motorised traffic volumes, as well as to assess any changes to the temporary layout that may be necessary.
In developing the design we have engaged with TfL’s cycling sponsors and have incorporated, where applicable, comments and suggestions from their design audit teams and our safety advisors. We have also obtained support from the police in respect of the 20mph limits.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Safety concerns have been raised around Coldham's Lane - specifically, the stretch running from Coldham's Lane roundabout to the Toyota garage.
These concerns ought to help inform proposals for the CL roundabout and the Marshalls land on Coldham's Lane.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
We're working towards a glossary of key terms to help members and the public.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02871/FUL | Erection of 1no. dwelling adjacent to No.30 Caravere Close - Resubmission of 19/0774/FUL | 30 Caravere Close Cambridge CB4 2UG.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02869/FUL | Conversion of single dwelling into two separate dwellings complete with additional rear extensions and loft conversion to main dwelling | 1 Silverwood Close Cambridge CB1 3HA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02821/FUL: Change of use from HMO (use class C4) to large HMO (8 person) (sui generis)
4 Moss Bank Cambridge CB4 1UR
Created by Steven Moseley // 1 thread
Thanks to planning hiccups in the 90s and 00s, there is a missing section of the path between Rouse Way and Meander Mews that prevents it from being used as an alternative for walkers and cyclists to Cowdray Avenue, or as part of leisure routes, e.g. a riverside loop.
Photograph: John Collett, Colchester Civic Society
This is a consultation about Abbeygate House
Created by Rosamund Humphrey (Admin Officer) // 1 thread
19/0261/NMA1 | Non-material amendment with respect to planning permission reference 19/0261/FUL (Erection of 3 no. retail units (2 x use class A1 and 1 x use class A5), 1no. Community Centre (use class D1) and provision of 14 no. dwellings (8 flats and 6 maisonettes) following demolition of existing commercial units and flats).) The amendments sought are the introduction of additional doors to the northern elevation of Block B, and the provision of a new external cycle store to Block B. | 74-82 Akeman Street Cambridge Cambridgeshire CB4 3HG
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.