Lack of cycle link between Buckland Valley and Dover Christ Church Academy
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Gregory Williams // 3 threads
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
Created by Gregory Williams // 1 thread
There is a comparatively new shared path linking Burgess Road to Alyesham's station. However the Burgess Road end of the shared path doesn't have a dropped kerb to allow a transition between road and path and vice-versa.
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
Created by Gregory Williams // 1 thread
The sign towards the Town Centre is missing. Previous view of the sign here:
Created by Gregory Williams // 1 thread
The sign pointing into Alfred Road at Lorne Road is missing.
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (CEO) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Street Light FCND004 on Falala Way (NCN1) - Not Working Fault Number: 750068
Created by Owaldron // 1 thread
See Picture, Reported to CCC. However, I have a hunch that it may be the responsibility of 'LandMarc' on behalf of the MOD as I think they would own that land.
Created by Gregory Williams // 1 thread
A better cycle connection is needed to Rough Common, avoiding the need to use the A290 Whitstable Road or A2050 and Palmars Cross Hill.
20mph sign has twisted round and a sign directing to the station is pointing slightly in the wrong direction
Created by Gregory Williams // 1 thread
The cycle route on AE18 between AE429 and East Stour Farm has become overgrown and difficult to cycle through.
Created by Gregory Williams // 1 thread
Chilham station is signposted from National Cycle Route 18 via Pickelden Lane. However, the link towards NCR18 isn't signed from Chilham station and the portion along the A28 corridor isn't signed as a cycle route. The A28 is too busy for normal cycling. The path on the south side between Pickelden Lane and Chilham station should be made into shared use.
The incident has been reported to Kent Police as criminal damage, Crime Ref: 46/139801/23.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a space for discussion around Cambridgeshire County Council's proposal (published on 27th September 2023).
Created by Gregory Williams // 1 thread
The cycle parking at Morrisons needs improvement. It is situated at the far end of trolley park with only some surveillance, rather than adjacent to the entrance where it would receive better surveillance. The capacity is limited by the fact that only one side of the railings can be used.
Created by Gregory Williams // 1 thread
The cycle / pedestrian route signs at the junction between the Crab & Winkle Way and Oyster Bay Trail at Stream Walk / Albert Street / Action Road have gone missing.
Created by Gregory Williams // 1 thread
2 cycle storage units.
Dragonfly House Mayfly Close Canterbury Kent CT1 1HS
Canterbury
Application reference : CA/23/01343
Created by Josh Grantham // 1 thread
Erection of 14no residential dwellings and associated works including demolition of existing dwelling.
16 The Lanes Over Cambridgeshire CB24 5NQ
South Cambridgeshire
Application reference : 23/03395/FUL
Created by Gregory Williams // 3 threads
A safe cycle route is needed to link Wingham with Canterbury. The current A257 road environment is not attractive for cycling, due to high motor traffic volumes and speeds.
Created by Gregory Williams // 1 thread
The cycle parking provision at Whitefriars is minimal and at the periphery. Well surveilled provision is needed close to the shops that it will serve.
Created by Gregory Williams // 1 thread
The streetscape has recently been repaved in St. George's Street, but it lacks cycle parking.
Created by Gregory Williams // 0 threads
The cycle parking outside Faversham Pools doesn't support bicycles properly and is poor because it doesn't encourage the frame of the bicycle to be locked.
Created by Heather Coleman // 1 thread
Starter; instructions for who to report overhanging or overgrown vegetation which is obstructing a cycle or footpath. Place for people to discuss specific examples as they seem to currently be spread out all over Cyclescape so hard to find.
Created by Gregory Williams // 1 thread
The section of the Crab & Winkle Way / NCR1 linking Westgate Court Avenue to Duke's Meadow is narrow, has sharp corners, and has poor visibility. This means that it can be difficult for cyclists and pedestrians to pass and see one another.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by Andrea Bredel // 1 thread
this is one of many cycle lanes here in Ipswich that go on and off the road several times. This is very awkward for cyclists as they need to be very careful when getting back onto the road and most probably confuses drivers as well.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en