Potential route Beacon to Station
Often talked about
aspiration in FifePlan
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Often talked about
aspiration in FifePlan
Created by M Stanley // 1 thread
West Yorkshire combined authority are consulting on improvements to cycling and walking links in Pudsey with the aim of improving access to New Pudsey station
Anon // 1 thread
Borough Road - Healthy Streets
Closes 4 Nov 2019
Opened 8 Oct 2019
Contact
Joanna Lesak
(Project Manager)
Overview
We would like to know your views on proposals for Borough Road. We are proposing improvements to the environment to encourage cycling and walking in line with the Healthy Streets approach. Borough Road is part of London's wider strategic cycle network as well as the council's Southwark Spine route, and together with Harper Road links Cycleway 6 at St George's Circus to Cycleway 17 at Falmouth Road creating a strategic east-west route.
The key measures proposed are
Please respond to the online questionnaire below by 4 November 2019.
Background
In 2014 over 1400 people in Southwark were consulted by the council on cycling, and the proposed Southwark Spine cycle route was a key feature of the proposals, linking the north and south of the borough. The 2015 cycle strategy subsequently identified the Southwark Spine as a key deliverable to offer a direct, safe, attractive, comfortable and easy cycle route, for all ages and abilities.
Borough Road and Harper Road comprise the northern section of the Southwark Spine. Street improvements in Harper Road between the junction with Borough Road and Falmouth Road have been consulted on separately to link in with the proposed refurbishment of Dickens Square Park; a link to the informal consultation and updates on timescales of projects in the area are provided in www.southwark.gov.uk/harperroad.
Why We Are Consulting
We have identified a number of issues with the current road layouts that make Borough Road and Harper Road feel unsafe and intimidating for vulnerable road users, particularly cyclists, and that affect bus journey times.
Our proposals
We would like your views on the following proposals which aim to reduce these issues.
The proposals improve Healthy Street indicators including making it easier to cross the road, improving the environment for pedestrians from all walks of life, helping people feel relaxed and safe, and encouraging people to walk, cycle and use public transport. The results of the draft Healthy Streets check (subject to change) are shown in the spider graph below
Well used, but narrow, path.
Downhill section owned by FC, rest Forth Ports.
Before the railway came the Lammerlaws (Lamberlaws on some maps) stretched inland almost as far as the Parish Church.
Now it’s mostly thought of as the name for the ‘wild’ bit of the peninsula at the of Lammerlaws Road.
The Community Council produced an improvement plan for the area in 2018.
http://www.burntislandcc.org.uk/Index.asp?MainID=25915
The ambition has since been scaled back.
https://burgh.buzz/2019/09/17/burntisland-small-improvements-planned-for-the-lammerlaws/
The area is part of an SSSI so any work requires permission from SNH. It is expected to be given.
Created by chdot // 1 thread
WW2 pillbox
Has survived for 80 years and has recently attracted a small amount of vandalism
http://burgh.buzz/2019/09/04/vandalism-on-the-lammerlaws/
Needs a plan for conservation/interpretation
Presumed to be owned by FC
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Anon // 1 thread
Overview
Give us your views on proposals to introduce a new section of bus lane on Croxted Road.
We want to improve bus journey times along Croxted Road, as it has been identified that buses experience delays along this section, in particular just south of the junction with the A205 South Circular Road - northbound buses are sometimes unable to access the bus stop due to a combination of queuing traffic and parked vehicles upstream of the bus.
In order to support this, we are proposing to introduce a short length of northbound peak only bus lane installed between the junction of Ling’s Coppice and the bus stop south of the A205 South Circular Road (Stop WS). The bus lane will operate from 7am-7pm Monday to Saturday and would require introduction of new kerbside restrictions of no waiting and no loading to match the operational hours of the bus lane i.e 7am to 7pm Monday to Saturday. To support these changes on the western kerbline, it is also proposed to introduce no waiting/no loading restrictions on the eastern kerbline during bus lane hours.
These proposals should improve journey times for passengers using the route 3, which is a high frequency service between Crystal Palace and Trafalgar Square. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.
We would appreciate your views on these plans, and whether there are any issues that we should take note of.
Why We Are Consulting
We would be grateful if you could take the time to review the proposal attached below and let us know what you think using the online questionnaire.
Your views are really important to help us make sure the final design meets the needs of the local community.
Concern at September Community Council about need for barrier to discourage young people from running into the road on way to Music Hall.
19/1212/FUL | Demolition of the existing octagonal building and erection of two new student accommodation buildings comprising 23 rooms. Replacement of existing gardeners accommodation with free-standing gardeners' building, replacement of cycle storage, new boundary and entrance treatment. | St Chads 48 Grange Road Cambridge Cambridgeshire CB3 9DH
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
As part of the City Council's plan to build 500 new homes in Cambridge by 2022, Cambridge Investment Partnership (CIP) is proposing to build around 78 new council-rented homes and a new community facility on Campkin Road.
Tom McKeown // 1 thread
Planning for a direct action to close Station Road.
Created by JonC // 1 thread
The Countryside Management Service is currently developing a Greenspace Action Plan for the Ayot Greenway. Attached (see thread) is the briefing document which explains more about the community engagement and plan production process. This briefing document is being sent to relevant local stakeholders. There will be further engagement on a draft plan during January and February 2020.
We would welcome any comments you may have on the objectives proposed, or your thoughts on the future management of the Ayot Greenway. Should you have any questions, or if you would like to meet to discuss the plan, please get in touch with me using the contact details below.
Rhiannon Barton, Trainee Land Management Projects Officer
Countryside and Rights of Way, Environment and Infrastructure Department
Hertfordshire County Council I County Hall I Pegs Lane, Hertford I SG13 8DN I Postal Point: CHN101
( 01992 555173 (Comnet 25173) Email: Rhiannon.Barton@hertfordshire.gov.uk
Created by Paula Downes // 4 threads
The road is unloved, has very few trees, has a lot of traffic, moving fast or jammed. Air quality is poor. Cyclists cycle along the pavement very fast which is dangerous for pedestrians. The cycle lanes on the road are not safe. It is difficult for cyclists to cross the road since there are not enough crossings. A lot of people park near Coldhams Common on Saturdays. Many people have created driveways to avoid people parking in front of their houses in the parking bays. Crossing the little roads (Brampton, Vinery Road, Vinery Way) is difficult because the cars block the path as they wait to get onto Coldhams Lane and greenery prevents pedestrians from going behind those cars.
Outline application (all matters reserved except for means of access in respect of junction arrangements onto Worts' Causeway and Babraham Road) for erection of up to 230 residential dwellings (including affordable housing), community facilities within Use Classes A1/A2/A3/A4/B1/D1/D2, new landscaping and public realm, car and cycle parking, infrastructure, other associated works following the demolition of all existing buildings on the site.
Created by Sylvia Gauthereau // 1 thread
Brent Council:
Overview
We are proposing to pedestrianise part of Oaklands Road (between Oaklands Passage and Cricklewood Broadway) and create a Liveable Street by removing general traffic and improving the urban realm.
Why We Are Consulting
The proposed scheme aims to create a new, high quality, calm and interactive community space in the heart of Cricklewood. This supports the Council’s commitment to improving our town centre environments, encouraging walking and cycling and improving air quality. It will also establish a less congested environment for the long-standing fruit and vegetable stall and an accessible and safe route for pedestrians, cyclists and people with mobility difficulties.
Created by Hounslow Cycling Campaign // 1 thread
The Liveable Neighbourhoods project in south Chiswick combines a range of schemes across the Grove Park and Dukes Meadows area that focus on increasing the number of trips made by foot, bike and public transport while improving local public space.
Hounslow Council has secured funding through Transport for London’s Liveable Neighbourhood programme to progress this project. Certain elements of the project are well defined, such as the proposed pedestrian bridge under Barnes Bridge and a new public square in Grove Park near to Chiswick Station. Alongside this there are also broader aims to provide improved walking and cycling links across the area while also looking to address well known issues of excessive traffic volumes and speeds in residential areas, which are often used as cut-through to access major roads.
Richard G // 1 thread
Default traffic light phase is for red on the vastly more used busway/cyclepath, rather than for the infrequent crossings of Hobson Avenue.
How to go about changing it
Created by Roxanne (CEO) // 1 thread
GCP project:
Junction 11 of the M11 is a key entry point into Cambridge. With significant growth in housing and employment in the area, upgrading the existing transport infrastructure in this area is vital to reduce congestion and improve access into the city.
Congestion impacts on current bus journey times making journeys unreliable, unattractive and longer than necessary, as well as affecting the convenience and comfort of cycling trips on the corridor.
By expanding the existing Travel Hub in Trumpington and creating more Travel Hub provision (either by creating multi-storey parking at the Trumpington site or a new Travel Hub to the west of Junction 11), car drivers can be encouraged to complete their journeys by bus. More Travel Hub use would help the flow of traffic and make employment sites such as the Cambridge Biomedical Campus, West and North Cambridge easier to reach.
A consultation on increasing Travel Hub spaces to the south west of Cambridge ran until 21 December 2018. Thank you to those who attended our events and responded to the consultation. We will now collate the responses and publish a report in the Spring of 2019.
The Cambridge South West Travel Hub Project is a component of the West of Cambridge package, which includes review and development options for Travel Hub facilities, creation of new Travel Hub locations, and enhancement or upgrade of existing facilities.
Created by Jean Dollimore // 1 thread
Camden is consulting on a proposed Healthy School Street zone around the following schools:
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Simon Munk // 1 thread
From Hackney council:
Help us improve cycling on Queensbridge Road between Hackney Road and Whiston Road
We are seeking your views on proposals that will create a protected cycling route along Queensbridge Road to form part of a network of safe cycling routes between the Quietway link at Whiston Road and Quietway 13 at Columbia Road.
Hackney Council is working in partnership with Tower Hamlets and Transport for London (TfL) to make cycle accessibility improvements on Queensbridge Road from Hackney Road to Dalston Lane as part of the Central London Cycle Grid (CLCG) from Bethnal Green to Dalston Lane. The improvements at Queensbridge Road are being developed in three sections:
Hackney, Tower Hamlets, and TfL are committed to making our streets safer for everyone. These changes aim to encourage more walking and cycling, improve air quality and reduce emissions within the local area. Hackney and Tower Hamlets recognise that streets are not just places to park vehicles or drive, but to walk and cycle on too. They are the places where we socialise and live our lives. An aspiration of both boroughs is to reclaim streets from motor traffic and congestion and transform them into attractive and liveable neighbourhoods.
Queensbridge Road is one such street. Although it is a relatively wide road (about 10.5 metres wide), it was designed for the rapid transit of motorised vehicles and parking. The traffic islands and hatched road markings leave little room for other road users such as pedal cyclists and pedestrians. Between Hackney Road and Whiston Road, 28 collisions were recorded between 2013 and 2017. Sixteen of them involved pedal cyclists.
The proposed improvements would change the nature of Queensbridge Road to make it a healthier, safer and more pleasant environment for walking and cycling, reflecting the needs of the local area, including its residential estates, Haggerston Park and Haggerston School.
What are the proposals?
The following measures are proposed:
Queensbridge Road raised cycle tracks
Dunloe Street shared zebra crossing
Hackney Road junction improvements
Kent Street raised entry table and zebra crossing
Refurbishment of pavements and carriageways
Whiston Road junction
Please download the plans below for more details
Layout plans from Hackney Road to Whiston Road
Layout plans from Hackney Road to Whiston Road
Detail 1: Dunloe Street junction
Detail 2: Hackney Road junction
What are the potential impacts of the proposals?
Parking
Future schemes
The rest of the cycle grid to the north of Whiston Road will be consulted on and developed as follows:
What happens next?
Your views will be taken into account as part of the detailed design process. We will publish the consultation responses as well as the decisions made at consultations.hackney.gov.uk
To keep up to date with this and other plans, please visit hackney.gov.uk/street-consultations
Permanent works
If the scheme goes ahead, following consultation, we expect construction works to start in January 2020.
Frequently Asked Questions
Q. What is a raised cycle track? Can pedestrians and motorised traffic use the cycle track?
A. A raised cycle track is a section of highway where pedal cyclists have right of way. It is vertically separated from motorised traffic by a kerb and from pedestrians by a raised pedestrian/cycle separator.
Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?
A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings.
Q. What are blended pedestrian crossings and will traffic give way to pedestrians at them?
A. Blended crossings are pedestrian crossing points designed to slow down vehicles when entering or exiting side roads, encouraging vehicles to give way to pedestrians crossing the road.
Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?
A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings
Created by Edward Leigh // 1 thread
We know we need thousands more cycle parking spaces in future to meet ambitions to reduce car trips into the city and cope with the huge population and employment growth that the region is already committed to in its Local Plans. There is very little highway space available in the city centre, so we need to re-purpose other spaces, such as multi-storey car parks. I want to see if we can develop a policy to put to the City Council that they could act on. We've been discussing locations for new cycle parks for years (see linked Camcycle article), so what's the hold-up?
Created by Jean Dollimore // 1 thread
Camley Street Neighbourhood Forum proposes a neighbourhood plan for the area shown in the image with this issue
Demolition of existing building and construction of 3no two storey dwellings, with additional living accommodation in the roof of each, and 1no 2 storey detached dwelling, with private access drives to the front and rear, amenity space and landscaping.
https://idox.cambridge.gov.uk/online-applications/simpleSearchResults.do?action=firstPage
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Created by Martin L-S // 1 thread
Ever since Tesco opened their new shop on East Road, there has been poor unloading practice.
The company is unloading always from the front of the store with a large lorry which:
- Is stopped in the (advisory) cycle lane.
- The tail of the lorry is opened into the carriageway without a banksman, with the corner of it at the same height as a cyclist having to merge round the lorry - there is real potential for a head injury because of the relative invisibility of this
- Causing traffic to be reduced to one effective lane (or two, just squeezing through, if no large vehicles), causing delays for a half an hour period.
They have stopped using the zig-zag lines.
This photo shows the danger that is created:
http://www.cyclestreets.net/location/68145/
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
From member R.A.G.
There used to be two very useful cycle boxes (ASLs) in either direction at the junction traffic lights where ARR crosses SR. However, they have relayed the junction, and also repainted, but these two ASLs have disappeared.
While I actually think that a lot of ASLs are not that necessary (when the only option is to go straight on or turn left, and the volume of cyclists is always very low) as I'm sure you are more than aware, ASLs in positions such as these ones, are actually very important. If you are turning left from ARR onto SR the it is not an issue, however if you are continuing on ARR across the junction, then it is. ARR crosses SR with a slight left right shimmy, so you have to turn left first, then be in the right hand lane on SR, before you turn right to continue onto ARR, which is almost impossible/very dangerous without taking up the centre of the ARR single lane, before temporarily turning left onto the SR right hand lane of two.
I would like to think that they will be painted back in time, but it would seem that all other painting has been completed, and the workmen have moved on, so it doesn't look likely.
It is mildly ironic, while supposedly increasing cycling safety down SR, they have in turn decreased it on an adjoining roads such as ARR, and perhaps numerous others.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Dawes Jaguar // 0 threads
Bunbury Road is busy, but road users emerging from Woodlands Park Road and Northfield Road have to play a game of chicken as they try to judge the best moment to make a rapid exit without crashing into each other. Adding to the processing overload, the following must also be taken into account by road users:
* A service road opposite Woodlands Park Road connects with Bunbury Road at this point.
* A cycle path runs from the junction down to Bunbury Gardens.
* A zebra crossing, one that many motorists (including police drivers) fail to stop for, presumably because of the processing overload.
Lacking acceleration, cyclists face a long wait either at the junction or the zebra crossing. Either way they risk being mown down by a motorist lacking the superhuman skills required to negotiate this junction safely. Since even police drivers make dangerous mistakes here, then it is clearly hopelessly wrong.
There is quite a bit of space here. I would suggest as a minimum a single lane roundabout be created, but since Bunbury Road is busy and there is already a cycle path here it should be made a proper Dutch-style roundabout. To ease the design, close Northfield Road at this point to motor traffic (Northfield Road runs parallel to Bunbury Road).
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Created by Jean Dollimore // 3 threads
The North-South Cycle Superhighway is already under construction between Stonecutter Street and Elephant & Castle.
TfL, together with Camden and Islington Councils, is now consulting on proposals to extend it north up to King’s Cross.
The proposal is that it should continue north on Farringdon Road to Greville Street where northbound cyclists would turn onto a quiet back-street route to King’s Cross.
Southbound cyclists from King’s Cross would turn off the back-street route onto Farringdon Road at Ray Street via a new signalised junction and continue south on a stepped cycle track.
Detailed proposals
Section 1 - Farringdon Street (between Stonecutter Street and Holborn Viaduct)
https://consultations.tfl.gov.uk/cycling/afgdegdg8t9
Section 2 - Farringdon Street (between Holborn Viaduct and Charterhouse Street)
https://consultations.tfl.gov.uk/cycling/afgdasrcgrm2908
Section 3 - Farringdon Road and Saffron Hill (between Charterhouse Street and St. Cross Street)
https://consultations.tfl.gov.uk/cycling/rcgrthth5w6
Section 4 - Farringdon Road and Saffron Hill (between St. Cross Street and Ray Street)
https://consultations.tfl.gov.uk/cycling/cg25ty5cy
Section 5 - Farringdon Road, Ray Street, Herbal Hill and Warner Street
https://consultations.tfl.gov.uk/cycling/cg5eh4h
Section 6 - Warner Street and Phoenix Place
https://consultations.tfl.gov.uk/cycling/cv45h646
Section 7 - Pakenham Street, Calthorpe Street and Cubitt Street
https://consultations.tfl.gov.uk/cycling/c5hv365j753j
Section 8 - Ampton Street, Sidmouth Street and Tavistock Place
https://consultations.tfl.gov.uk/cycling/vch34yv3u
Section 9 - Tavistock Place and Judd Street
https://consultations.tfl.gov.uk/cycling/qgc245y
See also this related scheme for the treatment of the Euston Road junction and continuation northwards: http://camdencyclists.cyclescape.org/issues/2057-midland-road-and-euston-road-judd-street-junction-north-south-cs-link
Created by Simon Munk // 1 thread
The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.
Proposals
Based on the results of the survey and the feedback from Emergency Services we have
developed a set of proposals that aim to make improvements for all road users:
• Bus stop improvements to provide better access for passengers including disabled users.
• Improve and raise the existing zebra and signal crossings.
• A new raised zebra crossing on Billet Road near Cecil Road.
• 20mph speed limit along Billet Road.
• Better and energy efficient street lighting.
• Tree planting and footway resurfacing along the road.
• A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
• Two-way, fully segregated east and west cycle track.
• New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
• Raised areas at junctions that prioritise pedestrians and slow traffic down.
• De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
• Parking bays relocated at certain unsafe locations along the road to be converted to
segregated cycle track. New parking bays will be provided nearby.
• Various waiting and loading restriction at locations of concern to improve road safety
and ensure smooth flow of traffic.
• Anti-skid surface to help prevent vehicles from skidding.
Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.