12/0603/FUL | Construction of a cycle shed to existing car park area
80-cycle prefab shed using sheffield stands, replaces 7 car spaces. Need to check the application and welcome it if this is as positive as it sounds.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Martin Lucas-Smith // 1 thread
80-cycle prefab shed using sheffield stands, replaces 7 car spaces. Need to check the application and welcome it if this is as positive as it sounds.
Created by Heather Coleman // 2 threads
This is a planning application variation for 42 Fen Road, Milton. Application no (south cambs) is S/0756/12/VC
Permission had been given, but I noted as I passed the other day, that there was an application for a variation. Looking at this, one item seems to be to vary the "cycle storage".
From the description in Addendum to Design, Access & Herigage Statement in plans and docs:
I quote
"The bin / cycle store has been relocated and enlarged to allow for a tool shed. It was felt that
the proximity of the previous store to the proposed dwelling had an adverse impact on the
street scene and cluttered up the entrance area. By setting it back within the garden space it
was felt this would positively enhance the character of the area. Additionally, as a temporary
structure it is felt this would not have any more of an impact on the surrounding trees than
the current position of the bin store."
Or if you look at the map, the cycle "storage" (should that be parking?) now appears to be round the back end of the garden, and as a hedge is shown surrounding the car parked at the front of the property, I am at a loss as to how it would be at all convenient to ever get a bike out of this shed, rather than just getting into the car.
Of note is the fact that this proposed house is about 15 yards off NCN 11. In one direction*; this gives a virtually traffic-free route almost into Cambridge city centre or to Waterbeach railway station. In the other direction, NCN 11 heads through Milton Country Park, leading almost directly to the local Tesco superstore as well as to the Coston bridge, Science Park, Guided Busway. Thus, it could be possible to live an almost entirely car-free existence at this location.
*Fen Road is erroneously described as a cul-de-sac in the application. It is to motor vehicles, but is in fact a through route to the city centre for cycles and pedestrians.
From the 2004 South Cambs local plan
"To promote the use of more sustainable modes of transport, such as public transport,
walking and cycling by making such modes more accessible, safer and more attractive
to use.," and "To promote sustainable travel by ensuring new development takes place in highly
accessible locations."
" To limit the amount of car parking provided in new developments, where appropriate,
to reduce over-reliance on the car." "adopting on-site and/or off-site design features that promote
access by non-car modes as far as practicable (including
walking and cycling) and facilitate and encourage their use"
Of course there appears to be nothing about accessibility of cycle parking cf car parking, unlike the City Council local plan.
Is it worth putting in an objection? The publicity end date is 5th June.
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Created by David Earl // 1 thread
Application to build a bridge over the brook to provide rear foot/cycle access to the school.
Martin Lucas-Smith // 1 thread
Speeding can be a problem on Granchester Road.
Created by Rohan Wilson // 1 thread
Existing building to be rearranged internally for surgery and medical admin. There is locked-away cycle parking for staff (quantity not spec), but none proposed for patients/ visitors. See thread for Sustrans' objection.
Created by Rohan Wilson // 10 threads
Turnstone, a consortium, is hoping to build a new town, to be named Denny St Francis, adjacent to Waterbeach (the barracks site, plus). Like any large development, cycling conditions need to be good.
Converting one-way streets to two-way cycling has long been a Cambridge Cycling Campaign priority.
Progress has been made, with Hope Street being made into a two-way street with a no motor vehicles exemption at one end.
Now that Except Cycles signs under No Entry signs are permitted there is scope for extending this to Romsey Streets.
Created by Klaas Brümann // 1 thread
South Cam is working on a cycling project between Haslingfield and Grantchester, proposed by the Haslingfield Parish.
Martin Lucas-Smith // 1 thread
The Cambridge East development is in the 2006 Cambridge Local Plan and would have a big effect on cycling and traffic more generally in the area.
Martin Lucas-Smith // 1 thread
The City Council will be designating Sheep's Green & Coe Fen as a local nature reserve in 2012, in recognition of the site’s value for both wildlife and recreation.
As part of the process, a management plan has been prepared to establish a long-term vision for the site and to guide ongoing maintenance and habitat-restoration works.
They are seeking public comments on the draft plan, prior to formal adoption and designation of the site.
It is important that the proposals are scrutinised to check whether this will have any effects in the longer term on cycling and path improvements.
Martin Lucas-Smith // 1 thread
Now that the East Road gas works have finished, the road has been patched up, but in a very bumpy way. Although the tarmac is smooth, it is not at the same height as the original road so riding along is continually bumpy.
Created by Rohan Wilson // 1 thread
A further application following several rejections.
Planning application to demolish 32-38 Station Road and build two office blocks. This is a revised application.
Application is called 'Fifty & Sixty Station Road'.
Documents are completely inadequate for this listed building. I submitted this objection:
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The application form indicates that there is currently no cycle parking and that none is intended. This is unacceptable - the development must conform to the Council's standards in quantity, location and type.
There are insufficient graphic details on which to assess the application.
RW for Sustrans 3 May 2012
Created by Rohan Wilson // 0 threads
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
We note that 3 Sheffield stands are shown within the cycle shelter - good provision for a site which is on the city's Signed Primary Cycle Network. It is important that they should not be installed too close to the rear wall, and that the spacing between each and between stands and side wall should meet the City Council's standards - see Cycle Parking Guide.
Only 3 bins are shown - is this acceptable, for recycling etc?
RW for Sustrans 3 May 2012
Objected.
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
We are concerned that there may not be sufficient space in the rear "bikes and bins" (unattractive combination!) room. It is important that the Sheffield stands indicated should be installed as shown, and to park or remove a bike, rearward space is essential (See the City Council Cycle Parking Guide), adequate as drawn. But only five refuse bins are shown, one for each apartment. Normally each would need 3 bins (black, blue, green), for which there would clearly be insufficient space.
RW for Sustrans 3 May 2012
Created by Rohan Wilson // 0 threads
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The documents state that cycle parking is to be increased to 4 spaces (staff) and 6 spaces (pupils), but gives no indication as to its type, location, or whether it is sheltered.
We consider the quantity to be provided seems unambitious, especially considering the site is in a quiet street close to routes on the city's signed primary cycle network. The cycle parking should be of Sheffield stands, convenient to the building's entrances, in a clearly visible location, and sheltered. See the City Council's Cycle Parking Guide for information.
We recommend that more spaces should also be provided, better to encourage a healthy alternative to car use. We note that the site is a listed building whose character and surroundings are not likely to be enhanced by full occupation of the "ample" car parking mentioned in the D+A Statement.
RW for Sustrans 3 May 2012
Created by Kevin Hickman // 0 threads
Poor provision for cycling in the submitted plans.
Created by David Earl // 1 thread
BBC R Cambs want to interview someone at 07.05 tomorrow (May 1) about the potholed condition of Mill Road.
Created by cobweb // 1 thread
Plans are mooted to paint directional signs on the roads in the city centre to alert bike users to the legal direction of travel.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Martin Lucas-Smith // 3 threads
Cambridge United are proposing a new stadium in Trumpington, near the Park and Ride site. Clearly this will have major traffic generation effects.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Andrew Woodward // 1 thread
It would be useful to provide a route from east side of Kew Gardens station; via Burlington Avenue; along Mortlake Road and up the service road alongside the district line to the Thames Path. The service road is already closed to traffic; but cycling is obstructed by a large ugly concrete barrier (see photo). There is room on the north side of Mortlake Road for a short section of dedicated cycling space to link to the junction with Burlington Ave - see http://goo.gl/maps/DG7gh. The crossing could be problematic.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.