Beehive Centre redevelopment
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Anon // 1 thread
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
Created by Josh Grantham // 1 thread
Demolition of nursery building, part of outbuildings; partial demolition, refurbishment and extension of other existing college buildings and the erection of four accommodation blocks containing 60 rooms for postgraduate students; associated landscaping, car and cycle parking, refuse and other storage and new electricity substation within outbuildings. | Owlstone Croft Owlstone Road Cambridge Cambridgeshire CB3 9JJ
Created by Josh Grantham // 1 thread
Infill of existing carport area and garage conversion to create home office/guest accomodation. | 51A Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Created by Josh Grantham // 2 threads
Residential development containing seven dwellings along with access, car parking, landscaping and associated infrastructure
Created by Josh Grantham // 1 thread
Erection of 3 dwellings following the partial demolition of the existing outbuildings. | 70 Water Street Cambridge Cambridgeshire CB4 1PA
Created by Alice Woods // 0 threads
Following forest trails north from Glentrool leads to a gate with a wayfinder with an arrow pointing directly ahead. The gate ahead is locked shut with a bike lock. Two more gates were locked in this way in the next 400m along the trail, blocking access to the no.7 cycle route from this end of the forest.
Created by Josh Grantham // 1 thread
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
Created by Josh Grantham // 1 thread
Change of use from Guest House to large 12bed House in Multiple Occupation (Sui Generis Use Class)
Created by Josh Grantham // 1 thread
Erection of office building and associated infrastructure and works following demolition of existing buildings and structures
Created by Josh Grantham // 1 thread
22/01995/FUL | Demolition of existing buildings and hardstanding and erection of 70 new homes, car parking, landscaping, bin and bike stores, substation and associated works.
cycle parking provision grouped to 3 areas quite close to the doors. Cycle parking provision needs checking.
Also the site provides several cut throughs, they should be improved and enhanced. Probably worth a deeper look.
Created by Josh Grantham // 1 thread
Application for new property. The design and access state claims compliance with Policy 82 parking standards but no cycle parking has been indicated on the plans.
Created by Josh Grantham // 0 threads
Creation of new property in which the Design and Access statement claims compliance with policy 82. However no cycle parking in indicated on the plan.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Strategy and Resources Committee consists of six councillors who scrutinise the decisions of the Leader/Executive Councillor for Strategy and External Partnerships and the Executive Councillor Finance and Resources.
More Information
Created by Rosamund Humphrey (Admin Officer) // 1 thread
All 42 members of the city council meet formally at least five times a year. Their main responsibilities are setting the budget and policy framework for decision making.
More Information
Created by Matthew // 1 thread
Scout Hut Path is an important link between the Carter Bridge and the Corrie Road neighbourhood. It is narrow and marred by a sharp blind bend in the middle, making it difficult to use for many people especially at night due to personal security and collision concerns.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A developer called Kadans Science Partner is proposing to redevelop the Merlin Place site (currently home to the Taylor Vinters building) as part of the North East Cambridge scheme.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by S Fan // 1 thread
Dropped kerb required due to high pavement
sound+fury // 1 thread
There have been issues with the cycle parking in the past so this need examining again.
Created by Tim Ward // 1 thread
I'm new here, so this has probably been done before, but I haven't sussed out how to find any relevant previous discussion using the search. So sorry if this is repetition.
There are lots of farm roads around Cambridge, some of which have locked gates and "bicycles by written permission only" notices, others are signed as permissive routes, others have no signs but in practice nobody actually shouts at you as you cycle through what turns out to be a farmyard.
Are there any resources that enable us to work out in advance, before discovering the sign and the locked gate, which of these roads are passable by bike, with possibly a rather long route home if the answer is "no"?
Just as an example, how about Battle Gate Road?
Created by Al Storer // 1 thread
A series of temporary obstructions are planned for the Haling Way path
Created by piers // 1 thread
Cars regularly cut across cyclists in the southbound bus/cycle lane.
Created by Matthew // 1 thread
From the county:
In addition to the notification which I sent to you on Monday 11 April 2022 regarding the order to divert part of Longstanton Bridleway 10, I am emailing you to consult you on a proposal to re-surface the northern part of Longstanton Bridleway 10 between the new bridge across the access road to Northstowe and the southern end of the Wilsons Road by Falcon Park.
The proposal to re-surface the northern part of Longstanton Bridleway 10 is related to Condition 59 of Northstowe Phase 2 (S/2011/14/OL) which is subject to submission of details to Greater Cambridge Shared Planning consultation S/2011/14/COND59. In order to achieve a continuous all-weather NMU link between Longstanton, Bar Hill and the new A14 NMU path I am consulting you on what type of surfacing you would like to see on the route (coloured in pink on the attached plan). The route will need to provide an upgraded route that caters for all non-motorised users (walkers, cyclists and horse-riders) all year round.
The southern section of Longstanton Bridleway 10 between the A1307 and the new NMU bridge over the Northstowe access road was surfaced last year and I am interested in whether a similar type of surface would be suitable on the northern section of the bridleway. The northern section of Longstanton Bridleway 10 is generally quite wide and located between tree/hedge lines. I am proposing that any re-surfacing on the northern part of the bridleway follows the principle of providing a 50-50 parallel surface (50% retaining grass/natural surface next to 50% smooth surface suitable for cyclists and pedestrians such as the surface which is in place on the southern part of Longstanton Bridleway 10 or the surface which has just been completed on Reynolds Drove, Rampton north of the busway). Between the boundary features on the northern part of Longstanton Bridleway 10 there is generally at least 5 metres of width available which in theory could accommodate 2.5 metres of natural surface next to 2.5 metres of foot/cycling surface.
The re-surfacing of the bridleway associated with the planning condition is for the developer (Homes England) to deliver, but I am seeking your opinions on what you would like to see in this location which I will then use to inform my feedback to Homes England and Greater Cambridge Planning on the condition which needs to deliver improvements to the northern part of Longstanton Bridleway 10.
I would be much obliged if I could have your comments back on this matter by Friday 29 April 2022.
Created by Stuart Johnson // 1 thread
Military Road, 48 apartments - general comment submitted
Created by Sarah Hughes // 1 thread
I'm writing an article for the next Camcycle magazine on family cycling options with pedalling kids (so FollowMe, Tagalong and tandems/triplets). Could anyone share their experiences of using these?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Shaun McDonald // 1 thread
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by aSemy // 1 thread
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area