Newmarket Road/Elizabeth Way roundabout
This is a large roundabout, with a unsatisfactory underpass, that is in need of a total reconfiguration, ideally involving its removal.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
sound+fury // 1 thread
This is a large roundabout, with a unsatisfactory underpass, that is in need of a total reconfiguration, ideally involving its removal.
sound+fury // 0 threads
The pavement here is narrow. Is there a way of improving the environment for walking and cycling at the same time?
sound+fury // 0 threads
Traffic signals hold up not just vehicles but bike riders too. This should change with consideration given to walkers as well.
Created by Jean Dollimore // 1 thread
Due to the expansion of Euston Station to accommodate HS2. residential parking has been reduced around Euston Station, which has triggered a review of provision in the CA-G CPZ.
sound+fury // 0 threads
Several bikes fly parked in this area, showing that bike racks would be welcome. (Reported originally on Twitter by Alex Raha (@Rahario)
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by Roxanne (CEO) // 1 thread
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/0202/17/OL for the development of 110 dwellings with areas of landscaping and public open space and associated infrastructure works The outline was screened and confirmed not too be EIA development
Land east of Teversham Road, Fulbourn, Cambs
South Cambridgeshire
Application reference : S/3290/19/RM
Created by Roxanne (CEO) // 1 thread
Development of retirement care village in class C2 comprising housing with care, communal health , wellbeing and leisure facilities, public space , landscaping, car parking, access and associated development
Land Rear Of 163 To 187 High Street Bottisham
East Cambridgeshire
Application reference : 20/00296/OUM
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by David Earl // 1 thread
The cycleway has a sever problem with tree-root damage. The largest fault is a sharp triangular profile about 10cm high. This has been reported to CambsCC six times according to their fault reporting, starting two years ago, including one person who came off their bike beacause of it. I reported it in September 2018. Nothing whatsoever has been done about it.
I wrote to my county councillor (John Williams, in whose division this also lies) about the failure to act in January. He did not reply. I have written again today.
Yesterday, I was thrown off my bike by my pedal catching the largest upstand. Fortunately the only damage was a sore knee for a few hours.
I have now made a formal complaint of negligence to the Counmty Council. They have had two years and a report of injury, but have failed to act.
Created by David Earl // 1 thread
The chain-link fencing on the south side of the path on the west ramp off the Tins rail bridge is badly bowed out into the path. This is at face level and could take someone's eye out: it is dangerous.
There was already a report on county HIghways for this, which was dismissed as "landowner responsibility", which may be network rail or may be the chalk pits land. There was no indication in the closed issue whether they had actually informed the landowner, so I reported it again today.
Local Plan for LBRUT is being revised to line up better with Mayor and local policy
Martin Lucas-Smith // 1 thread
This is a hostile roundabout. It has been fiddled around with over the years, to add advisory cycle lanes, lights, pedestrian crossings, etc.
The area needs a fundamental redesign, to replace the roundabout probably with a protected intersection design.
It is outrageous that a health site such as Addenbrooke's has such an unsafe and anti-cycling junction as its main entrance.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Martin Lucas-Smith // 0 threads
Now that the residents' parking scheme is in place, it is clear that there are many more spaces provided than are actually in use.
The amount of space should be slimmed down ASAP.
In particular, the area round the exit from the cut-through from Clifton Road desperately needs to have the parking removed year, to make the visibility much better. A couple of vehicles park there, yet they could easily park 20m away in one of the now empty bays.
Station Road has a bit of cycle lane provision, but it is spotty.
There should be cycle lanes on both sides of the road, the full length.
Taxis should have to queue in the station area car park itself, not 250m away on Station Road.
The streetscape along Riverside was upgraded several years ago at the town end. But it then stops.
It should be completed, all the way to Stourbridge Common.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
Martin Lucas-Smith // 0 threads
Maid's Causeway and the town side of Newmarket Road (until the roundabout) is a mish-mash of a few bits of cycle lane. This is a wide road.
This should be changed to proper cycle tracks. This can be done without moving pavements.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 0 threads
Gonville Place at the Mill Road end needs queue-busting cycle lanes, as per East Road.
As the image shows, there is plenty of space here.
The Hills Road end goes to three lanes so that would be more difficult. The Mill Road end is much easier and can be regarded as a simple 'quick win'.
Martin Lucas-Smith // 0 threads
Like many areas of Petersfield, Ainsworth Street has no cycle parking but there are bikes left along the pavements.
Cycle parking should be provided.
Every night, and during the day, there are always at least some spots of car parking unused. Therefore there is scope to remove a few spaces and install residential cycle parking, as per Thoday Street.
Martin Lucas-Smith // 0 threads
Kingston Street has a major problem with pavement parking.
Bizarrely the yellow line restriction on the east side (nearest the railway) allows parking on that side of the road during certain times, but that is not possible to do without either blocking the road or parking on the pavement.
Current restrictions are Monday-Saturday, 8.30am-5.30pm. This should be double yellow lines (24 hours). That would still permit deliveries.
Created by Jean Dollimore // 1 thread
Camden Council wants to improve the Kentish Town area, including improving air quality and making walking and cycling easier and safer. The area included is shown on the attached map on which we have added blue lines to show the links in the Camden cycle network in this area. See map image with the Issue.
Camden has already been engaging with stakeholders at meetings and with local people via the Commonplace engagement map (see link).
Created by Steven Moseley // 1 thread
This developer [1] has put up this barrier in a shared use path important to local cyclists (c.f. the Campaign's original objections), apparently following complaints that the path was being used as a “cut through” by motor cyclists.
Clearly, this constitutes a real problem for cyclists and wheelchair users.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Andrew Woodward // 1 thread
It would be useful to provide a route from east side of Kew Gardens station; via Burlington Avenue; along Mortlake Road and up the service road alongside the district line to the Thames Path. The service road is already closed to traffic; but cycling is obstructed by a large ugly concrete barrier (see photo). There is room on the north side of Mortlake Road for a short section of dedicated cycling space to link to the junction with Burlington Ave - see http://goo.gl/maps/DG7gh. The crossing could be problematic.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.