21/05423/FUL: new dwelling, land rear of 1 Priory Street
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
Created by Finlay KM // 1 thread
The brook conduit has partially collapsed under the road and the shared-use path. It is currently being repaired (after nearly a year) but the contractors have made use of a very interesting "Cyclists dismount and get an escort" sign. A yellow ramp also makes passing on any non-standard cycle a real challenge. Both of these items are really bad practice and actively discriminate against anyone on a non-standard cycle.
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use of agricultural building to dwellinghouse.
Created by Steven Moseley // 1 thread
Change of Use from Offices to HMO Residential Use
Created by Steven Moseley // 1 thread
Demolition of existing Print Workshop and development of site to provide a replacement print workshop and 5No. residential units with associated vehicle parking and landscaping.
Created by Steven Moseley // 1 thread
Change of use from A1 to C3 to create 4 new 1 bedroom apartments. External repair and decoration. Internal Alternations. Additional Windows and relocation of door to rear elevation. ASHP units to roof top.
Created by Steven Moseley // 1 thread
New Mixed Use Development comprising a convenience store (use Class A1), three flexible use units (Class A1-A5 or Class D1), associated yard and servicing area, parking spaces and landscaping.
Created by catch // 1 thread
New development of 100 homes off the A134 in Horkesley.
https://www.colchester.gov.uk/planning-app-details/?id=442d3ed1-7f61-ec11-8f8f-0022489d9171#ValidationSummaryEntityFormView
Created by Stuart Johnson // 1 thread
Demolition of six retail units part of the Priory Walk Shopping precinct and replacing them with a mixed development of 21 apartments and one retail unit situated on the north side of the junction of Long Wyre Street and Priory Walk.
https://www.colchester.gov.uk/planning-app-details/?id=e10f62af-2c5f-ec11-8f8f-0022489cf2d7
Demolition of a 1960's, 2 storey commercial building on the corner of 14-16 Long Wyre Street and 1-8 Priory Walk and, replacement with 4 storey new building, providing 18 new homes and one commercial unit at ground floor.
https://www.colchester.gov.uk/planning-app-details/?id=1a6462d2-bb5d-ec11-8f8f-0022489cfbff
Conversion and remodelling, including partial demolition, of an existing, Class E, building to form a mixed use development of 37 new,Class C3, self-contained homes and a new Gym Space at Ground Floor.
Created by Michael Robinson // 1 thread
Creating discussion on proposals for Cycleway 9 extension between Brentford and Hounslow town centres.
Hounslow to Brentford walking and cycling changes
We’re proposing to make a series of changes to help people to walk and cycle on Brentford High Street and London Road between Hounslow and Brentford town centres.
We’d like to know your thoughts on our proposals and we are holding a six-week consultation. You can reply by completing our survey, which should take no more than 5-10 minutes to complete.
If you prefer, you can email your comments to haveyoursay@tfl.gov.uk or write to us at FREEPOST TFL HAVE YOUR SAY (Walking and cycling changes between Hounslow and Brentford), no stamp needed.
The closing date for comments is 16 February 2022.
Summary of changes
We’ve described the changes in more detail but in summary we are proposing to make the following changes:
Created by Steven Moseley // 1 thread
Change of use from Sui-Generis (current police station) to residentialcare home (use class C2) Also addition of single front entrance porch/extension
Supplement to housing development application entitled 'Provision of a shared cycleway/footway west onto Ness Road, landscape, drainage, and associated infrastructure of previously approved 15/01175/OUM'
East Cambridgeshire Planning application reference : 21/01771/FUL
Burwell is not in Ely Cycling Campaign's remit but will be important to some Camcycle members.
The proposed infrastructure looks very good in these plans. The Council wouldn't dare require barriers on it because it is intended as a route for emergency vehicles. The rising bollards don't look to be too much of a problem, as long as they can be seen in poor visibility conditions -the plans includes lighting for the route but it might be good for the bollards to include reflective and fluorescent markings.
There already is a dropped kerb at the northwest end of the route (junction with Ness Road).
The plans include the 'Cyclists Dismount' sign for those emerging onto Ness Road.
Created by Steven Moseley // 1 thread
Replacement of bridge and associated highways works involving realignment, junction improvements and width increase of the carriageway.
(CBC version)
Created by Billboyheritagesurvey // 1 thread
The new active travel route is due to open very soon. What needs fixing?
sound+fury // 1 thread
It's a hefty application that will need careful study.
Created by Steven Moseley // 1 thread
Construction of a 3 Bed, Two-Storey, Detached dwelling with garage andassociated parking. Movement of the existing pathway
Created by John Chamberlain // 1 thread
In September 2020, Camden Council put in a segregated southbound cycle track on St Pancras Way under Covid-19 Safe Travel regulations. It was done under an Experimental Traffic Order and they are now consulting on making it permanent or removing it. Details in the attached thread.
Created by Steven Moseley // 1 thread
Convert the existing eight bedsits within an HMO into three separate two-bedroom flats.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cross-party group
Active since 18 May 2021
Westminster is consulting on changes to Maida Hill Market (Harrow Road, Walterton Road). The proposed changes to cycling are limited but it looks from the design that cyclist would lose permeability to Fernhead road.
https://harrowroad.org/assets/Uploads/engagement/211127-Stage-3-Public-Engagement-Boards_MHM.pdf
Created by Steven Moseley // 1 thread
Outline application for 1no. new dwelling.
Created by Steven Moseley // 1 thread
Outline planning application for the development of up to 150 dwellings (including 30% affordable housing) with public open space, landscaping, sustainable drainage system (SuDS) and vehicular access points from Halstead Road and Fiddlers Hill. All ma
Created by Steven Moseley // 1 thread
Demolition of Mercury House and Food @ the Mercury Restaurant; fellingof selected trees; construction of 2-3 storey production block; construction of two-storey extension on northeast corner; infill of porte-cochere to provide internal ground floor acc
Created by catch // 1 thread
Objection to development of land west of Lakelands, off Church Lane / Western Bypass
Response here: https://www.ensembling.com/270062
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by Andrew Woodward // 1 thread
The bridge between Dean Rd and Longford Close is currently a pedestrian only bridge, marked no cycling. Coupled with other improvements, provision of a decent facility here that could be used by cyclists with minimal conflict with pedestrians would open up a decent quiet route from the schools in Hampton (Hampton Academy, Hampton Boys, LEH) to the A316 cycle route.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...