23/04840/FUL ew office building off Maids Causeway
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Josh Grantham // 1 thread
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
Created by KW // 1 thread
23/04936/FUL | Full planning application for the construction of 91 new homes with associated infrastructure, internal roads, open space as part of phase 3 within the Marleigh development as a modification to outline permission S/2682/13/OL to increase the overall unit numbers across the site to 1,391 homes. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by KW // 1 thread
23/04930/REM | Reserved matters application detailing, appearance, landscaping, layout and scale for the construction of 332 new homes and commercial space with associated infrastructure, internal roads, open space as part of phase 3 pursuant to condition 5 (reserved matter) of outline permission S/2682/13/OL dated 30 November 2016. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by Gregory Williams // 1 thread
A tree has fallen blocking NCR1 at Duke's Meadow. In the meantime it is still possible to cut across the grass to continue the route.
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Edward Bainton // 1 thread
Crossing from Bright Street to Geneva Street, the cycle lights do not sense the bike. You can sit through 10 phases and you never get a green light.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Campbell Mccaig // 1 thread
A real lack of strimming too making some paths nearly unuseable.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
Created by Gregory Williams // 1 thread
The River Dour Greenway sign pointing into Lorne Road from the shared path beside Buckland Avenue is missing. Previous Google StreetView imagery shows the sign which has gone missing:
Created by Gregory Williams // 1 thread
Bollards on the path used by the River Dour Greenway between Alfred Road and Brookfield Place limit access for people with trailers or on tandems.
Created by Martin Wheatley // 1 thread
Absolutely disgraceful deposit of mud by tractor drivers hauling harvested beets on Fen Lane (the back way to the north of Swaffham Bulbeck which many of us use to bypass the unpleasant B1102 through the village). In my opinion it is not currently safely passable on a bike. I was on foot, in wellingtons, and found it hard to stay upright. The number of tractors and the aggressive speed at which they are being driven is an additional hazard. Until this is cleared up, the options are the main road through the village, or (somewhat longer but much less busy), divert via High Street, Quarry Lane and Heath Road back on to the B1102 and the Greenway to Swaffham Prior north of the village.
Created by Gregory Williams // 3 threads
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
Created by Gregory Williams // 1 thread
There is a comparatively new shared path linking Burgess Road to Alyesham's station. However the Burgess Road end of the shared path doesn't have a dropped kerb to allow a transition between road and path and vice-versa.
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
Created by Gregory Williams // 1 thread
The sign towards the Town Centre is missing. Previous view of the sign here:
Created by Gregory Williams // 1 thread
The sign pointing into Alfred Road at Lorne Road is missing.
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Street Light FCND004 on Falala Way (NCN1) - Not Working Fault Number: 750068
Created by Owaldron // 1 thread
See Picture, Reported to CCC. However, I have a hunch that it may be the responsibility of 'LandMarc' on behalf of the MOD as I think they would own that land.
Created by Gregory Williams // 1 thread
A better cycle connection is needed to Rough Common, avoiding the need to use the A290 Whitstable Road or A2050 and Palmars Cross Hill.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by John Shead // 1 thread
When busy, crossing this junction is hazardous when negotiating with northbound vehicles at speeds of up to 40mph.
No indication is provided to motorists that there will be conflict.
A speed table with dragons teeth markings needs to be installed.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en