West Yorkshire combined authority are consulting on improvements to cycling and walking links in Pudsey with the aim of improving access to New Pudsey station
Anon // 1 thread
Borough Road - Healthy Streets
Closes 4 Nov 2019
Opened 8 Oct 2019
Contact
Joanna Lesak
(Project Manager)
Overview
We would like to know your views on proposals for Borough Road. We are proposing improvements to the environment to encourage cycling and walking in line with the Healthy Streets approach. Borough Road is part of London's wider strategic cycle network as well as the council's Southwark Spine route, and together with Harper Road links Cycleway 6 at St George's Circus to Cycleway 17 at Falmouth Road creating a strategic east-west route.
The key measures proposed are
Please respond to the online questionnaire below by 4 November 2019.
Background
In 2014 over 1400 people in Southwark were consulted by the council on cycling, and the proposed Southwark Spine cycle route was a key feature of the proposals, linking the north and south of the borough. The 2015 cycle strategy subsequently identified the Southwark Spine as a key deliverable to offer a direct, safe, attractive, comfortable and easy cycle route, for all ages and abilities.
Borough Road and Harper Road comprise the northern section of the Southwark Spine. Street improvements in Harper Road between the junction with Borough Road and Falmouth Road have been consulted on separately to link in with the proposed refurbishment of Dickens Square Park; a link to the informal consultation and updates on timescales of projects in the area are provided in www.southwark.gov.uk/harperroad.
Why We Are Consulting
We have identified a number of issues with the current road layouts that make Borough Road and Harper Road feel unsafe and intimidating for vulnerable road users, particularly cyclists, and that affect bus journey times.
Our proposals
We would like your views on the following proposals which aim to reduce these issues.
The proposals improve Healthy Street indicators including making it easier to cross the road, improving the environment for pedestrians from all walks of life, helping people feel relaxed and safe, and encouraging people to walk, cycle and use public transport. The results of the draft Healthy Streets check (subject to change) are shown in the spider graph below
Well used, but narrow, path.
Downhill section owned by FC, rest Forth Ports.
Before the railway came the Lammerlaws (Lamberlaws on some maps) stretched inland almost as far as the Parish Church.
Now it’s mostly thought of as the name for the ‘wild’ bit of the peninsula at the of Lammerlaws Road.
The Community Council produced an improvement plan for the area in 2018.
http://www.burntislandcc.org.uk/Index.asp?MainID=25915
The ambition has since been scaled back.
https://burgh.buzz/2019/09/17/burntisland-small-improvements-planned-for-the-lammerlaws/
The area is part of an SSSI so any work requires permission from SNH. It is expected to be given.
Created by chdot // 1 thread
WW2 pillbox
Has survived for 80 years and has recently attracted a small amount of vandalism
http://burgh.buzz/2019/09/04/vandalism-on-the-lammerlaws/
Needs a plan for conservation/interpretation
Presumed to be owned by FC
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Anon // 1 thread
Overview
Give us your views on proposals to introduce a new section of bus lane on Croxted Road.
We want to improve bus journey times along Croxted Road, as it has been identified that buses experience delays along this section, in particular just south of the junction with the A205 South Circular Road - northbound buses are sometimes unable to access the bus stop due to a combination of queuing traffic and parked vehicles upstream of the bus.
In order to support this, we are proposing to introduce a short length of northbound peak only bus lane installed between the junction of Ling’s Coppice and the bus stop south of the A205 South Circular Road (Stop WS). The bus lane will operate from 7am-7pm Monday to Saturday and would require introduction of new kerbside restrictions of no waiting and no loading to match the operational hours of the bus lane i.e 7am to 7pm Monday to Saturday. To support these changes on the western kerbline, it is also proposed to introduce no waiting/no loading restrictions on the eastern kerbline during bus lane hours.
These proposals should improve journey times for passengers using the route 3, which is a high frequency service between Crystal Palace and Trafalgar Square. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.
We would appreciate your views on these plans, and whether there are any issues that we should take note of.
Why We Are Consulting
We would be grateful if you could take the time to review the proposal attached below and let us know what you think using the online questionnaire.
Your views are really important to help us make sure the final design meets the needs of the local community.
Concern at September Community Council about need for barrier to discourage young people from running into the road on way to Music Hall.
19/1212/FUL | Demolition of the existing octagonal building and erection of two new student accommodation buildings comprising 23 rooms. Replacement of existing gardeners accommodation with free-standing gardeners' building, replacement of cycle storage, new boundary and entrance treatment. | St Chads 48 Grange Road Cambridge Cambridgeshire CB3 9DH
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
As part of the City Council's plan to build 500 new homes in Cambridge by 2022, Cambridge Investment Partnership (CIP) is proposing to build around 78 new council-rented homes and a new community facility on Campkin Road.
Tom McKeown // 1 thread
Planning for a direct action to close Station Road.
Created by JonC // 1 thread
The Countryside Management Service is currently developing a Greenspace Action Plan for the Ayot Greenway. Attached (see thread) is the briefing document which explains more about the community engagement and plan production process. This briefing document is being sent to relevant local stakeholders. There will be further engagement on a draft plan during January and February 2020.
We would welcome any comments you may have on the objectives proposed, or your thoughts on the future management of the Ayot Greenway. Should you have any questions, or if you would like to meet to discuss the plan, please get in touch with me using the contact details below.
Rhiannon Barton, Trainee Land Management Projects Officer
Countryside and Rights of Way, Environment and Infrastructure Department
Hertfordshire County Council I County Hall I Pegs Lane, Hertford I SG13 8DN I Postal Point: CHN101
( 01992 555173 (Comnet 25173) Email: Rhiannon.Barton@hertfordshire.gov.uk
Created by Paula Downes // 4 threads
The road is unloved, has very few trees, has a lot of traffic, moving fast or jammed. Air quality is poor. Cyclists cycle along the pavement very fast which is dangerous for pedestrians. The cycle lanes on the road are not safe. It is difficult for cyclists to cross the road since there are not enough crossings. A lot of people park near Coldhams Common on Saturdays. Many people have created driveways to avoid people parking in front of their houses in the parking bays. Crossing the little roads (Brampton, Vinery Road, Vinery Way) is difficult because the cars block the path as they wait to get onto Coldhams Lane and greenery prevents pedestrians from going behind those cars.
Outline application (all matters reserved except for means of access in respect of junction arrangements onto Worts' Causeway and Babraham Road) for erection of up to 230 residential dwellings (including affordable housing), community facilities within Use Classes A1/A2/A3/A4/B1/D1/D2, new landscaping and public realm, car and cycle parking, infrastructure, other associated works following the demolition of all existing buildings on the site.
Created by Sylvia Gauthereau // 1 thread
Brent Council:
Overview
We are proposing to pedestrianise part of Oaklands Road (between Oaklands Passage and Cricklewood Broadway) and create a Liveable Street by removing general traffic and improving the urban realm.
Why We Are Consulting
The proposed scheme aims to create a new, high quality, calm and interactive community space in the heart of Cricklewood. This supports the Council’s commitment to improving our town centre environments, encouraging walking and cycling and improving air quality. It will also establish a less congested environment for the long-standing fruit and vegetable stall and an accessible and safe route for pedestrians, cyclists and people with mobility difficulties.
Created by Hounslow Cycling Campaign // 1 thread
The Liveable Neighbourhoods project in south Chiswick combines a range of schemes across the Grove Park and Dukes Meadows area that focus on increasing the number of trips made by foot, bike and public transport while improving local public space.
Hounslow Council has secured funding through Transport for London’s Liveable Neighbourhood programme to progress this project. Certain elements of the project are well defined, such as the proposed pedestrian bridge under Barnes Bridge and a new public square in Grove Park near to Chiswick Station. Alongside this there are also broader aims to provide improved walking and cycling links across the area while also looking to address well known issues of excessive traffic volumes and speeds in residential areas, which are often used as cut-through to access major roads.
Richard G // 1 thread
Default traffic light phase is for red on the vastly more used busway/cyclepath, rather than for the infrequent crossings of Hobson Avenue.
How to go about changing it
Created by Roxanne (CEO) // 1 thread
GCP project:
Junction 11 of the M11 is a key entry point into Cambridge. With significant growth in housing and employment in the area, upgrading the existing transport infrastructure in this area is vital to reduce congestion and improve access into the city.
Congestion impacts on current bus journey times making journeys unreliable, unattractive and longer than necessary, as well as affecting the convenience and comfort of cycling trips on the corridor.
By expanding the existing Travel Hub in Trumpington and creating more Travel Hub provision (either by creating multi-storey parking at the Trumpington site or a new Travel Hub to the west of Junction 11), car drivers can be encouraged to complete their journeys by bus. More Travel Hub use would help the flow of traffic and make employment sites such as the Cambridge Biomedical Campus, West and North Cambridge easier to reach.
A consultation on increasing Travel Hub spaces to the south west of Cambridge ran until 21 December 2018. Thank you to those who attended our events and responded to the consultation. We will now collate the responses and publish a report in the Spring of 2019.
The Cambridge South West Travel Hub Project is a component of the West of Cambridge package, which includes review and development options for Travel Hub facilities, creation of new Travel Hub locations, and enhancement or upgrade of existing facilities.
Created by Jean Dollimore // 1 thread
Camden is consulting on a proposed Healthy School Street zone around the following schools:
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Simon Munk // 1 thread
From Hackney council:
Help us improve cycling on Queensbridge Road between Hackney Road and Whiston Road
We are seeking your views on proposals that will create a protected cycling route along Queensbridge Road to form part of a network of safe cycling routes between the Quietway link at Whiston Road and Quietway 13 at Columbia Road.
Hackney Council is working in partnership with Tower Hamlets and Transport for London (TfL) to make cycle accessibility improvements on Queensbridge Road from Hackney Road to Dalston Lane as part of the Central London Cycle Grid (CLCG) from Bethnal Green to Dalston Lane. The improvements at Queensbridge Road are being developed in three sections:
Hackney, Tower Hamlets, and TfL are committed to making our streets safer for everyone. These changes aim to encourage more walking and cycling, improve air quality and reduce emissions within the local area. Hackney and Tower Hamlets recognise that streets are not just places to park vehicles or drive, but to walk and cycle on too. They are the places where we socialise and live our lives. An aspiration of both boroughs is to reclaim streets from motor traffic and congestion and transform them into attractive and liveable neighbourhoods.
Queensbridge Road is one such street. Although it is a relatively wide road (about 10.5 metres wide), it was designed for the rapid transit of motorised vehicles and parking. The traffic islands and hatched road markings leave little room for other road users such as pedal cyclists and pedestrians. Between Hackney Road and Whiston Road, 28 collisions were recorded between 2013 and 2017. Sixteen of them involved pedal cyclists.
The proposed improvements would change the nature of Queensbridge Road to make it a healthier, safer and more pleasant environment for walking and cycling, reflecting the needs of the local area, including its residential estates, Haggerston Park and Haggerston School.
What are the proposals?
The following measures are proposed:
Queensbridge Road raised cycle tracks
Dunloe Street shared zebra crossing
Hackney Road junction improvements
Kent Street raised entry table and zebra crossing
Refurbishment of pavements and carriageways
Whiston Road junction
Please download the plans below for more details
Layout plans from Hackney Road to Whiston Road
Layout plans from Hackney Road to Whiston Road
Detail 1: Dunloe Street junction
Detail 2: Hackney Road junction
What are the potential impacts of the proposals?
Parking
Future schemes
The rest of the cycle grid to the north of Whiston Road will be consulted on and developed as follows:
What happens next?
Your views will be taken into account as part of the detailed design process. We will publish the consultation responses as well as the decisions made at consultations.hackney.gov.uk
To keep up to date with this and other plans, please visit hackney.gov.uk/street-consultations
Permanent works
If the scheme goes ahead, following consultation, we expect construction works to start in January 2020.
Frequently Asked Questions
Q. What is a raised cycle track? Can pedestrians and motorised traffic use the cycle track?
A. A raised cycle track is a section of highway where pedal cyclists have right of way. It is vertically separated from motorised traffic by a kerb and from pedestrians by a raised pedestrian/cycle separator.
Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?
A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings.
Q. What are blended pedestrian crossings and will traffic give way to pedestrians at them?
A. Blended crossings are pedestrian crossing points designed to slow down vehicles when entering or exiting side roads, encouraging vehicles to give way to pedestrians crossing the road.
Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?
A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings
Created by Edward Leigh // 1 thread
We know we need thousands more cycle parking spaces in future to meet ambitions to reduce car trips into the city and cope with the huge population and employment growth that the region is already committed to in its Local Plans. There is very little highway space available in the city centre, so we need to re-purpose other spaces, such as multi-storey car parks. I want to see if we can develop a policy to put to the City Council that they could act on. We've been discussing locations for new cycle parks for years (see linked Camcycle article), so what's the hold-up?
Created by Jean Dollimore // 1 thread
Camley Street Neighbourhood Forum proposes a neighbourhood plan for the area shown in the image with this issue
Demolition of existing building and construction of 3no two storey dwellings, with additional living accommodation in the roof of each, and 1no 2 storey detached dwelling, with private access drives to the front and rear, amenity space and landscaping.
https://idox.cambridge.gov.uk/online-applications/simpleSearchResults.do?action=firstPage
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Harry Wood // 1 thread
I cycle southwards down Sussex Way each morning, and the logical thing to do is continue down Hornsey Road. Even better would be if this could somehow join onto the nicely cycle provisioned route down Arnette Road. Would make a logical route southwards, but short of bulldozing some shops, I'm not sure how it could be made to join up better.
So anyway I go down Hornsey Road, but the weird thing is I'm not allowed to turn right from Severn Sisters Rd to Horsey Road. It's weird because there's a little strip of cycle lane on Severn Sisters Road leading into this junction, which would very much imply that the highway planners are expecting cyclists to do this. Maybe there should be a blue 'except cyclists' sign there.... except that cyclists need to avoid running over the pedestrians who are crossing at that time in the traffic light sequence.
I'm actually not sure what can be done to improve this. Maybe someone else can think of something.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Shaun McDonald // 2 threads
The cycle parking outside the Sainsburys is damaged, some stands are bent, others are missing.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout