Beehive Centre redevelopment
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Anon // 1 thread
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
Created by Josh Grantham // 1 thread
Demolition of nursery building, part of outbuildings; partial demolition, refurbishment and extension of other existing college buildings and the erection of four accommodation blocks containing 60 rooms for postgraduate students; associated landscaping, car and cycle parking, refuse and other storage and new electricity substation within outbuildings. | Owlstone Croft Owlstone Road Cambridge Cambridgeshire CB3 9JJ
Created by Josh Grantham // 1 thread
Infill of existing carport area and garage conversion to create home office/guest accomodation. | 51A Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Created by Josh Grantham // 2 threads
Residential development containing seven dwellings along with access, car parking, landscaping and associated infrastructure
Created by Josh Grantham // 1 thread
Erection of 3 dwellings following the partial demolition of the existing outbuildings. | 70 Water Street Cambridge Cambridgeshire CB4 1PA
Created by Alice Woods // 0 threads
Following forest trails north from Glentrool leads to a gate with a wayfinder with an arrow pointing directly ahead. The gate ahead is locked shut with a bike lock. Two more gates were locked in this way in the next 400m along the trail, blocking access to the no.7 cycle route from this end of the forest.
Created by Josh Grantham // 1 thread
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
Created by Josh Grantham // 1 thread
Change of use from Guest House to large 12bed House in Multiple Occupation (Sui Generis Use Class)
Created by Josh Grantham // 1 thread
Erection of office building and associated infrastructure and works following demolition of existing buildings and structures
Created by Josh Grantham // 1 thread
22/01995/FUL | Demolition of existing buildings and hardstanding and erection of 70 new homes, car parking, landscaping, bin and bike stores, substation and associated works.
cycle parking provision grouped to 3 areas quite close to the doors. Cycle parking provision needs checking.
Also the site provides several cut throughs, they should be improved and enhanced. Probably worth a deeper look.
Created by Josh Grantham // 1 thread
Application for new property. The design and access state claims compliance with Policy 82 parking standards but no cycle parking has been indicated on the plans.
Created by Josh Grantham // 0 threads
Creation of new property in which the Design and Access statement claims compliance with policy 82. However no cycle parking in indicated on the plan.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Strategy and Resources Committee consists of six councillors who scrutinise the decisions of the Leader/Executive Councillor for Strategy and External Partnerships and the Executive Councillor Finance and Resources.
More Information
Created by Rosamund Humphrey (Admin Officer) // 1 thread
All 42 members of the city council meet formally at least five times a year. Their main responsibilities are setting the budget and policy framework for decision making.
More Information
Created by Matthew // 1 thread
Scout Hut Path is an important link between the Carter Bridge and the Corrie Road neighbourhood. It is narrow and marred by a sharp blind bend in the middle, making it difficult to use for many people especially at night due to personal security and collision concerns.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A developer called Kadans Science Partner is proposing to redevelop the Merlin Place site (currently home to the Taylor Vinters building) as part of the North East Cambridge scheme.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by S Fan // 1 thread
Dropped kerb required due to high pavement
sound+fury // 1 thread
There have been issues with the cycle parking in the past so this need examining again.
Created by Tim Ward // 1 thread
I'm new here, so this has probably been done before, but I haven't sussed out how to find any relevant previous discussion using the search. So sorry if this is repetition.
There are lots of farm roads around Cambridge, some of which have locked gates and "bicycles by written permission only" notices, others are signed as permissive routes, others have no signs but in practice nobody actually shouts at you as you cycle through what turns out to be a farmyard.
Are there any resources that enable us to work out in advance, before discovering the sign and the locked gate, which of these roads are passable by bike, with possibly a rather long route home if the answer is "no"?
Just as an example, how about Battle Gate Road?
Created by Al Storer // 1 thread
A series of temporary obstructions are planned for the Haling Way path
Created by piers // 1 thread
Cars regularly cut across cyclists in the southbound bus/cycle lane.
Created by Matthew // 1 thread
From the county:
In addition to the notification which I sent to you on Monday 11 April 2022 regarding the order to divert part of Longstanton Bridleway 10, I am emailing you to consult you on a proposal to re-surface the northern part of Longstanton Bridleway 10 between the new bridge across the access road to Northstowe and the southern end of the Wilsons Road by Falcon Park.
The proposal to re-surface the northern part of Longstanton Bridleway 10 is related to Condition 59 of Northstowe Phase 2 (S/2011/14/OL) which is subject to submission of details to Greater Cambridge Shared Planning consultation S/2011/14/COND59. In order to achieve a continuous all-weather NMU link between Longstanton, Bar Hill and the new A14 NMU path I am consulting you on what type of surfacing you would like to see on the route (coloured in pink on the attached plan). The route will need to provide an upgraded route that caters for all non-motorised users (walkers, cyclists and horse-riders) all year round.
The southern section of Longstanton Bridleway 10 between the A1307 and the new NMU bridge over the Northstowe access road was surfaced last year and I am interested in whether a similar type of surface would be suitable on the northern section of the bridleway. The northern section of Longstanton Bridleway 10 is generally quite wide and located between tree/hedge lines. I am proposing that any re-surfacing on the northern part of the bridleway follows the principle of providing a 50-50 parallel surface (50% retaining grass/natural surface next to 50% smooth surface suitable for cyclists and pedestrians such as the surface which is in place on the southern part of Longstanton Bridleway 10 or the surface which has just been completed on Reynolds Drove, Rampton north of the busway). Between the boundary features on the northern part of Longstanton Bridleway 10 there is generally at least 5 metres of width available which in theory could accommodate 2.5 metres of natural surface next to 2.5 metres of foot/cycling surface.
The re-surfacing of the bridleway associated with the planning condition is for the developer (Homes England) to deliver, but I am seeking your opinions on what you would like to see in this location which I will then use to inform my feedback to Homes England and Greater Cambridge Planning on the condition which needs to deliver improvements to the northern part of Longstanton Bridleway 10.
I would be much obliged if I could have your comments back on this matter by Friday 29 April 2022.
Created by Stuart Johnson // 1 thread
Military Road, 48 apartments - general comment submitted
Created by Sarah Hughes // 1 thread
I'm writing an article for the next Camcycle magazine on family cycling options with pedalling kids (so FollowMe, Tagalong and tandems/triplets). Could anyone share their experiences of using these?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Created by Sam Saunders // 0 threads
A twenty metre stretch of advisory cycle lane at the end of Whiteladies Road, from a zebra crossing to its junction with Queens Road, encourages cyclists to take a position near to the curb as they enter the and leave the junction. This puts them exposed to frequent buses turning immediately left into Queens Avenue and in a vulnerable position from which to continue a journey south west towards Park Street or Park Row.
Created by Paul L // 1 thread
This path is included in the Richmond Cycle Map and leads to a toucan and is a useful link from Hampton to the quietish Lower Hampton Rd towards Sunbury but is marked "No Cycling".
There is little pedestrian traffic but ideally it could be made wider.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by MB // 1 thread
TFL are thinkingof closing this 'rat run' to motor vehicles & have put out a consultation here:
https://consultations.tfl.gov.uk/streets/coleparkroad
They are keeping it open to cyclists - but are proposing (I think) an awkward right- angled turn for cyclists to get in & out of the cul-de-sac. Can we suggest a better layout?
Consultation closes on May 10th 2013
Created by Sam Saunders // 1 thread
Vauxhall Bridge between Coronation Road and Cumberland Road has a channel provided for wheeling bicycles on one side of its stepped sections. The channel is so narrow and so close to the railings that a bike can only be wheeled along it at a severe tilt. In addition only one side has a channel so wheeling the bike in the opposite direction has to be done from the wrong side of the bike, making it even more awkward.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Sam Saunders // 1 thread
The unusual arrangement at the beginning of this cycle lane in Dighton Street Bristol might lead some road users to take it lightly. It could be that experience of moving or replacing trees with less destructive varieties in suitable containers should be sought from other places. Dighton Street is part of a well-used natural route from east to west near the city centre and efforts to establish serious, continuous and high quality cycle routes on roads like this one could represent very good value for money. Mandatory cycle lanes, once installed, need to be policed.
Created by MB // 1 thread
There is a useful but unmarked path from Queen's Road to Richmond Park and through to Sheen. It is used by pedestrians and cyclists & I have never seen it on any map! From Lower Grove Road, it takes you to the park via Bog Gate, or Sheen via Sheen Common.
If it were better marked on maps, better maintained & wider in places, it could form a useful section of Richmond's (paved, segregated, Dutch style?) cycling network.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Paul L // 0 threads
longer than Kew Rd and any traffic can be obstructive in narrow roads.
Toucan crossings of A316, Kew Road and Mortlake Rd.
Is rat running a problem ?
Created by Sam Saunders // 1 thread
Cycling North along Westbury Road (A4018) on a shared-use pathway beside the main carriageway there is a sign to "Westbury Park Shops". It is about 50 yards before the Parry's Lane roundabout and indicates a right turn ahead for cyclists and pedestrians. It has been added to a larger sign that reads "New Road Layout".
In practice, on arrival at the roundabout there is no indication before, on or after the roundabout as to where cyclists should go next. A zebra crossing before the roundabout offers a dismounted route to the other side of the road, but there is no indication of which direction to take thereafter. There are 4 roads to chose from, Westbury Park, Etloe Road, North View and Downs Park West but none of them seem to offer shops. There are two ambiguous cycle lane markings on the entrance to Westbury Park and "NO CYCLING" is painted on one footpath.
The problem, in a nutshell, is one that recurs all over Bristol: if you don't already know the way a first encouraging sign gives expectations that are not followed through. A route that had been indicated as a cycle route (with the cycle symbol) at its origin is left to chance and guesswork. The effect on cycling is to increase uncertainty and unpredictability. Each cyclist is obliged to make guesses about how to use a junction or follow a route. An association of cycling with expert and arcane knowledge is reinforced. Many routes (including this one) could be improved with a few additional signs or road markings and their use by casual or less well-informed cyclists could be encouraged.
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?