Beehive Centre redevelopment
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Anon // 1 thread
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
Created by Josh Grantham // 1 thread
Demolition of nursery building, part of outbuildings; partial demolition, refurbishment and extension of other existing college buildings and the erection of four accommodation blocks containing 60 rooms for postgraduate students; associated landscaping, car and cycle parking, refuse and other storage and new electricity substation within outbuildings. | Owlstone Croft Owlstone Road Cambridge Cambridgeshire CB3 9JJ
Created by Josh Grantham // 1 thread
Infill of existing carport area and garage conversion to create home office/guest accomodation. | 51A Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Created by Josh Grantham // 2 threads
Residential development containing seven dwellings along with access, car parking, landscaping and associated infrastructure
Created by Josh Grantham // 1 thread
Erection of 3 dwellings following the partial demolition of the existing outbuildings. | 70 Water Street Cambridge Cambridgeshire CB4 1PA
Created by Alice Woods // 0 threads
Following forest trails north from Glentrool leads to a gate with a wayfinder with an arrow pointing directly ahead. The gate ahead is locked shut with a bike lock. Two more gates were locked in this way in the next 400m along the trail, blocking access to the no.7 cycle route from this end of the forest.
Created by Josh Grantham // 1 thread
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
Created by Josh Grantham // 1 thread
Change of use from Guest House to large 12bed House in Multiple Occupation (Sui Generis Use Class)
Created by Josh Grantham // 1 thread
Erection of office building and associated infrastructure and works following demolition of existing buildings and structures
Created by Josh Grantham // 1 thread
22/01995/FUL | Demolition of existing buildings and hardstanding and erection of 70 new homes, car parking, landscaping, bin and bike stores, substation and associated works.
cycle parking provision grouped to 3 areas quite close to the doors. Cycle parking provision needs checking.
Also the site provides several cut throughs, they should be improved and enhanced. Probably worth a deeper look.
Created by Josh Grantham // 1 thread
Application for new property. The design and access state claims compliance with Policy 82 parking standards but no cycle parking has been indicated on the plans.
Created by Josh Grantham // 0 threads
Creation of new property in which the Design and Access statement claims compliance with policy 82. However no cycle parking in indicated on the plan.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Strategy and Resources Committee consists of six councillors who scrutinise the decisions of the Leader/Executive Councillor for Strategy and External Partnerships and the Executive Councillor Finance and Resources.
More Information
Created by Rosamund Humphrey (Admin Officer) // 1 thread
All 42 members of the city council meet formally at least five times a year. Their main responsibilities are setting the budget and policy framework for decision making.
More Information
Created by Matthew // 1 thread
Scout Hut Path is an important link between the Carter Bridge and the Corrie Road neighbourhood. It is narrow and marred by a sharp blind bend in the middle, making it difficult to use for many people especially at night due to personal security and collision concerns.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A developer called Kadans Science Partner is proposing to redevelop the Merlin Place site (currently home to the Taylor Vinters building) as part of the North East Cambridge scheme.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by S Fan // 1 thread
Dropped kerb required due to high pavement
sound+fury // 1 thread
There have been issues with the cycle parking in the past so this need examining again.
Created by Tim Ward // 1 thread
I'm new here, so this has probably been done before, but I haven't sussed out how to find any relevant previous discussion using the search. So sorry if this is repetition.
There are lots of farm roads around Cambridge, some of which have locked gates and "bicycles by written permission only" notices, others are signed as permissive routes, others have no signs but in practice nobody actually shouts at you as you cycle through what turns out to be a farmyard.
Are there any resources that enable us to work out in advance, before discovering the sign and the locked gate, which of these roads are passable by bike, with possibly a rather long route home if the answer is "no"?
Just as an example, how about Battle Gate Road?
Created by Al Storer // 1 thread
A series of temporary obstructions are planned for the Haling Way path
Created by piers // 1 thread
Cars regularly cut across cyclists in the southbound bus/cycle lane.
Created by Matthew // 1 thread
From the county:
In addition to the notification which I sent to you on Monday 11 April 2022 regarding the order to divert part of Longstanton Bridleway 10, I am emailing you to consult you on a proposal to re-surface the northern part of Longstanton Bridleway 10 between the new bridge across the access road to Northstowe and the southern end of the Wilsons Road by Falcon Park.
The proposal to re-surface the northern part of Longstanton Bridleway 10 is related to Condition 59 of Northstowe Phase 2 (S/2011/14/OL) which is subject to submission of details to Greater Cambridge Shared Planning consultation S/2011/14/COND59. In order to achieve a continuous all-weather NMU link between Longstanton, Bar Hill and the new A14 NMU path I am consulting you on what type of surfacing you would like to see on the route (coloured in pink on the attached plan). The route will need to provide an upgraded route that caters for all non-motorised users (walkers, cyclists and horse-riders) all year round.
The southern section of Longstanton Bridleway 10 between the A1307 and the new NMU bridge over the Northstowe access road was surfaced last year and I am interested in whether a similar type of surface would be suitable on the northern section of the bridleway. The northern section of Longstanton Bridleway 10 is generally quite wide and located between tree/hedge lines. I am proposing that any re-surfacing on the northern part of the bridleway follows the principle of providing a 50-50 parallel surface (50% retaining grass/natural surface next to 50% smooth surface suitable for cyclists and pedestrians such as the surface which is in place on the southern part of Longstanton Bridleway 10 or the surface which has just been completed on Reynolds Drove, Rampton north of the busway). Between the boundary features on the northern part of Longstanton Bridleway 10 there is generally at least 5 metres of width available which in theory could accommodate 2.5 metres of natural surface next to 2.5 metres of foot/cycling surface.
The re-surfacing of the bridleway associated with the planning condition is for the developer (Homes England) to deliver, but I am seeking your opinions on what you would like to see in this location which I will then use to inform my feedback to Homes England and Greater Cambridge Planning on the condition which needs to deliver improvements to the northern part of Longstanton Bridleway 10.
I would be much obliged if I could have your comments back on this matter by Friday 29 April 2022.
Created by Stuart Johnson // 1 thread
Military Road, 48 apartments - general comment submitted
Created by Sarah Hughes // 1 thread
I'm writing an article for the next Camcycle magazine on family cycling options with pedalling kids (so FollowMe, Tagalong and tandems/triplets). Could anyone share their experiences of using these?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.