International Cycling Safety Conference 2012, Helmond (NL)
International Cycling Safety Conference 2012, 7 Nov
Location: Helmond, The Netherlands
Costs: 150 Euro
Twitter hashtag: #safecycling2012
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by velocipedus@gmail.com // 1 thread
International Cycling Safety Conference 2012, 7 Nov
Location: Helmond, The Netherlands
Costs: 150 Euro
Twitter hashtag: #safecycling2012
This is a segregated off road path.
The plants along the marked section of the Penistone Road cycle path restrict the width of the path considerably and make it impossible for 2 cyclists to pass each other keeping in the cycle lane and forcing cyclists to take to the pedestrian half of the path.
There are also plants overhanging the pedestrian side which make pedestrians walk along the cycle half causing conflict.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by velocipedus@gmail.com // 0 threads
Proposal for a Business Improvement District which would replace (?) "Love Cambridge". http://www.cbbid.co.uk/
Proposal is all about safety, cleanliness, city ambassadors, ultimately revenue
Beverly Carpenter from millroadsociety.org has a very spirited and serious response in the local paper
http://www.cambridge-news.co.uk/Home/Bidding-to-make-the-most-from-city-12092012.htm (does not include the "threat to diversity" argument present in the print version)
She calls it an attempt to privatise public space, privatise policing, (BID's don't honor Freedom of information requests) and turning the city centre into a shopping centre
I have seen these BIDs working in other places: ambassadors whizzing around on strange wheeled things, trying to enforce "no cycling" rules, but also a large budget which funded an annual festival.
The proposal has no language about car parking this is a topic that needs to be very closely watched from the bicycle saddle.
Created by Robin Heydon // 1 thread
What if we could create a standardised method of assessing cycling infrastructure, either proposed by developers or existing?
Northstowe used something called the "IHT Cycle Audit Guidelines" that appear to be from 1996. Perhaps something better can be done that follows a more continental approach?
Thoughts? Opinions?
Martin Lucas-Smith // 1 thread
This is a proposal for a link joining the Guided Busway cycleway and Hills Road bridge.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Several meetings, in each area committee location to discuss s106 money and how it should be spent. Details below.
http://www.cambridge.gov.uk/ccm/content/planning-and-building-control/developer-contributions.en
On a bi-annual basis, the funding for S106 projects is to be reviewed with Area Committee recommendations going to Cabinet for final approval.
This is a change of use application to turn Mickey Flynns from a snooker hall to shops, financial services and a café.
Created by Richard Moss // 1 thread
Planning application for 5 retail units - cycle parking required.
Created by cobweb // 1 thread
Change of use for the former Joshua Taylor building to provide 12 residential units over three floors.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Jim Chisholm // 1 thread
The possibility of a new cycle/walking route from Whittlesford station in part using funds from proposed adjacent development (Relocation of Welches transport depot from Stapleford/Shelford
The platform which is c 264m long extends beneath A505 overbridge.
Longest trains are 240m (12 coaches). This route was investigated some 10 years ago.
Greater Anglia say a route is not possible. I regard this as a stuck rather than locked door.
It may be possible with the use of a fence to take over all of last few metres or to have half (if half cyclist dismount signs may be needed)
As a very last resort to may be REQUIRED for those with bikes to walk.
I can see no reason why a walking route cannot be permitted.
Any 'risk' crossing A505 at grade must be orders of magnitude greater than using end of platform!
"Anyone who uses the racks in St John's Street, Trinity Street, and King's Parade, may have seen notices about filming this week. They're suspending cycle parking for Wednesday and Thursday 'due to the nature of the filming'. The mind boggles" (Bev)
The suspension notice (elevation, lifting?) says "We have been working with Cambridge council to achieve this. " This phrase probably means that the production company has negotiated a location fee with the city council for filming on Cambridge streets, and to film "bike free". If it is correct that the CCC represents Cambridge Cyclists, and in so far as our constituency bears the impact of this "suspension", we would be well placed to receive some compensation for the inconvenience forced upon local cyclists. 1000 £ or 2000 £ could buy us a lot of bike badges (pins), including blue ones of course
http://www.cambridge.gov.uk/ccm/content/business/licensing-and-permissions/filming.en
citycentremanagement@cambridge.gov.uk
Created by Gregory Williams // 1 thread
Inconsiderate parking of cars on the shared-use RCR15 Viking Coastal Trail cycle path at North Foreland. This has completely blocked the path to cyclists and pedestrians. The photo clearly shows a pedestrian trying to get past the parked vehicles.
Created by cobweb // 1 thread
Two 5 bed houses, five 4 bed houses, internal access road plus car and cycle parking.
Martin Lucas-Smith // 0 threads
Poor-quality cycle parking at Geography.
Created by Andrew Clegg // 0 threads
Parking does exist (at the back of the car park), but it's not obvious. The vast majority of people just leave their bikes propped against the wall near the door.
The bike parking which exists is rather bizarre heavy plant pots with a bike symbol and loops to lock your bike to. The positioning of the loops is awkward and having a plant in the way doesn't help.
As this shop is on NCN 8, it would be really good to see them welcoming cyclists with a prominent sheltered bike parking area with proper stands near the door of the shop.
Created by cobweb // 1 thread
A new shop front for a Co-op store with an ATM to the side elevation.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by cobweb // 1 thread
Madgelene College (at Cripps Court) wish to remove a cycle shed in order to build a timber furniture store. The design and access statement, justifying this, says that few of the racks are used.
Created by cobweb // 1 thread
External works including pedestrian access ramp, alterations to bin storage, covered cycle parking, staff and visitor car parking etc.
Created by cobweb // 1 thread
8 cycle racks shown in the ground floor plan. A retail unit is likely to have some effect on traffic.
Created by cobweb // 0 threads
An application to demolish 191 and 193 Mill Road (opposite St Phillip's Church and replace with 6 studio units and a retail unit. It's a conservation area.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Andrew Woodward // 1 thread
I have serious concerns about the safety of this portion of the bike path; arising from its recent re-design. Recently my 10 year old son was in a very close “near-miss” with a car turning off the A316 into Bicester Road; and I believe many more similar incidents are likely occurring. Eventually someone will be seriously hurt or killed on it.
However, the improvement in the track leads cyclists to feel more confident in using it – giving a false sense of security.
In particular:
• The segregated track makes it particularly appealing for inexperienced and more vulnerable cyclists (such as kids).
• This track design leads to an increase in the cyclists speed.
• The smooth/quick nature of the track leads inexperienced cyclists to believe that THEY HAVE RIGHT OF WAY across side roads.
• There are no markings on the roads to tell drivers coming in or out of side roads that cyclists could be on the track crossing their path.
• There is a particular challenge for EASTBOUND cyclists.
To avoid stopping at every side road, when on the track travelling Eastbound (as per red arrow on photo) approaching roads such as Bicester road, the cyclist has to simultaneously
(a) check to their FRONT/LEFT side to see if a car is exiting the side road
(b) check BEHIND them on their REAR/ RIGHT hand side to see if a car is about to swing off the A316 into the side road (usually at speed) - (as per orange arrow on photo).
This is a hard combination to perform – looking 180 degrees opposite directions at the same time. If you are an inexperienced cyclist, on an apparently safe track, it is very likely that you will not realise you have to be this vigilant and not check adequately for cars.
Hence, my boy rode across Bicester road from the east and was very nearly hit by a car turning off the A316.
(Note that travelling from the west is somewhat easier as both the vehicles turning in from the A316 and those turning out from the side roads are in your front field of vision).
My suggestions for improving this situation are:
(1) Clearly mark the bike track across the side roads so cars are aware there are cyclists approaching from the side.
(2) Ideally, give cyclists priority across the side roads; so making cars slow to a halt and making it more intuitive for cyclists.
(3) To facilitate this, would require some stopping space for traffic coming on/off the A316 to after the bike track crossing
At roads such as Bicester road the bike track could be curved to the south by about 2m before crossing the side road – this curve in the track would
(a) naturally slow cyclists down as they approach the side road
(b) would provide vehicles moving onto the A316 a decent gap so they can separate the concerns of first negotiating the bike track then focus on getting on the A316;
(c) for vehicles coming off the A316 the additional space would give them space to stop and give way to cyclists.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.