Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first, limited to the area of Cyclenation:

  • 20/02568/FUL Hybrid planning application - Bourn Quarter Business Park

    Created by Finlay KM // 1 thread

    Hybrid planning application consisting of full planning permission for Phase 1 and outline planning permission with all matters reserved except access for Phase 2 of the redevelopment of the former Gestamp Factory site at Bourn Airfield for up to 26,757sqm/288,000sqft of commercial floorspace purposes (use class B1c light industry, B1b research and development and B8 warehouse and distribution with supplementary use classes A3 restaurant and cafe, D1 day nursery/creche, D2 gym), associated car parking and service yards, external earthworks, attenuation basins and landscaping.

    Fomer Gestamp Factory Bourn Airfield St Neots Road Bourn Cambridgeshire

    Cambridge

    Application reference : 20/02568/FUL

    Please sign in to vote.
  • Bow Liveable Streets consultation

    Created by Alex Jenkins // 1 thread

    Liveable Streets is a multi-million pound borough-wide street and public space improvement programme. It aims to improve the look and feel of public spaces in neighbourhoods across the borough and make it easier, safer, and more convenient to get around by foot and bike.

    We’ve listened to your concerns on issues including:

    • The volume and speed of vehicles in residential areas
    • Unfriendly pavements, public spaces and poor crossings for pedestrians
    • Hostile environments for cyclists, particularly for children

    We would now like to hear your feedback on the proposals, which you can do by filling out the below survey by Wednesday 29 July 2020.

    What is proposed and why are these proposals important?

    Every day there are over 33,000 journeys within the Bow area. Of these, 49% are vehicles travelling through the area and not stopping. This means over 16,000 journeys are from non-residents of the local area and these vehicles are contributing to the already unacceptable levels of air pollution on your streets, outside your schools and around your local shops.

    The Liveable Streets proposals will help improve road safety, public spaces, air quality and give the streets back to the residents. However to achieve this some local residents who want to drive may have to travel longer distances.

    Seven main schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality. We are proposing traffic changes and calming measures to make local streets safer for everyone. Pedestrian improvements, better street lighting, tree planting and cycling infrastructure are also considered.

    https://talk.towerhamlets.gov.uk/LSBow

    Please sign in to vote.
  • Multiple potholes descending Hills Rd rail bridge

    Created by David Green // 1 thread

    The cycle lane on the Northside of the Hills Rd rail bridge has many potholes where the red tarmac surface is missing. This is extremely hazardous for cyclists to avoid whilst descending with car lanes on either side. You could easily fall off into the path of motor traffic. 

    Please sign in to vote.
  • Tricky crossing to get onto Lendal Bridge from cycle route

    Created by Kirsty Penkman // 1 thread

    It is very tricky to get onto Lendal bridge from the south while cycling; this is a major crossing point for bikes, as it is the junction for cyclists (including families) coming along the river from both directions if they need to get into the centre of town (i.e. the Minster).  Currently it is just a pedestrian crossing, which therefore involves cyclists having to get off their bikes, cross the road, and then get back onto their bikes in a dangerous position, just at a sharp left-hand bend.  If this could be modified (e.g. toucan crossing etc.), that would be really helpful.

    Please sign in to vote.
  • CCC/20/040/FUL Hauxton - Southwest Park & Ride + new NMU bridge

    Created by Matthew // 1 thread

    CCC/20/040/FUL | Proposed Travel Hub, to include car parking, cycle, coach, and horse parking, travel hub building, photovoltaic panels, substation, lighting; significant infrastructure improvements to include road widening of the A10 along Cambridge Road, Hauxton Road and M11 Junction 11 north bound slip road, and a new dedicated busway to include strengthening of existing agricultural bridge; provision for a new Shared Use Path, including new bridge across the M11; with associated drainage, landscaping (including reconfiguration of bunds), biodiversity enhancement areas and infrastructure. | Land To The North/north-west Of Hauxton Road (A10), To The North-west And North Of Junction 11 Of The M11 And To The West Of Cambridge Road (A10) CB22 5HT

    Please sign in to vote.
  • Milton Road cycle/foot paths narrow and/or blocked

    Created by Simon Powell // 3 threads

    City Fibre commenced fibre-laying work on Milton Road in mid-June, digging trenches on both sides of the road at various locations between Downhams Lane and Gilbert Road, mostly on the north-west side.

    This has reduced the combined width of the dual-direction cycle lane and pavement down to about 2 feet in places, often preventing cyclists/pedestrians from being able to physically pass each other. In some places, the footpath and cycle lane have been completely blocked with barriers for periods of time, forcing people into the main traffic lanes. In one of these places, keep-left signs have been put up next to the kerb in the reverse direction, implying that cyclists on the path should go into the traffic lane on the wrong side of the road. Social distancing for Covid-19 is obviously not possible in much of this area now, particularly when groups of workers are standing closely together in the remaining narrow path itself next to the work sites.

    This has coincided with the re-opening of the primary schools and there are quite a few people using the paths. I've had to stop my kid cycling to school as we no longer have safe route down there.

    Please sign in to vote.
  • 53 serviced appartments, Queen Edith's Way

    sound+fury // 1 thread

    The erection of new buildings to provide 53 serviced apartments (sui generis) together with hard and soft landscaping, basement car parking spaces and associated infrastructure and works | Land At 11 Queen Ediths Way Cambridge Cambridgeshire. 

    Please sign in to vote.
  • 20/02160/FUL: New 3 storey building (10 units), 4 Highworth Avenue

    Created by Rosamund Humphrey (Admin Officer) // 1 thread

    Proposed plan: Demolition of existing building and construction of a new 3 storey residential building comprising 10 units (net increase of nine) along with access, cycle parking and associated infrastructure. 

    Bike store for 14 cycles, unclear what kind of fastenings (Sheffield stands/other). Is it big enough to enable cycles in the furthest cycle spaces to manoeuvre in/out? Is the entrance wide enough to accommodate movement of adapted bikes?

    Please sign in to vote.
  • 20/02564/S73: Construction of 6 storey office building, Station Rd, CB1 2JD

    Section 73 application to vary condition 2 of permission 15/0864/FUL: will 254 cycle parking spaces be sufficient for this office space?

    Demolition of Leda House and construction of a new 6 storey office building comprising 7421sq.m (GEA) of office floorspace (Class B1); 254 cycle parking spaces; associated plant; hard and soft landscaping; a basement with 40 car parking spaces and 5 motorcycle bays; infrastructure works including basement car park ramp (Scheme B) to permit improved fire escape provision, enhanced cycle facilities and revised elevational treatment. 

    Location: 20 Station Road, Cambridge, CB1 2JD

    Please sign in to vote.
  • CCC/20/033/FUL A1307 / Haverhill Road / Gog Farm shop junction

    Created by Matthew // 1 thread

    CCC/20/033/FUL | Construction of a new staggered junction, footway / cycleway; an at grade unsignalised crossing point for pedestrians and cyclists at the A1307 / Haverhill Road / Gog Farm shop junction; a new right turn filter lane and upgraded crossing point for pedestrians and cyclists at the Gog Farm Shop entrance, including associated engineering and landscape works. | Junction Of A1307 Babraham Road With Haverhill Road / And The Access To Gog Farm Shop Heath Farm Shelford CB22 3AD, (within The Parish Of Stapleford).

    Please sign in to vote.
  • A120 to A133 Link Road and Rapid Transit System

    "Linking the A120 and A133 with a new road will unlock land to provide housing and business space, improving connectivity locally and within the wider region. It will serve a new Park and Choose site and manage traffic congestion going to Colchester Town Centre, the University of Essex and its Knowledge Gateway Technology and Research Park.

    A Rapid Transit System that will prioritise public transport on a key route through Colchester. It will enable housing and business growth, allowing new and existing residents to benefit from frequent, high-quality, reliable transport connecting to the key destinations within the town. These types of system have proved successful in other towns and cities, helping create a shift away from car travel. A recently implemented example of this is the Belfast Rapid Transit Glider.

    The system will service a new Park and Choose site on the proposed new community east of Colchester and help to better connect future growth areas with the rest of the town."

    Please sign in to vote.
  • Proposed East Colchester Garden Community

    Created by Steven Moseley // 2 threads

    "Braintree, Colchester and Tendring Councils along with Essex County Council joined together to put forward plans for three new settlements built to Garden City Principles.

    The three sites based west of Braintree, on the Braintree / Colchester border and on the Colchester / Tendring border could deliver up to 43,000 new homes along the North Essex A120 corridor with significant employment opportunities and transformational new infrastructure over the next 50 years."

    In May 2020 the planning inspector found the other two proposed settlements to be unsound, leaving East of Colchester as the only one of the three that could proceed.

    Please sign in to vote.
  • Planning application: 20/00398/OUTI3 Erection of multi-storey car park

    Created by Shaun McDonald // 1 thread

    Erection of multi-storey car park and ancillary buildings; Creation of access road and paved external spaces; Re-location of site access onto Friars Bridge Road. Outline application to consider access, scale and layout only (landscaping and appearance as reserved matters).

    Portman Road C Car Park Portman Road Ipswich Suffolk

    Ipswich

    Application reference : 20/00398/OUTI3

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top