Outline application for 125 dwellings in Fowlmere (22/02356)
Outline application for the development of up to 125 dwellings, with all matters reserved except for access. | Land East Of Long Lane Fowlmere SG8 7TG
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Josh Grantham // 1 thread
Outline application for the development of up to 125 dwellings, with all matters reserved except for access. | Land East Of Long Lane Fowlmere SG8 7TG
Created by Josh Grantham // 1 thread
Demolition of existing house and erection of eight flats and one maisonette (net eight new homes) together with ancillary works | 611 Newmarket Road Cambridge Cambridgeshire CB5 8PA
Created by Flic // 1 thread
New local supermarket, day nursery, community centre and retail units being planned in the new estate in Ely. Lack of segregated/marked cycle access to the only community facilities in the North of the city, and by the looks of it not much cycle parking either. There is already a primary school and care home in the area and any cycle access provided is on shared paths.
Created by Anna Williams – Comms Officer // 1 thread
The updated Manual for Streets is to be published on 1 July 2022.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Proposals for a new development on Fanshaw Road have been approved. A planning application is pending.
Created by Gabriel Bienzobas // 1 thread
Proposed temporary installation of art structures than in some cases will create conflict and cause narrowing at certain points in the Cam tow path towards Waterbeach.
Created by Tim Ward // 1 thread
Google Maps suggests that Fen Rivers Way from Bottisham Lock to the A1123 is cyclable. It isn't.
Anon // 2 threads
Cambridgeshire County Council, June 2022 (their web page): "A programme of Active Travel (Tranche 2) projects, to encourage walking and cycling across Cambridgeshire, is set to be delivered in the next few months. The Tranche 2 schemes will be installed on a temporary basis for up to 18 months."
The first part of the Tranche 2 delivery programme, to be delivered between June and August, includes the following active travel schemes (heavily summarised):
(And also some cycle parking around the county, in Buckden, Cottenham, Ely, Haddenham, Huntingdon, Little Thetford, Littleport, Melbourn, Mepal, Ramsey, St Ives, St Neots, Stretham, Whittlesey, Wisbech, and Witcham.)
Nigel // 1 thread
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
Created by Josh Grantham // 1 thread
Demolition of nursery building, part of outbuildings; partial demolition, refurbishment and extension of other existing college buildings and the erection of four accommodation blocks containing 60 rooms for postgraduate students; associated landscaping, car and cycle parking, refuse and other storage and new electricity substation within outbuildings. | Owlstone Croft Owlstone Road Cambridge Cambridgeshire CB3 9JJ
Created by Josh Grantham // 1 thread
Infill of existing carport area and garage conversion to create home office/guest accomodation. | 51A Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Created by Josh Grantham // 2 threads
Residential development containing seven dwellings along with access, car parking, landscaping and associated infrastructure
Created by Josh Grantham // 1 thread
Erection of 3 dwellings following the partial demolition of the existing outbuildings. | 70 Water Street Cambridge Cambridgeshire CB4 1PA
Created by Alice Woods // 0 threads
Following forest trails north from Glentrool leads to a gate with a wayfinder with an arrow pointing directly ahead. The gate ahead is locked shut with a bike lock. Two more gates were locked in this way in the next 400m along the trail, blocking access to the no.7 cycle route from this end of the forest.
Created by Josh Grantham // 1 thread
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
Created by Josh Grantham // 1 thread
Change of use from Guest House to large 12bed House in Multiple Occupation (Sui Generis Use Class)
Created by Josh Grantham // 1 thread
Erection of office building and associated infrastructure and works following demolition of existing buildings and structures
Created by Josh Grantham // 1 thread
22/01995/FUL | Demolition of existing buildings and hardstanding and erection of 70 new homes, car parking, landscaping, bin and bike stores, substation and associated works.
cycle parking provision grouped to 3 areas quite close to the doors. Cycle parking provision needs checking.
Also the site provides several cut throughs, they should be improved and enhanced. Probably worth a deeper look.
Created by Josh Grantham // 1 thread
Application for new property. The design and access state claims compliance with Policy 82 parking standards but no cycle parking has been indicated on the plans.
Created by Josh Grantham // 0 threads
Creation of new property in which the Design and Access statement claims compliance with policy 82. However no cycle parking in indicated on the plan.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Strategy and Resources Committee consists of six councillors who scrutinise the decisions of the Leader/Executive Councillor for Strategy and External Partnerships and the Executive Councillor Finance and Resources.
More Information
Created by Rosamund Humphrey (Admin Officer) // 1 thread
All 42 members of the city council meet formally at least five times a year. Their main responsibilities are setting the budget and policy framework for decision making.
More Information
Created by Matthew // 1 thread
Scout Hut Path is an important link between the Carter Bridge and the Corrie Road neighbourhood. It is narrow and marred by a sharp blind bend in the middle, making it difficult to use for many people especially at night due to personal security and collision concerns.
Created by Anna Williams – Comms Officer // 1 thread
A developer called Kadans Science Partner is proposing to redevelop the Merlin Place site (currently home to the Taylor Vinters building) as part of the North East Cambridge scheme.
Created by Anna Williams – Comms Officer // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Andrew Woodward // 1 thread
I have serious concerns about the safety of this portion of the bike path; arising from its recent re-design. Recently my 10 year old son was in a very close “near-miss” with a car turning off the A316 into Bicester Road; and I believe many more similar incidents are likely occurring. Eventually someone will be seriously hurt or killed on it.
However, the improvement in the track leads cyclists to feel more confident in using it – giving a false sense of security.
In particular:
• The segregated track makes it particularly appealing for inexperienced and more vulnerable cyclists (such as kids).
• This track design leads to an increase in the cyclists speed.
• The smooth/quick nature of the track leads inexperienced cyclists to believe that THEY HAVE RIGHT OF WAY across side roads.
• There are no markings on the roads to tell drivers coming in or out of side roads that cyclists could be on the track crossing their path.
• There is a particular challenge for EASTBOUND cyclists.
To avoid stopping at every side road, when on the track travelling Eastbound (as per red arrow on photo) approaching roads such as Bicester road, the cyclist has to simultaneously
(a) check to their FRONT/LEFT side to see if a car is exiting the side road
(b) check BEHIND them on their REAR/ RIGHT hand side to see if a car is about to swing off the A316 into the side road (usually at speed) - (as per orange arrow on photo).
This is a hard combination to perform – looking 180 degrees opposite directions at the same time. If you are an inexperienced cyclist, on an apparently safe track, it is very likely that you will not realise you have to be this vigilant and not check adequately for cars.
Hence, my boy rode across Bicester road from the east and was very nearly hit by a car turning off the A316.
(Note that travelling from the west is somewhat easier as both the vehicles turning in from the A316 and those turning out from the side roads are in your front field of vision).
My suggestions for improving this situation are:
(1) Clearly mark the bike track across the side roads so cars are aware there are cyclists approaching from the side.
(2) Ideally, give cyclists priority across the side roads; so making cars slow to a halt and making it more intuitive for cyclists.
(3) To facilitate this, would require some stopping space for traffic coming on/off the A316 to after the bike track crossing
At roads such as Bicester road the bike track could be curved to the south by about 2m before crossing the side road – this curve in the track would
(a) naturally slow cyclists down as they approach the side road
(b) would provide vehicles moving onto the A316 a decent gap so they can separate the concerns of first negotiating the bike track then focus on getting on the A316;
(c) for vehicles coming off the A316 the additional space would give them space to stop and give way to cyclists.
Created by Simon Nuttall // 18 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.