Vision Zero Partnership
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
(Moved related thread created 2 months ago.)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 0 threads
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
(Moved related thread created 2 months ago.)
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Roxanne (CEO) // 1 thread
Further expansion of the Biomedical Campus
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of four dwellings, including a dropped kerb and associated infrastructure following the demolition of the existing buildings on site. | 8 Kings Hedges Road Cambridge CB4 2PA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Retrospective change of use from Hotel (C1 Use) to House In Multiple Occupation (HMO) (sui-generis) | Oakley Lodge 627 - 631 Newmarket Road Cambridge Cambridgeshire CB5 8PA
Created by Roxanne (CEO) // 1 thread
The Carter Bridge is looking worse for wear in many ways.
We've had a question about who is responsible for maintenance. Network Rail and Cambridge County Council, Cambridge City Council have apparently denied responsibility and there has been a suggestion that Essex County Council may be responsible.
What do we know about responsibility and previous actions to keep the bridge maintained?
Created by Will Bramhill // 1 thread
1960s roadbuilding seared through the town. Modern road planners have already provided a good toucan crossing between Wellesley Road and Crouch Street West across Southway/Lexden Road. Providing a better ramp from Wellesley Road would help facilitate this.
Essex Housing is redeveloping the Essex County Hospital site as housing. The company has agreed various cycling measures as part of this scheme. It has allocated £25,000 towards remodelling the Wellesley Road/Creffield Road/Maldon Road junction. Gwyn Owen, head of Essex Housing, has agreed that any money left over can be put towards a new, wider ramp. There may also be funds from the Local Highways Panel.
Created by Steven Moseley // 5 threads
Of and relating to Essex County Council.
Created by Steven Moseley // 1 thread
The response to, and effects of the coronavirus pandemic
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Steven Moseley // 7 threads
Policy Documents, guidance, consultations etc. from UK Government.
sound+fury // 1 thread
From the previous thread:
Key information:
The establishment of the new JDCC, composed of members from both South Cambridgeshire District Council and Cambridge City Council have now been completed and the previous JDCC has been dissolved...
'In terms of the remit of the new Committee, some cross boundary sites have been included that were not within the remit of the previous Committee ... both Councils have adopted Local Plans which include specific policy designations – some of which overlap the Administrative boundary of the two Councils. Whilst both Councils have created a shared planning service, this does not change the statutory position of the two Councils as distinct “local Planning Authorities” ... The additional sites include the North East Cambridge Area Action Plan areas within both City and SCDC, Cambridge Biomedical Campus/Addenbrookes site and the extension of Peterhouse Science Park/ARM on Fulbourn Road.'
Created by Rosamund Humphrey (Admin Officer) // 2 threads
Site: The Meadows Community Centre, Arbury
Proposal:
Erection of new community hub and 22 council rented affordable dwellings, car parking, replacement multi use games area, new vehicular access off Arbury Road and enhancements to the recreation ground and installation of substation (as part of wider proposal for the full Meadows site seeking permission for the demolition of existing community centre and the erection of a new community hub, 78 affordable dwellings, car parking, a replacement multi use games area, new play equipment, the creation of new vehicular accesses on to Arbury Road, Daisy Close and St Catharines Road, the provision of new landscaping and substation and the installation of drainage to the football pitch and associated land levelling together with land reprofiling).
https://consultcambs.uk.engagementhq.com/lancaster-way-consultation
Capacity improvements are currently underway to the A10/BP roundabout, required as part of the approved Lancaster Way Business Park expansion planning application.
This is a vital development to support economic growth within East Cambridgeshire and expected to generate 2,500+ jobs, 75% will be from the local area. Cambridgeshire County Council agreed to carry out a feasibility study encompassing the A10, BP and Lancaster Way roundabouts to assess the current congestion issues limiting future growth which was completed in October 2018.
This study identified that capacity improvements at the Lancaster Way roundabout would also unlock further benefits of the measures now being constructed at the BP roundabout. The County Council has started to look at what improvements could be made to the Lancaster Way roundabout and the Cambridgeshire and Peterborough Combined Authority and East Cambridgeshire District Council have agreed to provide funding.
The public have the chance to offer comments for consideration on the proposed design.
This consultation is to share the details with residents and receive feedback. We may share your information with our partners in this consultation (East Cambridgeshire District Council and Cambridgeshire and Peterborough Combined Authority) and with the council analysis team.
You do not have to give us any personal information. We will not publish any personal details you do give us, but may publish our response, and include it in public reports, with personal details removed. Personal data will be held securely, in accordance with data protection legislation. We will only store it for 12 months after the consultation results have been analysed and the consultation report published.
Please view the consultation information prior to completing this survey, online at https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/transport-projects/a10-a142-lancaster-way-roundabout(External link)
All surveys should be completed by the closing date of Friday 18 September 2020.
Your views on the project are welcomed.
It's the usual motorist-centric tripe of course, with ridiculous excuses for not building a signalised crossing ("it's rural" - nevermind that Babraham is also rural and they are doing it there).
Following Dft Phase 1 funding arising from the current Covid19 situation, designs are available for cycle lanes covering the approximate 3.2km length from the Haringey boundary to just south of North Finchley.
The design principle has been, where possible, to provide a temporary lightly segregated cycle lane, defined by wands, bolted into the carriageway surface at 4m spacings. In some cases, we have taken a cycle lane width of 2.5m. In other locations, where space permits, we have re-allocated the whole of a current running lane.
At other locations, we have needed to retain a ‘with traffic’ cycle route. In order to mitigate this, these sections of the route will be provided with carriageway cycle markings and signage as is usual, but complemented with the introduction of 20mph limits.
Monitoring of the route will take place (and indeed has already started) to assess cycle and motorised traffic volumes, as well as to assess any changes to the temporary layout that may be necessary.
In developing the design we have engaged with TfL’s cycling sponsors and have incorporated, where applicable, comments and suggestions from their design audit teams and our safety advisors. We have also obtained support from the police in respect of the 20mph limits.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Safety concerns have been raised around Coldham's Lane - specifically, the stretch running from Coldham's Lane roundabout to the Toyota garage.
These concerns ought to help inform proposals for the CL roundabout and the Marshalls land on Coldham's Lane.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
We're working towards a glossary of key terms to help members and the public.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02871/FUL | Erection of 1no. dwelling adjacent to No.30 Caravere Close - Resubmission of 19/0774/FUL | 30 Caravere Close Cambridge CB4 2UG.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02869/FUL | Conversion of single dwelling into two separate dwellings complete with additional rear extensions and loft conversion to main dwelling | 1 Silverwood Close Cambridge CB1 3HA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02821/FUL: Change of use from HMO (use class C4) to large HMO (8 person) (sui generis)
4 Moss Bank Cambridge CB4 1UR
Created by Steven Moseley // 1 thread
Thanks to planning hiccups in the 90s and 00s, there is a missing section of the path between Rouse Way and Meander Mews that prevents it from being used as an alternative for walkers and cyclists to Cowdray Avenue, or as part of leisure routes, e.g. a riverside loop.
Photograph: John Collett, Colchester Civic Society
This is a consultation about Abbeygate House
Created by Rosamund Humphrey (Admin Officer) // 1 thread
19/0261/NMA1 | Non-material amendment with respect to planning permission reference 19/0261/FUL (Erection of 3 no. retail units (2 x use class A1 and 1 x use class A5), 1no. Community Centre (use class D1) and provision of 14 no. dwellings (8 flats and 6 maisonettes) following demolition of existing commercial units and flats).) The amendments sought are the introduction of additional doors to the northern elevation of Block B, and the provision of a new external cycle store to Block B. | 74-82 Akeman Street Cambridge Cambridgeshire CB4 3HG
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by MJR // 2 threads
There was a Heritage Lottery Fund stage 1 project hoping to progress to stage 2 and work for 5 years from June 2014 to regenerate the "old town" around the Saturday Market Place. The initial draft contains no cycle measures but does mention cycle access policy, so may be persuaded to reinstate lost public cycle parking in places like opposite the old Post Office and might even be a way to fill in the missing link in National Cycle Network Route 1. The consultation papers are online at http://www.west-norfolk.gov.uk/default.aspx?page=26919 and open until 16 December.
The key cycling problem in this area is the difficulty of accessing Saturday Market Place without passing through the poor junction at its east end and the lack of signs telling cyclists to use Priory Lane to reach SMP.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by David Wilcox // 0 threads
Proposal
Improve the public realm of Old Market
Rationale
Old Market functions as the primary eastern entrance and maintains one of the most important historical collections of historic buildings in the city. Its unique character, central location and distinct identity make it an ideal place for regeneration. To encourage investment and regeneration, a scheme is proposed which seeks a reworking of the buses to provide stops at the edge of the street along with wider footpaths, cycle facilities and de-cluttering of signage and lining and a higher quality public realm.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.