access path needs repair
The access path from Monk's close, incorrectly shown on the above map as Monk's Gate to the recently resurfaced Alban way on route 61 could also do with an upgrade
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Willem Hofland // 0 threads
The access path from Monk's close, incorrectly shown on the above map as Monk's Gate to the recently resurfaced Alban way on route 61 could also do with an upgrade
Created by Shaun McDonald // 0 threads
Further to http://www.cyclescape.org/issues/928-paper-mill-lane-alterations-planning-application I think it would be useful to campaign for a cycle and walking link from the site through to the retail park with major supermarket and other amenities, and also other links to that western part of Ipswich.
In my quick skim through the planning application I've not seen any consideration to this route.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by David Earl // 4 threads
The erection of new student housing (257 study bedrooms) and associated communal facilities, cycle parking, and external landscaping following demolition of the existing buildings. Wests Garage Ltd 217 Newmarket Road Cambridge CB5 8HD
(see in particular Ground Floor Plan under Documents)
Created by Tim Burford // 0 threads
I couldn’t tell from the Cyclescape map interface whether there is already a thread on the crossing at the northern junction to Sawston - but I see that it is now being rebuilt, and there seems to be a quite a sizeable central island. Did the inadequate plans get changed? (and why has there been no mention of this if so?)
Created by TMiles // 0 threads
A short section of cycle path allows cyclists to skirt around the traffic lights when turning left from Westgate into Oxford Place.
However the section ends abruptly in front of on-street car parking and the cyclist is forced to give way to other traffic in order to join Oxford Place.
It should instead lead smoothly into a cycle lane that runs the whole length of this street.
Created by Jon_B // 1 thread
This junction has recently been "upgraded", but it still has a single lane at the lights, with a left filter arrow which turns green before the main light to proceed straight ahead.
If you are waiting to proceed straight ahead this effectively means you are marooned in the middle of the junction with traffic behind you waiting to turn left.
Not much fun in a car either, but it is considerably more unpleasant and dangerous on a bike.
I'm not sure if there is an answer other than removing the left filter cycle.
There is a general difficulty with decent routes from this area north up to Woodbridge Road in the rush hour, and this would seem like the best route if it were not for this issue.
Created by Jack Thurston // 1 thread
Cycle Route 46 from crosses the old stone bridge across the River Usk between Abergavenny and Llanfoist. There are good, safe and direct cycle paths on either side of the bridge, but the bridge itself is very hostile for cycling, and walking. It is on the A4143 and there is heavy often fast traffic most times of the day. The footway is very narrow and only on one side of the bridge. Although short, this is a difficult section to negotiate, especially for inexperienced or young cyclists.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Matthew Phillips // 0 threads
The picture shows the view as a cyclist, waiting at the lights on Church Street. Considering the numbers cycling to the university it is extraordinary that the recent remodelling of the junction (2010, with further work on completion of the Palatine Centre) made no provision for cyclists.
It is not obvious how cyclists are meant to access the shared-use paths on campus from this junction, or how to rejoin the road from the campus.
Basic features like advanced stop lines would help, but even better would be a general "green phase", not permitted as yet in UK but under consideration by the DfT. This concept involves green lights for pedestrians and cyclists simultaneously for all directions and is very successful in the Netherlands. It's also what tends to happen, in reality, to some extent at this junction already. Couple it with cycle lanes approaching the junction from each direction instead of the wasteful dual car lanes, and this would be a big improvement.
Created by Matthew Phillips // 0 threads
The photo shows the entrance to Durham Johnston school. Sweeping curves allow fast access to/from the main road, and the cycle path basically gives out. OK, this is probably not a busy side-road, but why on earth can we not have a level, moderately straight route for the cycle path, with priority over the vehicles turning in or out of the school? A raised table to make it clear that motor vehicles should give way. There are plenty more examples along the A167 route of side roads that could do with similar treatment.
Created by Matthew Phillips // 0 threads
A generation ago, cars, lorries and buses drove up and down Silver Street and Elvet Bridge. Now it is pedestrianised (with lorry access for deliveries from 6pm till 10am or 11am). Unfortunately no-one considered cycling provision.
Although Silver Street is busy at lunch times and early evening, Elvet Bridge is never so busy as to make allowing cycling unduly risky for pedestrians. Cyclists are already allowed throughout the day on Saddler Street (as are cars) and that street is much busier. So I think cycling should be allowed on Elvet Bridge all the time, in both directions.
On Silver Street, cycling ought to be allowed, again in both directions, whenever deliveries are allowed. In the mornings this would be up to 10am. While there are pedestrians using the street, there are not vast numbers at that time, but opening it to cyclists would be very useful for people travelling to work.
Obviously, other factors would need to be addressed, such as some of the one-way streets approaching Framwellgate Bridge on the west side, and turning out of Elvet Bridge at the east end.
Relaxing these restrictions would open up a lot more options for cyclists.
Created by Matthew Phillips // 0 threads
New Elvet slopes up steeply as you travel south, so cycling is slow. There are two issues which make cyclists feel particularly vulnerable.
A. On the left there are diagonal parking bays by the shops, with vehicles sticking out into the road, particularly a large van which is often there. Cyclists have to give these a wide berth but then they feel vulnerable to cars wanting to overtake.
B. The second issue is the left filter on the lights to Hallgarth Street. As the road splits into two lanes, it is particularly tricky if you want to turn right into Church Street: if you stay too far left, cars overtake you and then turn across you to the left. If you manage to move over to the right the lanes are narrow and you're conscious of holding up all the cars.
Possible improvements:
A1) Remove the parking by the shops: it's not actually used much by shoppers as most vehicles have resident permits.
A2) Make the parking by the shops parallel to the road.
B1) Reduce the approach to the lights to a single lane, and abolish the left filter into Hallgarth Street. This would also make it easier for pedestrians crossing the mouth of Hallgarth Street where there is no pedestrian phase and no way to see any of the traffic lights to tell if you're safe to proceed.
Another, more radical, option would be to remodel the road layout by carving an uphill cycle lane of reasonable width through the pavement by the shops, to the left of the parking (probably realigning the parking to be parallel) and giving the cycle lane its own phase on the lights at Hallgarth Street so that cycles can get wherever they need to without conflicting with other traffic. Options for making Church Street one-way, or for private vehicle access only from the New Inn end, could also be considered.
Making Elvet Crescent two-way for bikes might reduce the need to cycle up New Elvet, but it's still the most direct route for various purposes so it's not an adequate solution on its own.
Created by Paul L // 0 threads
At the end of Adelaide Rd is a large GP Practice and a dentist. There is no space immediately here but there is space on the opposite side of Park Rd. accessed by a zebra.
Created by Jack Thurston // 0 threads
Frogmore Street is one-way (SE to NW). It needs a cycle contraflow to allow cyclists access from the north/west end of the town to this main commerce street.
A cycle contraflow would achieve this objective. It would also be necessary to reconfigure the junction at the north end of Frogmore Street.
Created by Jack Thurston // 1 thread
There are currently around 6 or 8 cages for cycle parking. One bike per cage. While this is great for anyone lucky manages to find an unused cage, often they're all used. Some additional Sheffield type stands required.
Created by TMiles // 0 threads
Cyclists benefit from an almost continuous cycle or bus lane along the A660 from the city centre. This route is much used by students cycling between central university campuses and accommodation in north-west Leeds.
After the central traffic lights in Headingley, the cycle lane ends and the road narrows. Although the road later widens out to two lanes, there is a stretch (marked on the map) where cyclists have insufficient space on what is a busy radial road.
There are two possible solutions here. The first would be to widen the north-west bound lane to allow a standard width cycle lane to be marked out. The second option would be to add a phase into the traffic light sequence that grants cyclists a ~10 second head start to clear this narrow stretch. This solution could involve detectors in the cycle lane upstream of the lights to avoid its unnecessary activation. It would also allow cyclists to position themselves better for the next junction, where traffic is split into two lanes.
Created by TMiles // 0 threads
West bound traffic on Burley Road approaching the crossroads is segregated into one lane of buses and cycles and one lane of all other traffic. A set of traffic lights 100m from the crossroads gives alternating priority to these two streams: one sequence holds back cars to allow buses to pass through, the other sequence retains the bus lane.
Under the current layout, cyclists that wish to turn left into Willow Road can find themselves detained for some time. They are held back by red lights and lack the room to trickle forward to the later set of traffic lights without coming into conflict with other road users.
However, left-turning cyclists would be able to trickle forward if works were carried out to:
• Reprofile the pavement to allow the installation of a cycle lane following the line on the map.
• Create a bypass to the left of the bus lane lights so that cyclists can legally make headway.
It should be noted that the above measures are only intended for cyclists turning south. Under such measures the stream of traffic is always to the right of the cyclist.
Those going straight ahead (into Burley Rd.) or turning right (into Cardigan Rd.) should remain subject to the bus lane signals because their path crosses that of the other stream.
The current situation constitutes a bottle-neck on routes from the universities and parts of the city centre to Kirkstall and South Leeds. This crossover allows cyclists to access the higher-quality facilities on Kirkstall Road, and avoid the narrower Burley Road (where there is no cycle lane).
Created by MJR // 0 threads
There's a plan to redesign this street which has quite a bit of covered cycle parking at the moment, but no cycle parking is shown on the proposed layout.
An analysis appears at http://blog.jofftastic.co.uk/2013/12/peterborough-city-council-anti-cycling/
Comments on/to http://www.peterborough.gov.uk/community_information/consultation_and_engagement/current_consultations/long_causeway_scheme.aspx by 20 December
Martin Lucas-Smith // 1 thread
Corn Exchange Street contraflow is to close temporarily.
Advanced notice of temporary cycle lane closure (aka Woodburn Way) has been published in the Cambridge News. Cars apparently able to proceed, which I find puzzling.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Gregory // 0 threads
New road layout has been finished here, unfortunately I didn't get a chance to look at any plans before they started work. Despite cycling past on a weekly basis, I saw no notices.
It's not too bad, and extra lanes mean more space. However, I think it would be good to paint an ASL (cycle box) on at the Belmont Industrial Estate Junction. This will make cyclists feel a lot safer and give them a chance to cross the junction then get into a left-hand lane so motorists/lorries can over take after the junction (not dangerously overtake while turning).
On the industrial estate is a local church, two sports centres, the Royal Mail sorting office, and a number of small businesses. As a result, there is a lot more cycling here than there was 5 years ago. Yet there are lorries and now buses(the bus depot has moved here) causing possible space-tensions between road users.
Created by Shaun McDonald // 1 thread
https://consultations.tfl.gov.uk/streets/a1-holloway-road
A1 Holloway Road - Nag's Head
Overview
Transport for London (TfL) has developed proposals to improve road safety for pedestrians and cyclists on the A1 Holloway Road in the Nag’s Head area.
The main objective of the scheme is to put in place a pedestrian crossing on the A1 Holloway Road, enabling people to cross the road easily and safely and to improve access to businesses on the south-western side of the road.
In summary, the proposed measures include the following:
New signalised pedestrian crossing outside the Nag’s Head Shopping Centre
New cycle lanes in both directions
Advanced stop lines added to the junctions of Holloway Road and Tollington Road/Camden Road and Seven Sisters/Parkhurst Road
Resurfacing of the footway and carriageway
In order to make space for these improvements some other changes are required. These include
Relocation of the northbound bus stop (Stop L) approximately 50m north of its existing location
Changes to parking and loading provision, with and overall slight reduction in parking and loading availability
Loss of one small tree on the median island where the crossing will be located. There may also be the potential loss of one other small tree and two relatively mature trees due to kerb cutbacks required in order to relocate the bus stop.
Relocation of several items of street furniture including the removal of a redundant telephone box
The proposals are shown on the attached map. In addition to these proposals, an informal pedestrian crossing with a central refuge island is planned for the A1 Holloway Road adjacent to Jackson Road.
All of the measures that we propose are subject to change as a result of this consultation. Given no unforeseen issues, it is anticipated that the scheme will be implemented in Spring 2014.
Please gives us your views by completing our online consultation form below by Monday 6 January 2014.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Andrew Woodward // 1 thread
It would be useful to provide a route from east side of Kew Gardens station; via Burlington Avenue; along Mortlake Road and up the service road alongside the district line to the Thames Path. The service road is already closed to traffic; but cycling is obstructed by a large ugly concrete barrier (see photo). There is room on the north side of Mortlake Road for a short section of dedicated cycling space to link to the junction with Burlington Ave - see http://goo.gl/maps/DG7gh. The crossing could be problematic.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.