20/01979/PRI03M - change of use, new dwelling
Prior approval for a change of use from Class A1 to Class C3 to become a dwelling. | 153 High Street Chesterton Cambridge CB4 1NL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Prior approval for a change of use from Class A1 to Class C3 to become a dwelling. | 153 High Street Chesterton Cambridge CB4 1NL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 68 dwellings. | National Institute Of Agricultural Botany Huntingdon Road Cambridge CB3 0LE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 87 2bedroomed apartments, flanking a new public park to the south of Anstey Hall in order to provide assisted-living accommodation for people over 65. The Listed house will be adapted to serve as the central facilities for the retirement community. | Anstey Hall Maris Lane Cambridge Cambridgeshire CB2 9LG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no 2bed semi-detached dwellings with associated external works and drainage, with access via existing parking area at Trefoil Terrace. | Trefoil Terrace Budleigh Close Cambridge CB1 3BJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing single storey bungalow and erection of a terrace of 3no. 3bedroom houses along with new parking arrangements and associated works. | 248 Coldhams Lane Cambridge CB1 3HN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Subdivision of 1 Marshall Road, Cambridge to form two dwellings | 1 Marshall Road Cambridge CB1 7TY
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from staff accommodation to Large HMO (9 person). | Flat 111 - 113 Mill Road Cambridge Cambridgeshire CB1 2AZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 1no 2bedroom plus study unit. | 32 Newnham Road Cambridge CB3 9EY
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of new one bedroom dwelling on land to the rear of 95 Cherry Hinton Road Cambridge Cambridgeshire CB1 7BS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Application for demolition of existing and construction of 9 dwellings and associated external works.
P4 of Design and Access Statement states: 'Covered & secure cycle spaces are illustrated on the drawing and under current standard guidelines for new residences. They are generally near the entrances to each flat or available for visitors.'
However, 'Sheffield hoop under stair' is only indication I can see on site plan, so looks as though they are light on detail here and difficult to see if sufficient provision will be made for cycles.
Documents here:
Created by Charles Harvey // 1 thread
I have had an enquiry about cycle contraflows in the London Borough of Barnet. The only one I am aware of is in Church Lane in East Finchley. Is anyone aware of any others?
Created by Roxanne (CEO) // 1 thread
What can be done to make the Coldhams Lane roundabout safer for all road users?
Created by Steven Moseley // 1 thread
Turnstone Estates is pleased to present updated plans for a state of the art leisure facility at the Northern Gateway, Colchester. We want the local community to be able to have their say in advance of a revised planning application being made to Colchester Borough Council. This is to ensure that local input can be fully considered and addressed prior to the submission of the updated application.
Created by Roxanne (CEO) // 1 thread
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 2 studio apartments and 31 x 1bed units.
509 Coldhams Lane Cambridge CB1 3JS
Cambridge
Application reference : 20/02072/PRI03O
Created by Stuart Johnson // 1 thread
Feedback provided to ECC Highways on poor quality cycle infrastructure added to Layer Road, Colchester in Q1 2020
Created by Roxanne (CEO) // 1 thread
Constitution and Ethics Committee
Date/Time: 22 Apr 2020 - 14:00 to 16:00
Virtual Meeting
The County Council's Constitution and Ethics Committee is asked to recommend the changes to the County Council Constitution, as set out in the report, to full Council:
i) the abolition of the Economy and Environment and Highways and Infrastructure Committees;
ii) the introduction of the Environment and Sustainability and Highways and Transport Committees;
iii) revisions to the terms of reference of the General Purposes, Adults, Children and Young People, Commercial and Investment, Communities and Partnership and Health Committees;
iv) the abolition of the Cambridge Joint Area Committee by the end of July 2020 following the discussions set out in paragraph 3.3 of this report;
v) the withdrawal from the Joint Development Control Committee for Cambridge Fringes by the end of July 2020 following the discussions set out in paragraph 4.4 of this report; and
vi) increase the membership of General Purposes Committee from fifteen to seventeen.
Outline application (all matters reserved except for means of Access) for the erection of up to 200 residential dwellings, with associated infrastructure works, including access (vehicular, pedestrian and cycle), drainage, public open space and landscape.
Netherhall Farm Worts Causeway Cambridge CB1 8RJ
Cambridge
Application reference : 20/01972/OUT
Created by Roxanne (CEO) // 5 threads
Campaigning for cycling during the 2020 Coronavirus pandemic. What temporary changes should we campaign for? What longer-term changes should we be pushing for now?
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Proposed conversion and extension of an existing HMO with one self contained flat into 6 x 1 bedroom self contained flats.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor rear extension and demolition of outbuildings to the rear & construction of new 1 person single storey dwelling.
Created by Alan Everitt // 1 thread
Hardwick is seen as a commuter village for Cambridge but currently there are no cycle paths at all within the village, other than a 2 mile long on-road advisory shared with 40 mph traffic. There is also no cycle path north-south through the village - just over a mile. This is a village of around 1250 homes currently being extended to around 1500 but with little attention being paid to cycling yet.
In the S.106 Agreement for West Cambourne construction (2350 homes), SCDC Planning Reference S/2903/14/OL, Cambridge County Council have included an upgraded Cycle and footpath from West Cambourne to Cambridge passing through Hardwick. This can be seen in the S.106 Agreement Schedule 13 and is shown as Fully Funded in the current Cambridge County Council Transport Investment Plan, Scheme number 123.
Before construction of this goes ahead, will there be consultation with villages and residents along the route and do we have any indication of when this might commence? I note there should be plans available but these plans should be readable, clarified and modified with input from the villages on the route including Hardwick.
In the original plan submitted it seems the cycle paths proposed pass directly in front of 150 or so businesses and residential properties accesses and driveways which would seem to be entirely inappropriate for serious cycle-to-work opportunities.
This route appears to be independent from the Cambridge County Council "Greenways" initiative which also did not engage with Hardwick either
.
Martin Lucas-Smith // 1 thread
The section of Park Terrace behind the hotel is wide enough for a cycle contraflow.
Although people can cycle in front of the pavilion, this is shared use and can be busy with pedestrians. It also means encountering traffic lights involving a wait unnecessarily.
Given that there is space, there seems no good reason not to provide a contraflow - in line with the principle that two-way cycling should be possible unless there is no space to do so.
Created by Pearl // 1 thread
A discussion about the Dept for Transport's new Call for Evidence about changing the law regarding e-scooters and other similar vehicles. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/873363/future-of-transport-regulatory-review-call-for-evidence.pdf
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/2903/14/OL for 286 No. dwellings including affordable housing, associated hard and soft landscaping and all ancillary works.
Parcels 1.3B, 1.3C, 1.3E, 1.4A And 1.4B Sheepfold Lane Cambourne Cambs CB23 6EA
Cambridge
Application reference : 20/01640/REM
Created by Roxanne (CEO) // 1 thread
The County Council would like to know our opinion on allowing motorcycles to use bus lanes.
Motorcycling has become increasingly popular as it is a cheaper alternative than travelling by car, it provides independence and mobility and reduces journey times and emissions on congested roads.
As part of the climate change strategy action plan, the County Council at its meeting on 19th December 2019, agreed to consult on the use of bus lanes for motorcycles and scooters, collectively referred to as powered-two-wheelers.
Over 30 UK towns and cities permit motorcycles in bus lanes since the original trials in London back in 2009 and 2011 demonstrated reduced journey times and environmental benefits with no significant safety issues for motorcyclists or other vulnerable road users.
We would therefore welcome your views on whether you support the use of bus lanes by powered-two-wheelers, these together with any additional comments should be sent in writing to the undersigned or by email to policyandregulation@cambridgeshire.gov.uk by 10th April 2020 quoting reference PTWBus.
The feedback we receive will help us understand the level of support for the scheme.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.