21/04797/FUL: 2no. dwellings. 200 Perne Road
Erection of 2no. dwellings following demolition of existing bungalow
200 Perne Road Cambridge CB1 3NX
Cambridge
Application reference : 21/04797/FUL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no. dwellings following demolition of existing bungalow
200 Perne Road Cambridge CB1 3NX
Cambridge
Application reference : 21/04797/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04769/FUL | Two storey side extension to create a one bedroom, a two bedroom dwelling and a detached two bedroom dwelling in the garden. | 3 Forest Road Cambridge Cambridgeshire CB1 9JA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Convert and extend existing garage to rear to provide 1no. 1bed studio dwelling.Proposed dwelling with have its own parking bay and rear garden while maintaining a rear garden for the existing dwelling (No.11) with roadside parking to the front of the existing dwelling. proposed dwelling to meet minimum standards. neighbouring approved scheme on same build line No. 1 Latimer Close.
11 Peverel Close Cambridge CB5 8RW
Cambridge
Application reference : 21/04757/OUT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 21/04852/FUL
Created by Jean Dollimore // 1 thread
Following a fatality at this junction in August Camden Council installed a number of temporary changes to the junction in October.
This consultation concerns some more radical permanent changes
The proposals include:
Created by Steven Moseley // 1 thread
Construction of three 4-bedroom detached houses, each with an integralgarage, plus individual private driveways connecting to Marlowe Way. Retention of two TPO trees.
The busway path is currently closed south of Cambridge station - with a lorry parked on the cyclepath, a set of barriers right across the path and the bus tracks, and the driver standing there to obstruct traffic.
I
Created by Steven Moseley // 1 thread
Outline planning application with all matters reserved save for access for the demolition of all existing buildings and structures and the creation of a residential development with associated open space and infrastructure.
Created by Steven Moseley // 1 thread
Proposed 4 bedroom dwelling and garage/store
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no flats with associated works and landscaping on unused land behind The Seven Stars Public House
The Seven Stars Public House 249 Newmarket Road Cambridge CB5 8JE
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04396/FUL | Erection of one three-bedroom dwelling with associated access, parking and landscaping. | 24 Elfleda Road Cambridge Cambridgeshire CB5 8LZ
Created by Steven Moseley // 1 thread
Land Adjacent Hospytts, The Causeway, Great Horkesley CO6 4AD
Created by Steven Moseley // 1 thread
Proposal for 9 dwellings consisting of 4 x 3 bed houses and 4 x 2 bed apartments and 1 x 1 bed apartment.
Created by Steven Moseley // 1 thread
Demolition of existing Rugby clubhouse and erection of a new two storey community centre with associated parking and landscaping.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A new thread for discussions related to the Cambridgeshire and Peterborough Combined Authority, the strategic transport authority for our region.
Change of use from agricultural land for the construction of an A10 bridge structure with associated earthworks embankment bridge landing, construction of a shared use route for non-motorised users between the Waterbeach Barracks site and Green End including a 3m shared footway cycleway and 2m grassed verge for equestrians and 1m grassed verge, hard and soft landscaping, lighting, construction compound and temporary haul roads
Land Between Green End And The Waterbeach Barracks Site Waterbeach Cambridge Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 21/04625/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Transport in the March area (March North and Waldersley, March South and Rural, Whittlesey South) has been under review.
sound+fury // 1 thread
Part demolition of the existing Romsey Labour Club building with retention of the BLI historic frontage and erection of 44no. serviced apartments (sui generis use class) along with a cafe, gymnasium, community space, and associated infrastructure and landscaping.
Romsey Labour Club Mill Road Cambridge CB1 3NL
Cambridge
Application reference : 21/04559/FUL
Created by Steven Moseley // 1 thread
Outline planning application for 30 dwellings and 1ha of public open space and access from Newbarn Road. Some matters reserved.
Created by Steven Moseley // 1 thread
Demolition of existing dwelling and its replacement with a new dwelling
The existing mini-roundabouts are relatively easy to navigate for confident cyclists only. Any future segregated route along Berechurch Hall Road will require improvements.
Created by Steven Moseley // 1 thread
This junction is fast, dangerous, and over-complicated. It should be improved to better handle the current and future traffic, and cycle and pedestrian movements.
CBC cycling SPD route no. 9 (bidirectional segregated) along Berechurch Hall Road between Layer Rd. and Garrison path at junction with Berechurch Rd. should be provided.
Created by Steven Moseley // 1 thread
Created by Steven Moseley // 1 thread
The barrier should be removed (8.3)
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.