PA_211926_SussexFlat
Proposed annex. Renewal of approved application 181350.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Proposed annex. Renewal of approved application 181350.
sound+fury // 1 thread
As per the tags
Created by Roxanne (CEO) // 1 thread
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03261/FUL: Renovation and two storey side extension of existing three bed house, and three new two storey, two bed, three person terrace houses, external bike and bin stores
43 Brookfields Cambridge CB1 3NZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03119/FUL: New 1 bedroom dwelling fronting Hulatt Road
98 Wulfstan Way Cambridge CB1 8QJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03155/FUL: Erection of 9no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling
72 High Street Cherry Hinton Cambridge CB1 9HZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03413/FUL: Creation of a two storey semi-detached structure to provide 1 No. one bedroom apartment adjoining the neighbouring block of No. 32 Mill Road, ref: 12/1132/FUL
34 Mill Road Cambridge CB1 2AD
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02954/FUL | Change of use from office to flat. | 190 Green End Road Cambridge CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03304/FUL: Retention of existing dwelling, erection of 1no. linked 2 bedroom dwelling and 1no. 1 bedroom detached dwelling, along with a new parking bay accessed from Suez Road and associated works
108 Suez Road Cambridge CB1 3QD
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial closures that were installed in Red Lion Street and Dane Street in June 2020.
They also propose to:
- create a pedestrian and cycle only zone on Red Lion Street south of the junction with Princeton Street with new trees and cycle parking
- stop southbound motor traffic on Bedford Row from accessing Sandland Street, introducing a wide build-out with new trees, seating and cycle parking
Created by Alex Jenkins // 1 thread
https://talk.towerhamlets.gov.uk/lsshadwell
The Liveable Streets Shadwell proposal aims to improve the look and feel of the Shadwell area whilst making it easier, safer, and more convenient to get around by foot and bike.
Overview map of proposals in Shadwell. Please click on the image to download a larger copy.
These proposals have been developed on feedback based on residents, businesses and the local community and aim to benefit all road users. This is achieved by improving accessibility to walking and cycling for all so that those with disabilities, people of all ages, cultures and genders can feel safe. Additionally, the reduction in through traffic in the area will improve the safety and air quality for all.
Our proposals include:
What is being proposed?
Five schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality (click on each scheme to view details):
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Residents in particular parts of Cambridge are being asked to put forward proposals for improving open spaces and play areas via Cambridge City Council’s 2021 S106 funding round.
sound+fury // 1 thread
The application is for former offices to be turned into housing.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
According to the Combined Authority's Forward Plan (July 2021), the Transport and Infrastructure Committee are due to consider proposals for funding a Segregated Cycling Study for Holme to Sawtry and make recommendations to the Combined Authority on 8th September 2021. The lead officer is Paul Raynes, Director of Delivery and Strategy, and the decision will be made by Mayor Dr Nik Johnson.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02888/FUL | Change of use to a large HMO (8 persons)
87 Ditton Fields Cambridge CB5 8QQ
sound+fury // 1 thread
From Idox: Demolition of all buildings on site and erection of 1no. detached dwelling and 8no. 1 and 2 bed apartments Demolish Existing Bungalow and replace with 1No. Detached 2 Storey Dwelling at front of site. Demolish all outbuilding to rear currently used a flooring company and replace with 8No. 1 and 2 Bedroom Apartments. | 125 Scotland Road Cambridge CB4 1QL
Created by Jean Dollimore // 1 thread
TfL is planning to upgrade two of the existing signalised pedestrian crossings on Camden Road to Toucans.
These crossings are:
Rochester Road to Rochester Square
The crossing lines up with Rochester Square (south side of Camden Road) so TfL is proposing a section of shared-use footway on the north side of Camden Road from Rochester Road to the crossing.
Cantelowes Gardens to Cantelowes Road
The crossing almost lines up with the footway exit from Cantelowes Road (past the planter known locally as the ‘billiard table’). TfL is proposing a section of shared-use footway on the north side of Camden Road between the western exit from the Gardens and the crossing.
Details
Camden is being left to make the connections at both ends of the two crossings. These are tricky e.g. cycling isn’t even allowed in Cantelowes Gardens at the moment. But those issues are outside the scope of this consultation.
Toucans are signalised crossings where cycles and pedestrian share the surface of the crossing as well as an area of footway on both sides of the road. They are supposed to be at least 4m wide. (LTN 2/95).
The Rochester Road crossing width will be increased to 4m. The crossing at Cantelowes Road is already over 3.5m wide. In both case the island width will be increased to 2.5m
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02293/FUL | Construction of 2no 1bed dwellings.
15 Garlic Row Cambridge Cambridgeshire CB5 8HW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02862/FUL | Two storey rear extension and loft conversion of existing dwelling to create additional accommodation and development to side of existing dwelling to create two self contained 1-bed flats
15 Tillyard Way Cambridge CB1 8QT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from single dwellinghouse (class C3) to 11 person house in multiple occupation (sui generis) including provision of cycle and refuse store
1 Selwyn Gardens Cambridge CB3 9AX
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02759/FUL: Demolition of existing buildings and erection of new commercial/retail floor space, 48 new residential apartments and houses, new car parking areas, new hard and soft landscaping, bin and bike stores and associated works
Colville Road Phase 3
Land At Colville Road
And Fishers Lane
High Street
Cherry Hinton
Cambridge Cambridgeshire CB1 9HT
Created by Jean Dollimore // 1 thread
Sandall Road Safe and Healthy Streets scheme
In May 2020, as a trial, bollards were placed across Sandall Road by the width restriction to prevent motor traffic from cutting through residential streets between Camden Road and Kentish Town Road or Leighton Road.
Camden is now consulting on whether the trail scheme should be made permanent. Drawing here.
The consultation and the Online Survey are here
https://consultations.wearecamden.org/supporting-communities/sandall-road/
Savernake and Cressy Road Safe and Healthy Streets scheme
In May 2020, as a trial, bollards were placed across Savenake Road by the entry to Saverrnake Bridge to prevent motor traffic from cutting through Constantine Road and Savernake Road to avoid the signals at the junction of Agincourt Road and Mansfield Road.
Camden is now consulting on whether the trail scheme should be made permanent with some enhancements - three separate water absorbing planting areas to include three new trees. Plans.
They are also proposing two-way cycling on Cressy Road between Agincourt Road and Constantine Road – a very welcome extension of the recently implemented two-way cycling on Cressy Road south of Agincourt Road.
And an electric vehicle charging point.
The consultation and the Online Survey are here
Created by Roxanne (CEO) // 1 thread
Anglian Water and Cambridge City Council, working with U+I and TOWN, are exploring the vision for a new sustainable urban quarter at the heart of the proposed new district of North East Cambridge.
The project is currently called the Core Site, North East Cambridge (shown on the attached map). The aim is to deliver over 5,000 new homes on the Core Site over the next 20 years, along with shops, workplaces, education, community and leisure facilities, and open spaces. This opportunity is enabled by the proposed relocation of Anglian Water’s Cambridge Waste Water Treatment Plant, with the support of Homes England, and the Cambridgeshire and Peterborough Combined Authority.
Cambridge City Council is currently bringing forward an Area Action Plan (AAP) for the wider district, within which the Core Site is located, which could deliver a total of 8,000 new homes in ‘an inclusive, walkable, low-carbon new city district with a lively mix of homes, workplaces, services and social spaces, fully integrated with surrounding neighbourhoods’. The Core Site has a key role to play in delivering this vision.
The landowners of the Core Site - Anglian Water and Cambridge City Council - have selected U+I, in partnership with TOWN, as master developers for the site will be working to bring forward proposals for the site and, eventually, a planning application.
Created by Steven Moseley // 1 thread
Conversion of existing first floor office accommodation into two 2 bedroom apartments along with ground floor refuse and cycle storage
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.