Created by velocipedus@gmail.com // 2 threads
Partnerships and Alliances holds threads related to specific groups and constituencies
Martin Lucas-Smith // 2 threads
[Moved from another unrelated issue]
Michael Cahn writes:
"During the meeting with Public Health earlier this month, there was interest from officials when we raised the idea of a bike program in their Fenland focus area. I have now received a list of postcodes (PE13, PE15, PE16, PE7) and intend to see if we happen to have any members there, who could become the natural seed pod for a bicycle intervention program in their area, or advise on specific opportunities there."
Martin Lucas-Smith // 1 thread
[This issue moved from another unrelated thread]
We have heard there is interest in set up a cycling group in Bury. The initial focus of the person making contact is a better connection between Horringer and BSE.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 3 threads
Proposal
To investigate options to provide a safe, continuous route from St James Barton Roundabout to the top of Park Street.
Rationale
Marlborough Street/Upper Maudlin Street/Perry Road/Park Row (known as the Scope Route) is the most desirable route for cyclists from the east of the city to the University, the Triangle, Clifton etc but is heavily trafficked with little cycle provision.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 0 threads
Proposal
Improve the public realm of Old Market
Rationale
Old Market functions as the primary eastern entrance and maintains one of the most important historical collections of historic buildings in the city. Its unique character, central location and distinct identity make it an ideal place for regeneration. To encourage investment and regeneration, a scheme is proposed which seeks a reworking of the buses to provide stops at the edge of the street along with wider footpaths, cycle facilities and de-cluttering of signage and lining and a higher quality public realm.
Part of the 2013 Bristol City Council LSTF proposals.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Proposal
To investigate the purchase of land of the Car Park of the VOSA building adjacent to the Bristol Bath Railway Path (BBRP).
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The path narrows at its approach (inbound) to the Lawrence Hill underpass, resulting in an uncomfortable experience for path users. Purchase of the VOSA car park would allow the path to be widened through this section.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 0 threads
Proposal
To widen the path that links Trinity Street/West Street with the Bristol Bath Railway Path.
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. Many of these journeys access the railway path via a narrow path from Trinity street. The path is 1m wide, which is unsuitable for the volume of cyclists and pedestrians that use it.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
Provide a continuous, uninterrupted route with pedestrian and cyclist priority over side junctions, adjacent to Easton Way on both the East and West side. Utilise existing roads, footpaths and the verge, including the bunds.
Investigate options to improve legibility at the Lawrence Hill Roundabout and provide links to West Street/Old Market.
Rationale
Easton Way is a barrier for both pedestrians and cyclists. These proposals would seek to reverse some of the community severance that results from a road of this nature. The route will provide for variety of journeys such as; Stapleton Road to the new Library development at junction 3; and from Lawrence Hill to Old Market and the City Centre. It will also link existing routes such as the Concorde Way, Frome Greenway and BBRP to the Spine Road, providing a good North/South route.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a fully segregated two-way cycle facility on west side of Redcliffe Hill that links Bedminster Parade/York and Commercial Road/Clarence Road with Redcliffe Bridge and the Brunel Mile.
This provides a direct route from destinations and major trip generators in the south to the City Centre and begins to deliver a North/South route. This proposal would ties in with proposed improvements on Commercial Road/Clarence Road that will link into the forthcoming Local Enterprise Zone.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by David Wilcox // 0 threads
A change in the waiting restrictions on this section of Pigsty Hill on Gloucester Road, Bristol. This is because some new flats have been built on this section. Lets hope they are enforced.
http://www.bristol.gov.uk/sites/default/files/documents/transport_and_streets/Gloucester%20road%20Draft%20order.pdf
http://www.bristol.gov.uk/sites/default/files/documents/transport_and_streets/Gloucester%20road%20Proposed%20plan.pdf
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 0 threads
This road is to made one way with traffic calming and a contra flow cycle route.
Created by David Wilcox // 0 threads
Traffic Calming on Whitefield Avenue to reduce rat running by cars.
Contra Flow cycle routes will be installed.
Created by David Wilcox // 0 threads
An attempt to slow down traffic and stop rat running for cars.
Contra flow Cycle routes will be provided.
The proposal to introduce a pedestrian crossing in the vicinity of Duchess Way is to provide a safer environment for pedestrians to gain access to local amenities and bus stop facilities. The Zebra crossing will also aid children who live in the Duchess Way area to walk to and from local schools.
Created by David Wilcox // 0 threads
Statement of Reasons for Proposed Traffic Order
Location: Berkeley Place/Triangle South/Triangle West and Byron Place (Cabot and Clifton East Wards)
Proposal: Prescribed Movements and Prohibition of Driving
The Council considers it expedient to make the order for:
- avoiding danger to persons or other traffic using the road or any other road or for preventing the likelihood of any such danger arising, or
- facilitating the passage on the road or any other road of any class of traffic (including pedestrians).
The requirement for improved pedestrian crossing facilities at the Berkeley Place/Triangle South/Triangle West junction was identified when planning applications for adjacent developments were considered. Contributions for this purpose were secured from the developers under the planning process.
To guard against the possibility that motorists might undertake inappropriate manoeuvres, which could bring them into conflict with pedestrians using the new facilities, it is proposed that regulatory signs should be employed to provide drivers with clear direction, when they enter the junction from Berkeley Place and Triangle South. The Traffic Signs Regulations and General Directions 2002 (as amended) stipulates that these signs, when used on the public highway, must be supported by a Traffic Regulation Order. The traffic order is proposed for the sole purpose of complying with this statutory requirement and would not result in any further restriction on vehicle movements at this intersection. The regulatory signs will be integrated into the signal heads to ensure they are clearly visible to motorists, whilst minimising the number of posts to avoid unsightly ‘clutter’.
As part of the pedestrian crossing scheme, it is proposed that vehicles should be prohibited from driving in the eastern arm of Byron Place, directly outside Nos. 7-10. This would provide improved access to the new crossing facilities. The one-way traffic order, which applies to this length of road, would be rendered redundant and would be revoked at the same time.

Created by John Hall // 0 threads
Final version at https://www.ensembling.com/68508
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Gregory Williams // 1 thread
The cycle route warning signs on lighting columns QAD014 and QAD011 haven't been reinstated following the replacement of lampposts in Queens Avenue. These Google StreetView images show them on the old lampposts:
http://goo.gl/maps/QDqt8
http://goo.gl/maps/KNzNY
The signs should be reinstated to ensure that other road users are aware that they should expect to see cyclists emerging from the section of cycle path adjoining Queens Avenue.
Created by Shaun McDonald // 1 thread
There is a new something being installed in the middle of a shared cycle pavement (see photo), yet there is already limited space, especially at peak times.
South Glos Council have published a consultation for extending the cyclepath from Emersons Green to Yate - the Yate Spur
https://consultations.southglos.gov.uk/consult.ti/YateSpurWesterleighRd/consultationHome
Funding has been secured through the Local Sustainable Transport Fund to deliver elements of the Yate Spur cycle path. When complete, the route will connect the Bristol to Bath Railway path with Yate.
The proposed road crossing will provide an informal crossing facility at Westerleigh Road for cyclists, walkers and horse riders using the Yate Spur Cycle Path and Fishing Lakes Link.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Created by Martin L-S // 1 thread
Ever since Tesco opened their new shop on East Road, there has been poor unloading practice.
The company is unloading always from the front of the store with a large lorry which:
- Is stopped in the (advisory) cycle lane.
- The tail of the lorry is opened into the carriageway without a banksman, with the corner of it at the same height as a cyclist having to merge round the lorry - there is real potential for a head injury because of the relative invisibility of this
- Causing traffic to be reduced to one effective lane (or two, just squeezing through, if no large vehicles), causing delays for a half an hour period.
They have stopped using the zig-zag lines.
This photo shows the danger that is created:
http://www.cyclestreets.net/location/68145/
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
From member R.A.G.
There used to be two very useful cycle boxes (ASLs) in either direction at the junction traffic lights where ARR crosses SR. However, they have relayed the junction, and also repainted, but these two ASLs have disappeared.
While I actually think that a lot of ASLs are not that necessary (when the only option is to go straight on or turn left, and the volume of cyclists is always very low) as I'm sure you are more than aware, ASLs in positions such as these ones, are actually very important. If you are turning left from ARR onto SR the it is not an issue, however if you are continuing on ARR across the junction, then it is. ARR crosses SR with a slight left right shimmy, so you have to turn left first, then be in the right hand lane on SR, before you turn right to continue onto ARR, which is almost impossible/very dangerous without taking up the centre of the ARR single lane, before temporarily turning left onto the SR right hand lane of two.
I would like to think that they will be painted back in time, but it would seem that all other painting has been completed, and the workmen have moved on, so it doesn't look likely.
It is mildly ironic, while supposedly increasing cycling safety down SR, they have in turn decreased it on an adjoining roads such as ARR, and perhaps numerous others.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Dawes Jaguar // 0 threads
Bunbury Road is busy, but road users emerging from Woodlands Park Road and Northfield Road have to play a game of chicken as they try to judge the best moment to make a rapid exit without crashing into each other. Adding to the processing overload, the following must also be taken into account by road users:
* A service road opposite Woodlands Park Road connects with Bunbury Road at this point.
* A cycle path runs from the junction down to Bunbury Gardens.
* A zebra crossing, one that many motorists (including police drivers) fail to stop for, presumably because of the processing overload.
Lacking acceleration, cyclists face a long wait either at the junction or the zebra crossing. Either way they risk being mown down by a motorist lacking the superhuman skills required to negotiate this junction safely. Since even police drivers make dangerous mistakes here, then it is clearly hopelessly wrong.
There is quite a bit of space here. I would suggest as a minimum a single lane roundabout be created, but since Bunbury Road is busy and there is already a cycle path here it should be made a proper Dutch-style roundabout. To ease the design, close Northfield Road at this point to motor traffic (Northfield Road runs parallel to Bunbury Road).
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Created by Jean Dollimore // 3 threads
The North-South Cycle Superhighway is already under construction between Stonecutter Street and Elephant & Castle.
TfL, together with Camden and Islington Councils, is now consulting on proposals to extend it north up to King’s Cross.
The proposal is that it should continue north on Farringdon Road to Greville Street where northbound cyclists would turn onto a quiet back-street route to King’s Cross.
Southbound cyclists from King’s Cross would turn off the back-street route onto Farringdon Road at Ray Street via a new signalised junction and continue south on a stepped cycle track.
Detailed proposals
Section 1 - Farringdon Street (between Stonecutter Street and Holborn Viaduct)
https://consultations.tfl.gov.uk/cycling/afgdegdg8t9
Section 2 - Farringdon Street (between Holborn Viaduct and Charterhouse Street)
https://consultations.tfl.gov.uk/cycling/afgdasrcgrm2908
Section 3 - Farringdon Road and Saffron Hill (between Charterhouse Street and St. Cross Street)
https://consultations.tfl.gov.uk/cycling/rcgrthth5w6
Section 4 - Farringdon Road and Saffron Hill (between St. Cross Street and Ray Street)
https://consultations.tfl.gov.uk/cycling/cg25ty5cy
Section 5 - Farringdon Road, Ray Street, Herbal Hill and Warner Street
https://consultations.tfl.gov.uk/cycling/cg5eh4h
Section 6 - Warner Street and Phoenix Place
https://consultations.tfl.gov.uk/cycling/cv45h646
Section 7 - Pakenham Street, Calthorpe Street and Cubitt Street
https://consultations.tfl.gov.uk/cycling/c5hv365j753j
Section 8 - Ampton Street, Sidmouth Street and Tavistock Place
https://consultations.tfl.gov.uk/cycling/vch34yv3u
Section 9 - Tavistock Place and Judd Street
https://consultations.tfl.gov.uk/cycling/qgc245y
See also this related scheme for the treatment of the Euston Road junction and continuation northwards: http://camdencyclists.cyclescape.org/issues/2057-midland-road-and-euston-road-judd-street-junction-north-south-cs-link
Created by Simon Munk // 1 thread
The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.
Proposals
Based on the results of the survey and the feedback from Emergency Services we have
developed a set of proposals that aim to make improvements for all road users:
• Bus stop improvements to provide better access for passengers including disabled users.
• Improve and raise the existing zebra and signal crossings.
• A new raised zebra crossing on Billet Road near Cecil Road.
• 20mph speed limit along Billet Road.
• Better and energy efficient street lighting.
• Tree planting and footway resurfacing along the road.
• A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
• Two-way, fully segregated east and west cycle track.
• New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
• Raised areas at junctions that prioritise pedestrians and slow traffic down.
• De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
• Parking bays relocated at certain unsafe locations along the road to be converted to
segregated cycle track. New parking bays will be provided nearby.
• Various waiting and loading restriction at locations of concern to improve road safety
and ensure smooth flow of traffic.
• Anti-skid surface to help prevent vehicles from skidding.
Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.