Unhappy pavement 'cyclepath'
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Debra Storr // 1 thread
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
Created by Debra Storr // 1 thread
Shared cyclepath fizzles out with a short length of a parallel roadway providing the infill. Uncomfortable.
Created by Debra Storr // 1 thread
This is a 40mph distributor road which is currently fairly quiet. But many houses are planned in this location. It would have been helpful if the pavement has been built a bit wider and designated as a shared path/cycleway. Even better would be an actual cycleway but we can press for that with the development.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Debra Storr // 1 thread
With a existing cyclepath on south-west of roundabout and a proposed cyclepath on the north east side, the issue of a crossing at the Murcar roundabout needs to be resolved.
Created by Debra Storr // 1 thread
While part of new Balmedie-Blackdog route is tarmac, the southern portion has been left as gravel/ground and will undoubtedly get worse in winter. Funds are being sought to improve.
Created by Debra Storr // 1 thread
Consultation open until 18th August 2019 on cycleway as shown.
Unresolved issue of connections into Blackdog from bus stop on dual carriageway and connection at Murcar onto existing shared cyclepath on west side of dual carriageway.
Created by Hounslow Cycling Campaign // 1 thread
The London Borough of Hounslow is consulting on the Local Plan Reviews for the Great West Corridor and West of Borough opportunity areas. The Local Plans set out planning guidelines for major developments in the respective areas. Each Plan includes a section on "Connecting People and Places" that covers transport aspects of developments.
Steve Curran, the Leader of Hounslow Council, refers to the negative impacts of major roads crossing the Great West Corridor area in his foreword. "Attractive alternatives to the private car" described in pp74-83 of the consultation document include improved walking and cycling infrastructure. Proposals for two new rail links will be rather more expensive.
Councillor Curran expresses concern about the environmental impact of a Third Runway at Heathrow Airport on the West of Borough area but also points out the regeneration opportunities. "Attractive alternatives to the private car" described in pp78-85 of the consultation document include improved cycling and walking infrastructure.
Reserved matters application pursuant to outline approval 06/0796/OUT (amended by Section 73 approval 17/2258/S73) for: an R and D Enabling Building of 13,197 sqm; an Amenities Hub of 3,261 sqm; associated car, motorbike and cycle parking including a Multi Storey Car Park; a temporary Multi Use Games Area; hard and soft landscaping; and internal roads, supporting facilities and ancillary infrastructure.
Astrazeneca Uk Ltd Cambridge Biomedical Campus Francis Crick Avenue Cambridge Cambridgeshire CB2 0AA
Cambridge
Application reference : 19/1070/REM
19/1010/FUL | Conversion and extensions to the existing buildings including demolition of the existing block to the rear of 1 Godesdone Road to deliver a mixed use development comprising a ground floor retail space and 12 1xbed residential units (net increase 9) to the rear and above along with cycle parking and associated infrastructure. | 185-189 Newmarket Road And 1 Godesdone Road Cambridge Cambridgeshire CB5 8HA
Martin Lucas-Smith // 1 thread
Creation of a cycle storage area equiped with racks to facilitate appprox 200 cycles following removal of a large white birch tree to undertake repairs to building caused by tree roots.
Robinson College, Porters Lodge Grange Road Cambridge CB3 9AN
Cambridge
Application reference : 19/0926/FUL
Demolition of existing flats 66-80b Colville Road and erection of 69 affordable dwellings, including 6 houses and 63 apartments, including resident and public car parking, landscaping and associated works
66-80B Colville Road Cambridge Cambridgeshire CB1 9EJ
Cambridge
Application reference : 19/1034/FUL
The A14 works have closed the east side pavement/cyclepath for some amount of time.
This either forces people to cross the rode via 4 toucan crossings (and cycle or walk up a very narrow stretch) which is technically not a cycle path I believe. Alternatively people have to cycle on road across a busy 2 lane 60mph limit roundabout.
sound+fury // 1 thread
Created by Peter Loader // 1 thread
Create an unsegregated cyclist/walker area in the paved area that was produced when the northern arm of Northway, Rickmansworth became traffic-free. Call it Northway Square. This would become the centre of Rickmansworth's cycling/walking network, with Bikeability level 2 routes leading:
* To National Cycle Network Route 61 (The Colne Valley Trail at the Aquadrome), to Mill End, and to Maple Cross.
* To Rickmansworth Station, to Chorleywood, and to The Cedars Estate,
* To Croxley Green, via Three Rivers District Council's car park.
Upgrade the existing public footpath to a bridleway so the route remains on the definitive map.
Martin Lucas-Smith // 1 thread
The section of East Road at the police station end, with the cycle lane, suffers from absolutely rife pavement parking and parking in the cycle lane.
Created by Alex Jenkins // 2 threads
The draft Tower Hamlets Transport Strategy aims to improve the way we move around our borough.
Tower Hamlets is one of the country's fastest growing boroughs. Our roads are the busiest in the UK.
77 per cent of our residents are exposed to unsafe pollution levels, children in the borough have on average up to ten per cent less lung capacity and 43 per cent of Year 6 school children are overweight or obese.
According to Public Health England, pollution is linked to increasing rates of asthma, heart disease, dementia, lung cancer and low birth weight.
The new strategy aims to address these concerns and look at what the council and residents can do to make travel cleaner, safer and accessible for everyone.
Promoting walking and cycling is at the heart of plans to help meet the Mayor of London’s target that 90 per cent of all trips in the borough should be made on foot, by cycle or by using public transport by 2041.
Over the next two months, the council will be asking all those who live and work in the borough to get involved, share their ideas and help shape the future of travel in Tower Hamlets.
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S/2413/17/OL as varied by Section 73 application S/4116/18/VC for the erection of up to 200 residential dwellings (including 40% affordable housing), demolition of no. 117 Rampton Road, introduction of structural planting and landscaping, informal public open space and children's play area, surface water flood mitigation and attenuation, vehicular access points from Rampton Road and associated ancillary works.
Land Off, Rampton Road, Cottenham, Cambridgeshire
South Cambridgeshire
Application reference : S/2549/19/RM
Tom McKeown // 1 thread
The mouth of Cotteham Road is wide and fast. How do we get this improved? Especially in the context of the new school.
Created by Martin Gorst // 1 thread
Ealing Council is consulting on a new scheme for the area outside Ealing Broadway station.
Reduction in Cycle Parking
As part of the scheme, Ealing Council plans to remove 59 cycle stands on and near Haven Green and replace them with 29 stands along the Broadway. This will remove parking for 60 bicycles. As Haven Green is common land, the cycle stands on the grass are only temporary. At some point they will need to be removed. Ealing Cycling Campaign has repeatedly urged the council to earmark a site near Ealing Broadway station for permanent cycle parking. A good location would be the car park along the south side of Haven Green. Unfortunately the council has still not been successful in acquiring the required land, and has not yet decided to instigate compulsory acquisition procedures, or otherwise escalate the process.
At times of peak demand, the cycle stands near Ealing Broadway fill up, and people lock bicycles to trees and other objects. With the arrival of the Elizabeth Line and the new cycleway to Greenford, the demand for cycle parking at the station will grow.
Where’s the Cycle Lane?
The new plans don’t include the contraflow cycle lane (below) the council promised six years ago.
For over 20 years Ealing Cycling Campaign has lobbied the council to build a contraflow cycle path to run along the east side of Haven Green (but not on the common) to link the Mall with the roundabout at Madeley Road. This will provide a direct route to and from Ealing Broadway station so people don’t have to cycle around the Arcadia Centre and Haven Green. In 2013, the council included the cycle path in its mini Holland plans. However, it has disappeared from the latest proposals. This goes against the council’s transport policy for its cycle network, which states: “Where one-way streets are implemented, the default position will be that contra-flow cycle lanes will be provided.”
sound+fury // 1 thread
The changes themselves are not controversial. (College doing some refurbishment of property for student use.) However, for a 7 bed house, they propose only 6 bike rack spaces.
Anon // 1 thread
We would like your views on suggested changes to the controlled parking zone on your road
In 2018 we asked you if would like us to make any changes to the Bermondsey CPZ 'G'
As part of this survey we sent out a total of 9,517 surveys and received a 4% response rate. 65% of those who responded wanted the current parking restrictions to be amended with 61% stating that they struggle to park on a Saturday. We would now like to know in detail the changes that you would like us to make.
We know, from the original survey and changes in the area such as residential developments and an increase in bars and restaurants, that parking stress has increased and we would like to know what changes you would make.
If we receive a majority in favour of amending the operating times and hours of Zone ‘G’ we will put forward a recommended amendment to the Cabinet Member for Environment, Transport and the Climate Emergency to make a final decision.
In addition to potential changes to the operating hours of the controlled parking zone we would also like to know if residents and businesses in the Shad Thames area would like their own separate zone. This would mean that permit holders in this area would have their own permits and would only be able to park in that area.
This decision would then be subject to statutory consultation.
What are the pros and cons of extending the operating hours of my parking zone?
Pros
Cons
If we were able to reduce the amount of vehicles parked in the area, we could consider introducing a variety of street improvements as detailed below:
Created by George Coulouris // 1 thread
Royal College Street works 8th July -16th August
The planters will be replaced by granite kerbs – affecting RCS south of Baynes Street.
The works will start on 8th July and are expected to be completed by 16th August 2019. During the works, northbound cyclists will be diverted to use the with-flow traffic lane whilst southbound cyclists will be diverted to use St Pancras Way.
We will keep you informed here as to which segment of the cycle track is currently unavailable.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Group looking at issues for active travel in the Chesterton area.
sound+fury // 1 thread
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)