Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
-
-
County Council meetings
The full Council, comprising all 61 County Councillors, is responsible for setting the Council's budget, the Council Tax and agreeing the Council's main policies.
-
Combined Authority - Audit and Governance Committee
The Audit and Governance Committee's role is to review the Combined Authority's financial affairs, internal control, corporate governance arrangements and risk management. The Audit and Governance Committee was established by the Combined Authority in March 2017 in accordance with the Combined Authorities Order 2017. The committee is made up of one member from each of the constituent councils of the Cambridgeshire and Peterborough Combined Authority.
-
Planning application: 22/00786/FPC Link road Europa Way and Bramford Road
Proposed construction of a link road between Europa Way and Bramford Road, with a new mini-roundabout on Bramford Road, together with a shared footway/cycleway, sustainable drainage and landscaping (Suffolk County Council ref. SCC/0090/22IP).
Land Between Europa Way And Bramford Road Ipswich Suffolk
Ipswich
Application reference : 22/00786/FPC
-
Herbert St - bollards after roadworks
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
-
Sawston/Babraham cycleway closure 2022-09-15 for 3.5 weeks
We've received a note from a concerned resident:
Not too sure if this has been informed of this but the Sawston to Babraham CyclePath is planned to be closed by a commercial property developer on 15th Sept. Don't know when it'll reopen. All cyclists will be forced to cycle on the main road that is a pretty hairy affair at the best of times. They did this already for 2 days back in August without any consultation. The cyclepath has become very popular in the last few years as many employees from the Babraham and Granta Parks use it for commuting. Also it's relatively new so can't believe that private developers are allowed to shut it basically to use it as a free convenient storage area.
-
Unlit post hazard
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
-
Dangerous to cross Milton Road diagonally at Toucan crossing
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
-
Long wait to cross Busway / Station Road, Histon
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
-
safety issue
There are no give way markers where Max.Railway Path joins the Garroch Loaning cycle path
-
East Cambridgeshire campaigns
Campaigns to improve active travel provision in East Cambridgeshire.
-
Erection of 3no 2bed units by Pembroke College on Panton | 22/02776/FUL
22/02776/FUL | Erection of 3no 2bed units providing accommodation for use by Pembroke College, as well as alterations/refurbishment of existing Coach House to rear of 32 Panton Street and associated landscape works/vehicle and cycle parking, and bins storage, including the front gardens of nos 32-40 Panton Street. | The Coach House Rear Of 32 Panton Street Cambridge Cambridgeshire CB2 1HP
-
Dwelling to HMO at 11 Darwin Drive
unacceptable cycle parking arrangement at dwelling house to sui generis large HMO (9no. bedrooms / 9no. occupants). | 11 Darwin Drive Cambridge Cambridgeshire CB4 3HQ.
-
22/02722/HFUL | Erection of cycle shelter in front driveway
Hello
This is my application for a cycle shed on my driveway.
Unfortunately I have received an objection from a neighbour.
-
Outline application for 125 dwellings in Fowlmere (22/02356)
Outline application for the development of up to 125 dwellings, with all matters reserved except for access. | Land East Of Long Lane Fowlmere SG8 7TG
-
9 Flats on the Ives and Reed site | Newmarket Road | 22/02127/FUL
Demolition of existing house and erection of eight flats and one maisonette (net eight new homes) together with ancillary works | 611 Newmarket Road Cambridge Cambridgeshire CB5 8PA
-
Orchards Green local centre
New local supermarket, day nursery, community centre and retail units being planned in the new estate in Ely. Lack of segregated/marked cycle access to the only community facilities in the North of the city, and by the looks of it not much cycle parking either. There is already a primary school and care home in the area and any cycle access provided is on shared paths.
-
Manual for Streets update
The updated Manual for Streets is to be published on 1 July 2022.
-
Fanshawe Road new development. 44 Homes
Proposals for a new development on Fanshaw Road have been approved. A planning application is pending.
-
22/02520/FUL | Installation of 11 sculptures and 5 benches (temporary)
Proposed temporary installation of art structures than in some cases will create conflict and cause narrowing at certain points in the Cam tow path towards Waterbeach.
-
Fen Rivers Way north of Bottisham Lock
Google Maps suggests that Fen Rivers Way from Bottisham Lock to the A1123 is cyclable. It isn't.
-
Active Travel Fund Tranche 2 schemes (2022)
Cambridgeshire County Council, June 2022 (their web page): "A programme of Active Travel (Tranche 2) projects, to encourage walking and cycling across Cambridgeshire, is set to be delivered in the next few months. The Tranche 2 schemes will be installed on a temporary basis for up to 18 months."
The first part of the Tranche 2 delivery programme, to be delivered between June and August, includes the following active travel schemes (heavily summarised):
- Cambridge:
- Church Street, Chesterton - modal filter
- Cowley Road - new bidirectional wand-protected cycle lane
- East Road - wand-protected cycle lanes east of Burleigh St, by reducing traffic lanes
- Silver St / King's Parade - make previous temporary priority change permanent
- Trumpington St / Lensfield Rd / Fen Causeway mini-roundabouts - some wand-protected space for cyclists, etc
- Bassingbourn: Brook Road and High Street - speed reduction and traffic calming
- Huntingdon: Ambury Road, southern section - contra-flow cycle lane
- Wisbech: cycle lockers in Bus Station area
(And also some cycle parking around the county, in Buckden, Cottenham, Ely, Haddenham, Huntingdon, Little Thetford, Littleport, Melbourn, Mepal, Ramsey, St Ives, St Neots, Stretham, Whittlesey, Wisbech, and Witcham.)
- Cambridge:
-
Beehive Centre redevelopment
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
-
70 new postgraduate apartments plus refurb, Newnham | 22/02066/FUL
Demolition of nursery building, part of outbuildings; partial demolition, refurbishment and extension of other existing college buildings and the erection of four accommodation blocks containing 60 rooms for postgraduate students; associated landscaping, car and cycle parking, refuse and other storage and new electricity substation within outbuildings. | Owlstone Croft Owlstone Road Cambridge Cambridgeshire CB3 9JJ
-
garage conversion but no cycle parking, Highworth Avenue | 22/02020HFUL
Infill of existing carport area and garage conversion to create home office/guest accomodation. | 51A Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Narrow route through Verulamium park towards the museum needs widening to 3 metre width
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
-
Convert footpath Watling St to Coningsby Bank
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
-
Marshall Road shared use path
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
-
Pilton Park Cycle Route
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
-
Thames towpath - Richmond-Ham
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
-
Teddington - Broad Street - more cycle parking needed
The demand for cycle parking exceeds the supply in this important shopping area.
-
18-19 Regent Terrace planning applications 11/1375/FUL & 11/1376/CAC
11 flats replacing existing building
-
Bike-bus Sundays and Bank Holidays
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
-
Ring Fort Path
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
-
Proposed pedestrians and cycle facilities at Sulzers roundabout
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths. -
Green Dragon bridge closed for maintenance 6 January 2014 for 8 weeks
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
-
Visibility at Perne Road / Cherry Hinton Road junction
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
-
Jenning Road - Lemsford Road bridge link
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
-
Dutch Style Infrastructure for the end of Bristol to Bath Railway Path
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton StreetRationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
-
Cycle route frequently obstructed by cars
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
-
Off-road route to link end of footpath 32 bridleway conversion to Wheathampstead
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
-
Rushmoor and Surrey Cycling Strategy
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
-
All-green phase at Silver Street / Queen's Road junction
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
-
Improve Dual Carriageway, London Road, Copdock for cycling
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
-
Sign to cycle track would be useful here
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
-
Pedestrianise Clifton Triangle
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance -
Queens Roundabout Improvement Scheme
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
-
Tudor Drive / Dukes Ave / A307 Junction
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-1832. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
-
Cherry Hinton High Street cycle lanes need upgrading
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
-
Cable street cell 1
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area