Lincoln's lane car park crossing
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by George Lund // 1 thread
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
Created by Gabriel // 1 thread
The County Council is proposing some of those cheap and nasty speed cushions at Birdwood Rd. Link: https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-tro--reference-number-pr--------proposed-speed-cushions-in-birdwood-road--cambridge--9-0
Closing date for comment is 17 March 2023. Email to: policyandregulation@cambridgeshire.gov.uk
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a container issue for event threads.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cambridge City Council have launched this new consultation as part of the Our Cambridge programme which aims to shape the council of the future. This may be relevant to our work because it includes thinking about how the council works with its stakeholders.
sound+fury // 1 thread
A previous application was refused in part because of the cycle parking provision. What's the new one like?
Created by David Green // 1 thread
Are you confident at what to do if something goes wrong with your bike when you're miles from home? Could you repair a puncture by the side of the road? Yes? Great! No need to read on.
No? You may be interested in the following Saturday workshop I am running again. This will be a repeat of the popular workshop held last year where attendees gave feedback such as:
"Excellent - would recommend it to all inexperienced riders."
"Following the course I really feel I understand the workings of my cycle."
"It was very clearly explained and covered very useful topics."
"Thoroughly informative workshop. To be highly recommended."
David Green
===
Survival Skills for Cyclists
Venue: Coleridge Community College, Radegund Road, Cambridge CB1 3RJ
Date: Sat 25 March 2023, 10am to 4 pm
Description: A one day bike maintenance course for local cyclists. Bring your bike and get confident you can cope with common roadside cycling breakdowns. Women members especially encouraged to sign up! Places are limited to ensure you learn in a small friendly group and get all the assistance you need. Topics will include: checks before you set off, tools to take along, fixing punctures, handling chain problems, gear and brake adjustments.
Equipment: Your own bike to work on, pump, puncture repair kit, and any tools you normally ride with.
Refreshments: hot and cold drinks provided, but please bring your own lunch!
Fee: £20 (CTC and CamCycle members) £50 (non-members). Subsidy available for those on a low income - please don't be put off by the price. Primarily funded and supported by CTC Cambridge.
Enrolment: To book a place, email da...@guertler-green.co.uk with subject 'Survival Skills for Cyclists 25 March 2023'.
sound+fury // 1 thread
There's a proposal to use speed cushions to slow traffic down on Shelly Row and Albion Row.
Created by Marcus Howarth // 1 thread
Consultation:
London Borough of Sutton is considering installing a motorcycle barrier on the Spencer Road Entrance at Watercress Park to help prevent unlawful use by motorbikes and we are interested in hearing your views. The barriers are designed to allow pedestrians and those using mobility scooters and wheelchairs to enter but to stop motorcycles from gaining access.
We are aware that motorbikes regularly access the site via the Spencer Road entrance which can cause anti-social behaviour and safety issues. As part of the Council's commitment to improving the situation for local residents we propose to install an inhibitor gate.
Created by Marcus Howarth // 2 threads
(Last item on sheet)
Convert zebra crossing to a parallel crossing (one that allows cyclists to use it) near Mellows Park which would provide a continuous safe facility for cyclists. This would provide links to an existing contra flow cycle lane in Redford Avenue and a large residential area in Mellows Park, and a borough cycle route into Wallington district centre
Stafford Road Parallel crossing
These currently being negotiated by LBS with TfL - hopefully funding confirmed mid March 2023.
Created by Marcus Howarth // 2 threads
Created by Roxanne (CEO) // 1 thread
The new owners of Capital Park, Fulbourn, CB21 would like to meet and discuss any cycling issues relevant to the site.
Created by Martin Wheatley // 1 thread
On-road section of Greenway which is unpleasant and dangerous, and certainly not suitable for riders of all ages and levels of confidence, as it should be.
Created by linus // 1 thread
This is a joint Camden and Westminster consultation of the design of a short route of part of the longer Fitzrovia to Pimlico cycle route. https://westminstercycleways.co.uk/cleveland-street-cycleway.html
Westminster Council is leading on this project. Consultation closes 3 March. There will also be a drop-in community event about the plans from 3pm to 7.30pm on Tuesday 7 February 2023 at Fitzrovia Community Centre, 2 Foley Street, London W1W 6DL.
Created by Marcus Howarth // 1 thread
The current layout and building stock at Greenshaw are inefficient and energy intensive.
sound+fury // 1 thread
22/05108/SCRE | EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed development to provide up to 12,442 sqm of employment floorspace in a building up to 34 metres in height with associated car parking, cycle parking and landscaping. | Vitrum Building St Johns Innovation Park Cowley Road Cambridge Cambridgeshire CB4 0WS
Created by Marcus Howarth // 1 thread
The Council is proposing to introduce a traffic management scheme in Plough Lane junction with Collyer Avenue and Queenswood Avenue. We are proposing these measures in response to concerns raised by local residents in the area, ward councillors about traffic speed, noise, pollution, cut through traffic and road safety at the above mentioned junctions.
What is proposed?
The following measures are proposed:
What is the aim of the measures?
These measures aim to
From the 2023/24 and indicative 2024/25 programmes: (A) / Environment and Sustainable Transport Committee
Appendix 7 b) - this is getting (£ ,000's )
Perceived safety issues raised that vehicles are not stopping at the
existing zebra because vehicles are rat running to avoid Croydon
Road/A232 (red route). The zebra is located on a link between the two
roads being used for rat running so drivers are looking for the next road
entrance rather than at the zebra. The proposal is considering measures
to address through traffic issues - initial locations being investigated are
the junctions of Queenswood Avenue/Plough Lane and Collyer
Ave/Plough Lane (subject to consultation).
The proposal also includes consideration of a parallel low traffic cycle
route along Queenswood & Collyers Road as an alternative to the A232
Croydon Road which currently has no cycle facilities along the parallel
stretch. Cyclists using this quiet alternative link will be able to re-join the
A232 Croydon Road via Aldwick Rd which connects to the existing
Croydon Rd cycle facility. This element of the scheme could be moved to
the Cycle Network Development/Borough Cycling Fund.
Created by Robert Watson // 1 thread
Grange Road has extremely narrow cycle lanes for most of its length, which include traffic calming bollards forcing traffic down to a single lane. While this design does slow traffic, the narrow space for the cycle lane means that trikes have to slow almost to a stop to pass safely -- or in some cases may not fit at all. This forces trikes out into the single centre lane, where cars may not properly give way, and also are the sites of speed bumps and significant potholes. If the lanes were about 20-30cm wider, then trikes could pass without a problem. This issue affects all of the bollards on both sides of Grange Road for its full length, but I’ve highlighted a particularly problematic one since I had to pick a spot.
(In general, the cycle lanes on Grange Road are too narrow for cargo trikes forcing them out into traffic lanes anyway, but it’s the brick bases to the bollards that cause a particular problem.)
Created by Robert Watson // 1 thread
On the northeast side of the Trumpington Road and Brooklands Ave junction, there’s a combined cycle and foot path around the corner that suffers two problems that make trike use problematic in peak times:
Created by Robert Watson // 1 thread
Bollards close Storeys Way to through traffic while allowing cycles through. However, the bollard spacing makes it difficult to get cargo trikes through -- e.g., Nohila and Winther products.
Where the new wands on East road begin if heading from the Newmarket road underpass into East road is a layby outside Mackays. The placement of the wands initially mean there is insufficient room to cycle on the road, but the layby is potholed, making it difficult to ride through. After the layby the spacing is wider and they are much better.
Created by PHG // 1 thread
The new wands on East road force cyclists on to the pavement, rather than the roundabout, where East road meets Newmarket roundabout. Why should cyclists be blocked from using Newmarket roundabout, which is the easiest way to access the bus lane on Elizabeth Way bridge.
Pulling out of the wands early is dangerous and annoying. more annoying is when you forget and have to stop, or go onto the pavement and round to use the ramp.
Created by Anna Williams – Head of Campaigns & Engagement // 8 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by KW // 1 thread
Demolish and replace with terrace of three: conflicting bike store drawings, so which version already has permission?
sound+fury // 1 thread
Is this a cause for celebration?
Created by cpax // 3 threads
Like many other cyclists the majority being school pupils I have used the road between Perne Road and Tiverton Way as a way to avoid the traffic on Birdwood Road , however recently the work has begun to convert the bungalow and often with builders vehicles blocking the cycle path on Perne Road . Today I encountered a group of people gathered ( deep in discussion ) in the road adjacent to the empty site which lies closer to Tiverton Way and on hearing my cycle bell seemed reluctant to move . I am concerned that this could be a site for future conflict .
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Andrew Woodward // 1 thread
It would be useful to provide a route from east side of Kew Gardens station; via Burlington Avenue; along Mortlake Road and up the service road alongside the district line to the Thames Path. The service road is already closed to traffic; but cycling is obstructed by a large ugly concrete barrier (see photo). There is room on the north side of Mortlake Road for a short section of dedicated cycling space to link to the junction with Burlington Ave - see http://goo.gl/maps/DG7gh. The crossing could be problematic.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.