Unhappy pavement 'cyclepath'
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Debra Storr // 1 thread
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
Created by Debra Storr // 1 thread
Shared cyclepath fizzles out with a short length of a parallel roadway providing the infill. Uncomfortable.
Created by Debra Storr // 1 thread
This is a 40mph distributor road which is currently fairly quiet. But many houses are planned in this location. It would have been helpful if the pavement has been built a bit wider and designated as a shared path/cycleway. Even better would be an actual cycleway but we can press for that with the development.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Debra Storr // 1 thread
With a existing cyclepath on south-west of roundabout and a proposed cyclepath on the north east side, the issue of a crossing at the Murcar roundabout needs to be resolved.
Created by Debra Storr // 1 thread
While part of new Balmedie-Blackdog route is tarmac, the southern portion has been left as gravel/ground and will undoubtedly get worse in winter. Funds are being sought to improve.
Created by Debra Storr // 1 thread
Consultation open until 18th August 2019 on cycleway as shown.
Unresolved issue of connections into Blackdog from bus stop on dual carriageway and connection at Murcar onto existing shared cyclepath on west side of dual carriageway.
Created by Hounslow Cycling Campaign // 1 thread
The London Borough of Hounslow is consulting on the Local Plan Reviews for the Great West Corridor and West of Borough opportunity areas. The Local Plans set out planning guidelines for major developments in the respective areas. Each Plan includes a section on "Connecting People and Places" that covers transport aspects of developments.
Steve Curran, the Leader of Hounslow Council, refers to the negative impacts of major roads crossing the Great West Corridor area in his foreword. "Attractive alternatives to the private car" described in pp74-83 of the consultation document include improved walking and cycling infrastructure. Proposals for two new rail links will be rather more expensive.
Councillor Curran expresses concern about the environmental impact of a Third Runway at Heathrow Airport on the West of Borough area but also points out the regeneration opportunities. "Attractive alternatives to the private car" described in pp78-85 of the consultation document include improved cycling and walking infrastructure.
Reserved matters application pursuant to outline approval 06/0796/OUT (amended by Section 73 approval 17/2258/S73) for: an R and D Enabling Building of 13,197 sqm; an Amenities Hub of 3,261 sqm; associated car, motorbike and cycle parking including a Multi Storey Car Park; a temporary Multi Use Games Area; hard and soft landscaping; and internal roads, supporting facilities and ancillary infrastructure.
Astrazeneca Uk Ltd Cambridge Biomedical Campus Francis Crick Avenue Cambridge Cambridgeshire CB2 0AA
Cambridge
Application reference : 19/1070/REM
19/1010/FUL | Conversion and extensions to the existing buildings including demolition of the existing block to the rear of 1 Godesdone Road to deliver a mixed use development comprising a ground floor retail space and 12 1xbed residential units (net increase 9) to the rear and above along with cycle parking and associated infrastructure. | 185-189 Newmarket Road And 1 Godesdone Road Cambridge Cambridgeshire CB5 8HA
Martin Lucas-Smith // 1 thread
Creation of a cycle storage area equiped with racks to facilitate appprox 200 cycles following removal of a large white birch tree to undertake repairs to building caused by tree roots.
Robinson College, Porters Lodge Grange Road Cambridge CB3 9AN
Cambridge
Application reference : 19/0926/FUL
Demolition of existing flats 66-80b Colville Road and erection of 69 affordable dwellings, including 6 houses and 63 apartments, including resident and public car parking, landscaping and associated works
66-80B Colville Road Cambridge Cambridgeshire CB1 9EJ
Cambridge
Application reference : 19/1034/FUL
The A14 works have closed the east side pavement/cyclepath for some amount of time.
This either forces people to cross the rode via 4 toucan crossings (and cycle or walk up a very narrow stretch) which is technically not a cycle path I believe. Alternatively people have to cycle on road across a busy 2 lane 60mph limit roundabout.
sound+fury // 1 thread
Created by Peter Loader // 1 thread
Create an unsegregated cyclist/walker area in the paved area that was produced when the northern arm of Northway, Rickmansworth became traffic-free. Call it Northway Square. This would become the centre of Rickmansworth's cycling/walking network, with Bikeability level 2 routes leading:
* To National Cycle Network Route 61 (The Colne Valley Trail at the Aquadrome), to Mill End, and to Maple Cross.
* To Rickmansworth Station, to Chorleywood, and to The Cedars Estate,
* To Croxley Green, via Three Rivers District Council's car park.
Upgrade the existing public footpath to a bridleway so the route remains on the definitive map.
Martin Lucas-Smith // 1 thread
The section of East Road at the police station end, with the cycle lane, suffers from absolutely rife pavement parking and parking in the cycle lane.
Created by Alex Jenkins // 2 threads
The draft Tower Hamlets Transport Strategy aims to improve the way we move around our borough.
Tower Hamlets is one of the country's fastest growing boroughs. Our roads are the busiest in the UK.
77 per cent of our residents are exposed to unsafe pollution levels, children in the borough have on average up to ten per cent less lung capacity and 43 per cent of Year 6 school children are overweight or obese.
According to Public Health England, pollution is linked to increasing rates of asthma, heart disease, dementia, lung cancer and low birth weight.
The new strategy aims to address these concerns and look at what the council and residents can do to make travel cleaner, safer and accessible for everyone.
Promoting walking and cycling is at the heart of plans to help meet the Mayor of London’s target that 90 per cent of all trips in the borough should be made on foot, by cycle or by using public transport by 2041.
Over the next two months, the council will be asking all those who live and work in the borough to get involved, share their ideas and help shape the future of travel in Tower Hamlets.
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S/2413/17/OL as varied by Section 73 application S/4116/18/VC for the erection of up to 200 residential dwellings (including 40% affordable housing), demolition of no. 117 Rampton Road, introduction of structural planting and landscaping, informal public open space and children's play area, surface water flood mitigation and attenuation, vehicular access points from Rampton Road and associated ancillary works.
Land Off, Rampton Road, Cottenham, Cambridgeshire
South Cambridgeshire
Application reference : S/2549/19/RM
Tom McKeown // 1 thread
The mouth of Cotteham Road is wide and fast. How do we get this improved? Especially in the context of the new school.
Created by Martin Gorst // 1 thread
Ealing Council is consulting on a new scheme for the area outside Ealing Broadway station.
Reduction in Cycle Parking
As part of the scheme, Ealing Council plans to remove 59 cycle stands on and near Haven Green and replace them with 29 stands along the Broadway. This will remove parking for 60 bicycles. As Haven Green is common land, the cycle stands on the grass are only temporary. At some point they will need to be removed. Ealing Cycling Campaign has repeatedly urged the council to earmark a site near Ealing Broadway station for permanent cycle parking. A good location would be the car park along the south side of Haven Green. Unfortunately the council has still not been successful in acquiring the required land, and has not yet decided to instigate compulsory acquisition procedures, or otherwise escalate the process.
At times of peak demand, the cycle stands near Ealing Broadway fill up, and people lock bicycles to trees and other objects. With the arrival of the Elizabeth Line and the new cycleway to Greenford, the demand for cycle parking at the station will grow.
Where’s the Cycle Lane?
The new plans don’t include the contraflow cycle lane (below) the council promised six years ago.
For over 20 years Ealing Cycling Campaign has lobbied the council to build a contraflow cycle path to run along the east side of Haven Green (but not on the common) to link the Mall with the roundabout at Madeley Road. This will provide a direct route to and from Ealing Broadway station so people don’t have to cycle around the Arcadia Centre and Haven Green. In 2013, the council included the cycle path in its mini Holland plans. However, it has disappeared from the latest proposals. This goes against the council’s transport policy for its cycle network, which states: “Where one-way streets are implemented, the default position will be that contra-flow cycle lanes will be provided.”
sound+fury // 1 thread
The changes themselves are not controversial. (College doing some refurbishment of property for student use.) However, for a 7 bed house, they propose only 6 bike rack spaces.
Anon // 1 thread
We would like your views on suggested changes to the controlled parking zone on your road
In 2018 we asked you if would like us to make any changes to the Bermondsey CPZ 'G'
As part of this survey we sent out a total of 9,517 surveys and received a 4% response rate. 65% of those who responded wanted the current parking restrictions to be amended with 61% stating that they struggle to park on a Saturday. We would now like to know in detail the changes that you would like us to make.
We know, from the original survey and changes in the area such as residential developments and an increase in bars and restaurants, that parking stress has increased and we would like to know what changes you would make.
If we receive a majority in favour of amending the operating times and hours of Zone ‘G’ we will put forward a recommended amendment to the Cabinet Member for Environment, Transport and the Climate Emergency to make a final decision.
In addition to potential changes to the operating hours of the controlled parking zone we would also like to know if residents and businesses in the Shad Thames area would like their own separate zone. This would mean that permit holders in this area would have their own permits and would only be able to park in that area.
This decision would then be subject to statutory consultation.
What are the pros and cons of extending the operating hours of my parking zone?
Pros
Cons
If we were able to reduce the amount of vehicles parked in the area, we could consider introducing a variety of street improvements as detailed below:
Created by George Coulouris // 1 thread
Royal College Street works 8th July -16th August
The planters will be replaced by granite kerbs – affecting RCS south of Baynes Street.
The works will start on 8th July and are expected to be completed by 16th August 2019. During the works, northbound cyclists will be diverted to use the with-flow traffic lane whilst southbound cyclists will be diverted to use St Pancras Way.
We will keep you informed here as to which segment of the cycle track is currently unavailable.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Group looking at issues for active travel in the Chesterton area.
sound+fury // 1 thread
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by Andrea Bredel // 1 thread
this is one of many cycle lanes here in Ipswich that go on and off the road several times. This is very awkward for cyclists as they need to be very careful when getting back onto the road and most probably confuses drivers as well.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en