Needs proper dropped kerbs here
Poor set of partially dropped kerbs here across entrances to shell garages.
To get from the Toucan crossing of Maybury Road to North Gyle Terrace you have to bump down & up 2 sets of bad kerbs
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by HankChief // 0 threads
Poor set of partially dropped kerbs here across entrances to shell garages.
To get from the Toucan crossing of Maybury Road to North Gyle Terrace you have to bump down & up 2 sets of bad kerbs
Created by HankChief // 0 threads
Needs a dropped kerb to exit this cut-through onto the road
Created by Andrew Woodward // 0 threads
The section of the cycle network from Boileau Rd to Hammersmith Bridge is poorly signposted, inconvenient and suffers from poor subjective safety.
Created by HankChief // 0 threads
No dropped kerb to enter or exit the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to enter or exit the East Craigs Path Network.
Created by TMiles // 0 threads
St Michael's Road can be a useful local route for west-bound cyclists avoiding the central junction in Headingley and its approach roads, dominated by queuing traffic or parked cars.
The current configuration could be improved to allow cyclists approaching the junction to cross directly from St Michael's Rd into the cycle box immediately in front of the traffic lights at the northern extremity of Cardigan Road.
A dedicated traffic signal, coordinated with the parallel pedestrian crossing (to the extreme right of the image), would allow cyclists to cross from the island in the foreground to the advanced stop line in the far lane.
These improvements would require very little actual ground work, instead making use of smarter signal control. Further adjustments to the sequencing could see cyclists granted a synchronized left turn into Kirkstall Lane.
Created by timlennon // 0 threads
Facilities to cycle to school are extremely limited, mostly involving sharing pavements which are busy in the morning. Lots of dropping of by car in a very restricted area, and disjointed, incomplete routes, especially around the South Circular, where no-one really wants to cycle, least of all with children.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
This re-design (incl re-alignment) is a pure 1960s motorway scheme. Very disappointing.
Pedestrians and cyclists are virtually NOT considered here.
http://newcycling.org/sites/default/files/105_salters_church.pdf
Some rejigging
There some flaws in the design. Pedstrian desire lines are ignored leading to staggered / staged crossings. The whole design does not do much for the public realm in general and the area remains an 'urban motorway'.
The cycle lanes (width unknown) are an inadequate separation for the volume/speed of traffic and not even elephant footprints across to guide cyclists across the wide opening of the Regent bus stop entry have been included.
Regent Farm Road entry should be closed down.
We do not hold out much hope for the traffic light phasing. They will likely to be conventional highway design too.
Plan is downloadable here
http://newcycling.org/sites/default/files/104_regent_christon.pdf
Created by Katja Leyendecker // 0 threads
Major re-design
There are many flaws in this conventional highway road design. Pedestrian desire lines are disregarded. No cycle-specific light phasing has been included it seems. ASL are a token effort. No elephant footporints. But the biggest mistake is to keep the left-turn filter. It really puts cyclists directly at risk and in conflict with drivers - we urge council to remove that filter.
There also is a new right-turn lane into Knightsbridge which puts cyclists at risk of turning drivers. The entrance to Knightsbridge should also be necked-down for pedestrian and cyclist safety and comfort.
Plan is downloadable here
http://newcycling.org/sites/default/files/103_hollywood_pale_.pdf
Some re-adjustments. Includes cycle space and necking-down on Park Avenue are good.
Not so good is inconsistency in the cycle infrastructure design, and disregard to pedestrian desire lines over Park Avenue (which could be rectified by moving the raised table), and no necking-down of Harewood Road.
Plan is downloadable here
http://newcycling.org/sites/default/files/102_park_harewood.pdf
Created by Katja Leyendecker // 1 thread
Large scale re-design.
Looks okay, even quite innovative, some design clarificaitons are needed re: turning speeds / neckdowns, separation types, transitions
Plan is downloadable here http://newcycling.org/sites/default/files/101_broadway.pdf
Created by MJR // 1 thread
Downham Market has National Route 11 running through it roughly north-south but doesn't have much of a signposted cycle network otherwise. There are some useful cut-throughs so this looks like it could be an ideal market town for cycling with relatively little work.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
20 mph speed limit for Newport area, enclosed by the river Taw, The Square, Belle Meadow Road, Inner Relief Road, Hollowtree Road, South Street and Park Lane.
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit in Ashleigh Road area, especially on route Ashleigh Road-Barbican Lane
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath and widening to shared path on north side of Ashleigh Road Approach Road (requiring NEW lay out of one-way Approach Road, moving parking bays to disused opposite south side of Approach Road). Current vegetation can be replanted as buffer between new shared path and main carriageway, so nice look of road won't be affected.
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Inner Relief Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath and widening to shared path between Oakleigh Road and pelican crossing on Inner Relief Road
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath to shared space on triangle at start Summerland Street; natural feeding route on/off triangle to pelican crossing on Belle Meadow Road
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Belle Meadow Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath on east side of Queen Street and Queen Street Roundabout to shared path, from Hardaway Head to Pelican Crossing Belle Meadow Road (taking space from main carriage way)
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit in Chanters Hill area, especially on route Sunset Heights-Sowden Lane
Created by North Devon Cycling Forum // 0 threads
Upgrade wide footpath on south side of Bear Street into shared path between Alexandra Road and Sunset Heights
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)