Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
-
-
Ipswich Road roundabout
See link
-
PA 220317 GametBearingsHytheStationRoad
Demolition of Former Bearings Factory and Erection of New Building comprising 3 no. blocks over four and five storeys containing 65 no. Residential Apartments and 2 no. Commercial Units (Class E), with undercroft car parking.
-
22/00712: 2 storey building, Hills Road 6th form College, Hills Road
Construction of a new three storey educational building, including associated hard and soft landscaping.
Hills Road Sixth Form College Hills Road Cambridge Cambridgeshire CB2 8PE
Application reference: 22/00712/FUL
-
22/00655: retail unti & 3no. apartments, Burleigh Street
Demolition of Numbers 16 and 16A Burleigh Street and the construction of a three-storey building comprising a retail unit on the ground floor and 3 no. apartments on the first and second floors providing bin and cycle stores on land to the rear of the new retail unit and access to the proposed apartments will be from Burleigh Place, while the retail element will remain accessible from the front (i.e. Burleigh Street).
16 And 16A Burleigh Street Cambridge Cambridgeshire CB1 1DG
Application reference: 22/00655/FUL
-
PA 220192 220301 Chesterwell reserved matters
Needs better connection to Trinity School
-
PA 220235 220201 Ewer House
220235: Application to determine if prior approval is required for a proposed Change of Use from Commercial Businesss & Service (Use Class E) to Dwellinghouses (Use Class C3)
220201: Proposed roof conversion, including construction of new dormer windows and external fa¦ade upgrades to form 4 new apartments at Ewer House
PA_220201_44-46CrouchStRoof_01.txt, PA_220235_44-46CrouchSt_01.txt
-
PA 220247 20SirIsaacsWalk
Change of use to 2-bedroom dwelling
-
-
Barrier to trikes and trailers
this old fashioned barrier on a major cycleway needs a rethink
-
Obstruction to cycling
Kissing gate obstructs cycle route, especially for trailer and trikes
-
A1303 Little Wilbraham Road
This is a dangerous junction for people on bikes. How can it be improved?
-
[fixed] Ditton Meadows / Ditton Walk path blocked by fallen tree
The path / cut-through between Ditton Meadows and Ditton Walk (next to Ronald Rolph Court) is currently blocked by a fallen tree.
It's possible to squeeze under it with a standard bicycle if you're agile.
Looks like someone attempted to block the path with red/white tape at the southern entrance, but it's all come down of course. I didn't see any warning at the northern entrance.
There's a report on the County Council site (387287), but it's marked as 'closed' on the 21st Feb. Tree was still there on 22nd.
[later:] It was gone by 15 March (probably long before).
-
22/00293: extension to create 4 flats, 184 Thoday Street
22/00293/FUL | Two storey side, single storey rear and roof extension to create 4 flats
184 Thoday Street Cambridge CB1 3AX
Application reference: 22/00293/FUL
-
22/00583/FUL: 14no houses, Aragon Close and Sackville Close
Demolition of existing garages and hardstanding and erection of 14no houses (7 at Aragon Close and 7 at Sackville Close) together with car parking, green space, landscaping, bin and bike stores and associated infrastructure.
Land At Aragon Close And Sackville Close Cambridge Cambridgeshire
Cambridge
Application reference : 22/00583/FUL
-
22/00469/FUL: 2bed bungalow to the rear of 157 Green End Road
Erection of 2bed bungalow to the rear of 157 Green End Road
157 Green End Road Cambridge CB4 1RW
Cambridge
Application reference : 22/00469/FUL
-
19/1453/CONDA: conditions of planning permission 19/1453/FUL Shah Jalal Mosque.
Submission of details required by conditions 10 (Cycle Parking layout) and 15 (Traffic Management Plan) of planning permission 19/1453/FUL.
107 Shah Jalal Mosque Darwin Drive Cambridge Cambridgeshire CB4 3HQ
Cambridge
-
East Road/Mill Road junction not detecting cyclists
A member of the public has informed us that the signals at the junction of East Road and Mill Road are not detecting people on bikes on the lane in front of the fire station heading east on Mill Road. Has anyone else experienced this? We can get an email to the signals team.
-
PA 212680 81HalsteadRdFlats 01
Outline application to demolish existing dwelling and construct 6 No. 1 bedroom, 2 storey flats with associated works to garden and parking area
-
Queen's Crescent Area Scheme Public Consultation
Following consultation in January 2021, Camden put in a trial scheme using ETOs in May 2021.
The main features of the trial scheme were:
- a pedestrianised section in Queen’s Crescent between Basset Street and Weedington Road (south)
plus closures at QC on the side roads Allcroft Road and Weedington Road (north) - a road closure on Grafton Road outside Carlton School (just north of its intersection with Queen’s Crescent).
Camden is now proposing to make the scheme permanent but with the following changes:
- shorten the pedestrianised section of Queen’s Crescent to between Allcroft Road and Weedington Road (south)
- move the Grafton Road closure further north (just north of Crestsield Close)
These changes still ensure no rat-running on Grafton Road and on Queen’s Crescent, which is very important for cycling since C6 runs along Grafton Road and Queen’s Crescent provides a useful route to it from the western end of Prince of Wales Road (although cycling though isn’t convenient on market days).
Camden’s stated motivations for the changes in QC are
- more parking and loading opportunities, in response to issues raised by businesses.
- to improve access for motor vehicles
Other proposed additions:
- wider footways and continuous footways across several side road junctions
- new sinusoidal ramp on Grafton Road by the bend near Vicars Road.
- new seating, trees and bikehangars
- a pedestrianised section in Queen’s Crescent between Basset Street and Weedington Road (south)
-
Caxton Gibbet to Papworth Everard
Not a problem, but rather out of the blue a mile-long shared-use path is being constructed along the A1198 from Papworth Everard to Caxton Gibbet, to connect with the existing route to Cambourne and Cambridge. Did we know about this? What consultations took place?
-
PA 220150 HedgeDrive3 01
Redevelopment of site to involve the demolition of the existing garages on site, and provision of 3 no. new dwellings
-
PA 220148 CrossCottBoxted7 01
Redevelopment of site to create 7 no. new residential units
-
PA 220147 220149 220155 220153 220154 Greenstead garages
220154: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220153: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220155: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220149: Redevelopment of site to involve the demolition of the existing garages on site, and provision of 3 no. new dwellings
220147: Demolition of existing garages and redevelopment of site to provide 6 x 2 bedroom flats
-
PA 220107 48WimpoleRdHMO
The application proposes: 1. Change of use of the property from C3 to Sui Generis 2. Creation of a High Standards House in Multiple Occupation for 8no. Occupants consisting in 8no. bedrooms, 8no. en- suites, 1no. shared toilet and one communal area 3. G
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Narrow route through Verulamium park towards the museum needs widening to 3 metre width
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
-
Convert footpath Watling St to Coningsby Bank
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
-
Marshall Road shared use path
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
-
Pilton Park Cycle Route
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
-
Thames towpath - Richmond-Ham
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
-
Teddington - Broad Street - more cycle parking needed
The demand for cycle parking exceeds the supply in this important shopping area.
-
18-19 Regent Terrace planning applications 11/1375/FUL & 11/1376/CAC
11 flats replacing existing building
-
Bike-bus Sundays and Bank Holidays
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
-
Ring Fort Path
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
-
Proposed pedestrians and cycle facilities at Sulzers roundabout
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths. -
Green Dragon bridge closed for maintenance 6 January 2014 for 8 weeks
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
-
Visibility at Perne Road / Cherry Hinton Road junction
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
-
Jenning Road - Lemsford Road bridge link
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
-
Dutch Style Infrastructure for the end of Bristol to Bath Railway Path
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton StreetRationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
-
Cycle route frequently obstructed by cars
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
-
Off-road route to link end of footpath 32 bridleway conversion to Wheathampstead
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
-
Rushmoor and Surrey Cycling Strategy
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
-
All-green phase at Silver Street / Queen's Road junction
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
-
Improve Dual Carriageway, London Road, Copdock for cycling
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
-
Sign to cycle track would be useful here
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
-
Pedestrianise Clifton Triangle
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance -
Queens Roundabout Improvement Scheme
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
-
Tudor Drive / Dukes Ave / A307 Junction
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-1832. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
-
Cherry Hinton High Street cycle lanes need upgrading
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
-
Cable street cell 1
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area