Buxhall School/Greanleas cycleway
A new path is being added to the west side of the B1049 to connect the Greanleas estate to the Buxhall farm school. It is too narrow for shared used. Can we improve this?
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Tom McKeown // 1 thread
A new path is being added to the west side of the B1049 to connect the Greanleas estate to the Buxhall farm school. It is too narrow for shared used. Can we improve this?
Created by timlennon // 1 thread
Thread for LBRUT consultation on thr Active Travel Strategy
Created by User 3090 (deleted) // 1 thread
Cycle lane ends shortly after Hazel Court travelling southbound on James Street, road surface and traffic gets worse on approach to Lawrence Street junction. Feels dangerous when travelling at rush hour with lorries, construction traffic and buses passing closely.
Created by User 3090 (deleted) // 1 thread
Pavement on west side of James Street is signposted for shared use by cyclists and pedestrians, but is far to narrow and not clearly marked out into lanes.
Created by Alex Jenkins // 1 thread
The borough is consulting on proposals for the Bethnal Green Liveable Streets scheme: https://www.pclconsult.co.uk/liveablestreetsbethnalgreen/consultation/
Created by Colin dixon // 1 thread
Leaves on cycle path a disgrace. Cycle paths are never correctly looked after. I came off bike yesterday slipping on leaves and have broken clavicle
Demolition of existing buildings and proposed development of nine residential apartments, landscaping and associated works.
15 & 16 Emmanuel Road Cambridge Cambridgeshire CB1 1JW
Cambridge
Application reference : 19/1361/FUL
Anon // 1 thread
Our Healthy WalworthLow Emission Neighbourhood
How can we make the Walworth area healthier and more pleasant for local people?
Less pollution, places you can enjoy, less through traffic, better bus journeys, safer walking and cycling, more attractive shopping and leisure: these could be some of the benefits of the Low Emission Neighbourhood.
Phase 1: 7 October to 7 December 2019
We’re asking you what the local issues are and what improvements you would like to see on your local streets. Click on the online map, answer a few short questions and tell us about traffic and other problems down your street.
Anon // 1 thread
Overview
We want to know your views on our design proposals for a landmark development at Southwark station.
Background
In June 2019 we asked for your thoughts on our vision for the area bounded by Blackfriars Road, The Cut, Hatfields and Isabella Street. Your feedback has been used to inform the proposed designs.
We are working with the London Borough of Southwark (LBS) and the Styles House Tenant Management Organisation (TMO) to progress designs for new council homes, offices, new public realm and shared space.
Anon // 1 thread
Overview
We would like your views and ideas on proposals to improve bus journey times along Denmark Hill.
The bus lanes are on a hill in this section and it has been observed that cyclists can hold up buses, as the lane is currently too narrow for buses to safely overtake cyclists travelling up the hill.
In order to improve this, we are proposing to widen some sections of the bus lane between Champion Hill and Sunray Avenue, with priority given to the uphill sections. These proposals should improve journey times for passengers using the 42, 68 and 468 bus routes. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.
To widen the bus lane and still maintain the carriageway width for other vehicles, we plan to
To improve conditions for pedestrians, we plan to
We will also be extending the low level planting by Ruskin Park.
Please see the plans of these proposals below.
We would appreciate your views on these plans, and whether there are any issues that we should take note of.
Created by Jean Dollimore // 1 thread
Camden's Main Proposals
Created by Stuart Johnson // 1 thread
Currently there is no entry from Creffield Road to Maldon Road, this means cyclists have to divert via Inglis Road which is a poor junction for cyclists. A request has been submitted for changes to the juction to let cyclists enter Maldon Road from Creffield Road. It's understood that Cllr Sue Lissimore has subimtted this to the Local Highways Panel (LHP).
Created by George Coulouris // 1 thread
We have recently received several reports about obstructions on the eastbound cycle track on Tavistock Place by food stalls. I'd like to collect some images and see how persistent the problem is before reporting to the Council.
Created by Martin Gorst // 1 thread
This proposal changes a signalised junction into a roundabout. On each of the three roads leading into the roundabout there will be a Zebra crossing with a parallel cycle crossing. Two of the zebra/cycle crossing will be across a dual carriageway.
Hybrid planning application comprising; a) Reserved matters for 406 dwellings including affordable housing provision, non-residential floorspace, landscaping, open space and associated infrastructure (the Reserved Matters include access, appearance, landscaping, layout and scale following outline planning permission S/2011/14/OL); b) Discharge of conditions 9 (Design code), 10 (Fire strategy), 11(Housing (Market mix)), 12 (Housing - Lifetime Homes (Affordable and market dwellings)), 19 (Surface water Drainage), 20 (Foul Water drainage), 23(Landscape and design), 24 (Landscape Management and Maintenance plan), 27 (Ecological Management plan), 31 (Longstanton conservation area), 32 (Low Carbon Strategy), 33 (Energy delivery strategy), 34 (BREEAM Standards), 38 (Unexploded Ordnance (UXO)), 41(External Artificial Lighting), 42 (Operational Noise - Non Residential use classes), 43 (Operational Traffic Noise Mitigation Scheme on-site), 45 (Waste & Recycling Management Strategy), 48 (Transport - Equine, Walking and Cycling Routes), 57(Transport - Cycle parking) and 64 (Self-build and custom build) pursuant to outline planning permission S/2011/14/OL and c) Full planning permission for the temporary change of use of two dwellings to show homes.
Phase 2A, Land South of Longstanton Road, Northstowe, CB24 3AB
South Cambridgeshire
Application reference : S/3499/19/RM
Created by Mark Troll // 1 thread
A friend of mine had a head-on collision with an invisible , un-lit cyclist on the DNA trail about 2 months ago. The end of his handlebar went through his face, breaking his jaw and many facial bones, and he also had serious damage to his hip and leg. He was in hospital for about 2 months, and was very nearly paralyzed. As many of you know, the trail is narrow and very dark at night, when many people are coming home from the Adenbrookes campus. I am trying to persuade the County Council to make the path wider (there is a total of 17 feet on either side) and have it lighted with overhead lighting (solar powered ones are commercially available). Please let your County Council person know, and also please consider signing the petition at:
I really want to reduce the chances that others will be injured on this heavily used path
Created by Jean Dollimore // 1 thread
Camden is consulting on proposals to increase permeability for cycling in the following locations
Laystall Street
Mornington Terrace
South Grove
Chetwynd Road and Grove Terrace
Gaisford Street and Patshull Road
These consultations are not on Camden’s website but I will attached PDFs for each one.
Created by Jean Dollimore // 1 thread
This consultation proposes a cycling and walking link between St Augustine’s Road and Cliff Villas, the location of Brecknock Primary School.
They mention connection to the proposed cycle route between Camden and Tottenham Hale that Transport for London will be consulting on in 2020 which is a very valid point even if we’re not sure of its alignment.
Hamish F // 1 thread
Top level issue for consultations and other threads related to Quieter Neighbourhoods in Enfield
Created by Marcus Howarth // 1 thread
https://sutton.citizenspace.com/environment/stheliercycleway/consult_view/
CYCLEWAY BETWEEN SUTTON HIGH STREET AND COLLIERS WOOD - PROPOSALS IN THE ST. HELIER AREA
this consultation only relates to the northern section of the route (in the St Helier area) just about 1km in length
Created by David Lincoln // 1 thread
Islington Council is proposing to make road safety improvements to reduce traffic speeds on Baring Street to tackle speeding issue for the safety of the community.
We are seeking your views on the council’s proposals to implement the following:
Often talked about
aspiration in FifePlan
Created by M Stanley // 1 thread
West Yorkshire combined authority are consulting on improvements to cycling and walking links in Pudsey with the aim of improving access to New Pudsey station
Anon // 1 thread
Borough Road - Healthy Streets
Closes 4 Nov 2019
Opened 8 Oct 2019
Contact
Joanna Lesak
(Project Manager)
Overview
We would like to know your views on proposals for Borough Road. We are proposing improvements to the environment to encourage cycling and walking in line with the Healthy Streets approach. Borough Road is part of London's wider strategic cycle network as well as the council's Southwark Spine route, and together with Harper Road links Cycleway 6 at St George's Circus to Cycleway 17 at Falmouth Road creating a strategic east-west route.
The key measures proposed are
Please respond to the online questionnaire below by 4 November 2019.
Background
In 2014 over 1400 people in Southwark were consulted by the council on cycling, and the proposed Southwark Spine cycle route was a key feature of the proposals, linking the north and south of the borough. The 2015 cycle strategy subsequently identified the Southwark Spine as a key deliverable to offer a direct, safe, attractive, comfortable and easy cycle route, for all ages and abilities.
Borough Road and Harper Road comprise the northern section of the Southwark Spine. Street improvements in Harper Road between the junction with Borough Road and Falmouth Road have been consulted on separately to link in with the proposed refurbishment of Dickens Square Park; a link to the informal consultation and updates on timescales of projects in the area are provided in www.southwark.gov.uk/harperroad.
Why We Are Consulting
We have identified a number of issues with the current road layouts that make Borough Road and Harper Road feel unsafe and intimidating for vulnerable road users, particularly cyclists, and that affect bus journey times.
Our proposals
We would like your views on the following proposals which aim to reduce these issues.
The proposals improve Healthy Street indicators including making it easier to cross the road, improving the environment for pedestrians from all walks of life, helping people feel relaxed and safe, and encouraging people to walk, cycle and use public transport. The results of the draft Healthy Streets check (subject to change) are shown in the spider graph below
Well used, but narrow, path.
Downhill section owned by FC, rest Forth Ports.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.