Cherry Hinton Hall
Cherry Hinton Hall is a house and park in Cherry Hinton (south Cambridge). The house and grounds are owned and managed by Cambridge City Council.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cherry Hinton Hall is a house and park in Cherry Hinton (south Cambridge). The house and grounds are owned and managed by Cambridge City Council.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03912/FUL | Residential development containing eight flats along with access, car parking, landscaping and infrastructure | Land Rear Of Gibson House Paradise Street Cambridge Cambridgeshire CB1 1DJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03838/FUL | Demolition of existing house and the erection of 3 No. dwellings | 38 High Street Chesterton Cambridge CB4 1NG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03877/FUL | Change of use from residential (C3) to large scale HMO for 12 persons (Sui Generis)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03966/FUL | Change of use from one dwelling to four flats, single storey rear extension and external alterations. | 1 Blackhall Road Cambridge CB4 3NJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
New thread for committee meetings
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03034/FUL | Erection of new 2-Bedroom house adjoining existing house (number 168 New Street). | 168 New Street Cambridge CB1 2QX
Tom McKeown // 1 thread
Demolition of existing buildings comprising Anglia House, Kendal House inc. flats above, Regency House and Marble Store to rear and 1 Cambridge Road inc. flats above; redevelopment of the site comprising 28 new-build Class C3 residential units, and associated parking, 2no. A1 use class commercial units at ground floor level, inc. 2no. commercial parking parking spaces; proposed new landscaping and public realm improvements to Cambridge Road.
Land Comprising, Kendal Court, Anglia House, Kendal House, Regency House And 1 Cambridge Raod Cambridge Road Impington Cambridge CB24 9YS
Cambridge
Application reference : 20/03742/FUL
The former level crossing near a petrol station and the Strikes bowling alley is a frequent source of conflict between cycling and motoring. As of 2020, this is a toucan crossing just west of the former railway's line, necessitating cyclists to slalom across it. There are short cycleways on the south side of the A148 Lynn Road and Gaywood Road providing access to the main entrance of King Edward School.
20/02728/REM | Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/3064/16/OL for 155 dwellings following demolition of two existing dwellings | Land South Of 279 St Neots Road Hardwick Cambridgeshire
Created by Paul Robison // 1 thread
Storey's Way open again to through traffic
Created by Steven Moseley // 2 threads
Development of 153 dwellings with associated parking, landscaping, open space, drainage and infrastructure and formation of new access and alterations to existing access onto Berechurch Hall Road.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases, in line with government guidance on the Covid-19 response. Walworth has been identified as a priority area.
We are installing experimental measures below to create a low-traffic neighbourhood and re-purpose the street space for the pedestrians, cyclists, the local community and businesses:
- Permeable closures (these are streets closed to motor vehicles but open to pedestrians and cyclists) on: Larcom Street, Browning Street, Merrow Street, Amelia Street, Alberta Street, Iliffe Street, Penton Place, Chapter Road, Cooks Road, Blackwood Street and Walworth Place.
- Introducing a bus gate on Carter Street and Manor Place.
- Footway widening on Braganza Street and Carter Street.
- Introducing a one-way system on Braganza Street Westbound only, and reversing the one-way system on Chapter Road to Northbound only.
We want to hear from you about the effects of these measures.
Created by James London Cyclist // 0 threads
Rye Lane will be closed to motor traffic from 6 July to allow more space for social distancing for shoppers, cyclists and pedestrians, and to ensure the works around Peckham Rye station can be carried out safely at the same time.
We want to hear from you about the effects of this closures.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases. The East Dulwich are has been identified as a priority.
On the 30 June we installed Phase 1 of the East Dulwich Streetspace measures, which is a permeable road closure (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove, south of Tell Grove.
The East Dulwich Streetspace Phase 2 measures will be installed on 3rd September. Details of these are below and aim to re-purpose the street space for pedestrians, cyclists and the local community:
• a permeable closure using planters (a closure to all motor vehicles but not to cycles or pedestrians) on Melbourne Grove at the junction with Grove Vale
• a permeable closure using planters on Derwent Grove at the junction with Grove Vale
• a permeable closure using planters on Elsie Road at the junction with Grove Vale
• a permeable closure using planters on Tintagel Crescent at the junction with Grove Vale
• a school street closure during school drop-off and pick-up on Tintagel Crescent and Elsie Road (residents and emergency services will still be permitted entry)
We want to hear from you about the effects of these measures.
Created by James London Cyclist // 0 threads
Southwark is committed to quickly rolling out schemes to make travel safe and healthy as lockdown eases. Dulwich has been identified as a priority.
We have now installed the experimental measures below to re-purpose the street space for pedestrians, cyclists, the local community and businesses:
- a closure of Calton Avenue south of Gilkes Crescent
- a closure on Court Lane at the Calton Avenue junction
- a closure of Calton Avenue at the Dulwich Village junction
We want to hear from you about the effects of these closures.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Greater Cambridge Partnership operates as a Joint Committee, under powers delegated by its three local authority partners.
It is led by a decision-making Executive Board which coordinates the overall strategic vision and drives forward the partnership’s programme of work. It is run in accordance with a clear governance structure, agreed by all partners.
The Executive Board is made up of one representative from each of the City Deal partners. While the law governing Joint Committees only allows the three local authority representatives voting rights, they consider the advice of the other representatives, to make sure decisions also represent the business and academic sectors.
The Board is advised and informed by a Joint Assembly. The Joint Assembly provides advice to the Executive Board, drawing on the broad expertise of its 15 members. The Assembly’s membership is made up of three elected councillors from each of the three councils in the Greater Cambridge area, and reflects the political composition of their council. The other City Deal partners each nominate three representatives, as stakeholders from a range of organisations within the fields of business and academia.
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Issues related to Milton being worked on by Milton Cycling Campaign, a new group formed by Camcycle members living in the village.
Created by Heather Coleman // 1 thread
There's a wet greasy line the length of the southbound carriageway on Hills Road between OLEM and Station Road, just outside the bike lane. When I cycled down there around 8.50am there was a very strong smell of diesel.
TAKE CARE. Diesel doesn't just evaporate as petrol would but leaves a greasy slippery residue that can persist for some days.
I've tried reporting to County, who don't want to know. I've bounced the report to City; who knows if they will do anything or say it's not their problem either.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Planning and Transport Scrutiny Committee consists of nine councillors who scrutinise the decisions of the Executive Councillor for Planning Policy and Open Spaces and the Executive Councillor for Transport and Community Safety.
20/03523/FUL | Erection of a 5 storey building and a 6 storey building for commercial/business purposes, erection of a transport hub, gymnasium, surface parking, landscaping and associated infrastructure including demolition of the existing building (St John's House) and associated structures. | Land In The North West Part Of The St Johns Innovation Park Cowley Road Milton Cambridge Cambridgeshire CB4 0ZT
Residential development of 75 dwellings along with access, car parking, landscaping and all associated infrastructure
Development Parcel L2 Topper Street Orchard Park Cambridge Cambridgeshire
Cambridge
Application reference : 20/03802/FUL
Tom McKeown // 1 thread
Redevelopment of land off Home Close and within the boundary of the Hain Daniels Group factory, in Histon, Cambridge, CB24 9NR. McCarthy & Stone’s initial plans propose to redevelop the site with Retirement Plus (Extra Care) accommodation with 65 apartments, 36 bungalows and seven cottages, all set within attractive landscaped gardens and with 45 on-site car parking bays.
A virtual consultation is available at https://mccarthyandstoneconsultation.co.uk/histon/proposals/ between Wednesday 16th September – Wednesday 23rd September 2020, looking for community feedback ahead of formal planning application.
Created by MJR // 0 threads
The Hardwick Road cycleway abruptly terminates at the corner of Beech Road, within sight of the next section at South Gates roundabout. Cyclists wishing to continue towards town without being obstructed by motorists need to either use six beg-button crossings of the A149 Hardwick Road to cross over and back, or use four beg-button crossings to head towards Hardings Way (where another three beg-buttons and currently a dismount greets them), or they can illegally slalom contraflow through a parking bay, footway and oncoming traffic - and unsurprisingly many do the latter.
All of the houses by the parking bay blocking the way have their own drives and it is not that much used. It could be repainted as a two-way cycleway, protected with posts and the slopes into the ends made shallower.
Created by MJR // 0 threads
A cycleway was built alongside Scania Way, but it is dangerous in many ways, including:
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.