20/01979/PRI03M - change of use, new dwelling
Prior approval for a change of use from Class A1 to Class C3 to become a dwelling. | 153 High Street Chesterton Cambridge CB4 1NL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Prior approval for a change of use from Class A1 to Class C3 to become a dwelling. | 153 High Street Chesterton Cambridge CB4 1NL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 68 dwellings. | National Institute Of Agricultural Botany Huntingdon Road Cambridge CB3 0LE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 87 2bedroomed apartments, flanking a new public park to the south of Anstey Hall in order to provide assisted-living accommodation for people over 65. The Listed house will be adapted to serve as the central facilities for the retirement community. | Anstey Hall Maris Lane Cambridge Cambridgeshire CB2 9LG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no 2bed semi-detached dwellings with associated external works and drainage, with access via existing parking area at Trefoil Terrace. | Trefoil Terrace Budleigh Close Cambridge CB1 3BJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing single storey bungalow and erection of a terrace of 3no. 3bedroom houses along with new parking arrangements and associated works. | 248 Coldhams Lane Cambridge CB1 3HN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Subdivision of 1 Marshall Road, Cambridge to form two dwellings | 1 Marshall Road Cambridge CB1 7TY
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from staff accommodation to Large HMO (9 person). | Flat 111 - 113 Mill Road Cambridge Cambridgeshire CB1 2AZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 1no 2bedroom plus study unit. | 32 Newnham Road Cambridge CB3 9EY
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of new one bedroom dwelling on land to the rear of 95 Cherry Hinton Road Cambridge Cambridgeshire CB1 7BS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Application for demolition of existing and construction of 9 dwellings and associated external works.
P4 of Design and Access Statement states: 'Covered & secure cycle spaces are illustrated on the drawing and under current standard guidelines for new residences. They are generally near the entrances to each flat or available for visitors.'
However, 'Sheffield hoop under stair' is only indication I can see on site plan, so looks as though they are light on detail here and difficult to see if sufficient provision will be made for cycles.
Documents here:
Created by Charles Harvey // 1 thread
I have had an enquiry about cycle contraflows in the London Borough of Barnet. The only one I am aware of is in Church Lane in East Finchley. Is anyone aware of any others?
Created by Roxanne (CEO) // 1 thread
What can be done to make the Coldhams Lane roundabout safer for all road users?
Created by Steven Moseley // 1 thread
Turnstone Estates is pleased to present updated plans for a state of the art leisure facility at the Northern Gateway, Colchester. We want the local community to be able to have their say in advance of a revised planning application being made to Colchester Borough Council. This is to ensure that local input can be fully considered and addressed prior to the submission of the updated application.
Created by Roxanne (CEO) // 1 thread
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 2 studio apartments and 31 x 1bed units.
509 Coldhams Lane Cambridge CB1 3JS
Cambridge
Application reference : 20/02072/PRI03O
Created by Stuart Johnson // 1 thread
Feedback provided to ECC Highways on poor quality cycle infrastructure added to Layer Road, Colchester in Q1 2020
Created by Roxanne (CEO) // 1 thread
Constitution and Ethics Committee
Date/Time: 22 Apr 2020 - 14:00 to 16:00
Virtual Meeting
The County Council's Constitution and Ethics Committee is asked to recommend the changes to the County Council Constitution, as set out in the report, to full Council:
i) the abolition of the Economy and Environment and Highways and Infrastructure Committees;
ii) the introduction of the Environment and Sustainability and Highways and Transport Committees;
iii) revisions to the terms of reference of the General Purposes, Adults, Children and Young People, Commercial and Investment, Communities and Partnership and Health Committees;
iv) the abolition of the Cambridge Joint Area Committee by the end of July 2020 following the discussions set out in paragraph 3.3 of this report;
v) the withdrawal from the Joint Development Control Committee for Cambridge Fringes by the end of July 2020 following the discussions set out in paragraph 4.4 of this report; and
vi) increase the membership of General Purposes Committee from fifteen to seventeen.
Outline application (all matters reserved except for means of Access) for the erection of up to 200 residential dwellings, with associated infrastructure works, including access (vehicular, pedestrian and cycle), drainage, public open space and landscape.
Netherhall Farm Worts Causeway Cambridge CB1 8RJ
Cambridge
Application reference : 20/01972/OUT
Created by Roxanne (CEO) // 5 threads
Campaigning for cycling during the 2020 Coronavirus pandemic. What temporary changes should we campaign for? What longer-term changes should we be pushing for now?
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Proposed conversion and extension of an existing HMO with one self contained flat into 6 x 1 bedroom self contained flats.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor rear extension and demolition of outbuildings to the rear & construction of new 1 person single storey dwelling.
Created by Alan Everitt // 1 thread
Hardwick is seen as a commuter village for Cambridge but currently there are no cycle paths at all within the village, other than a 2 mile long on-road advisory shared with 40 mph traffic. There is also no cycle path north-south through the village - just over a mile. This is a village of around 1250 homes currently being extended to around 1500 but with little attention being paid to cycling yet.
In the S.106 Agreement for West Cambourne construction (2350 homes), SCDC Planning Reference S/2903/14/OL, Cambridge County Council have included an upgraded Cycle and footpath from West Cambourne to Cambridge passing through Hardwick. This can be seen in the S.106 Agreement Schedule 13 and is shown as Fully Funded in the current Cambridge County Council Transport Investment Plan, Scheme number 123.
Before construction of this goes ahead, will there be consultation with villages and residents along the route and do we have any indication of when this might commence? I note there should be plans available but these plans should be readable, clarified and modified with input from the villages on the route including Hardwick.
In the original plan submitted it seems the cycle paths proposed pass directly in front of 150 or so businesses and residential properties accesses and driveways which would seem to be entirely inappropriate for serious cycle-to-work opportunities.
This route appears to be independent from the Cambridge County Council "Greenways" initiative which also did not engage with Hardwick either
.
Martin Lucas-Smith // 1 thread
The section of Park Terrace behind the hotel is wide enough for a cycle contraflow.
Although people can cycle in front of the pavilion, this is shared use and can be busy with pedestrians. It also means encountering traffic lights involving a wait unnecessarily.
Given that there is space, there seems no good reason not to provide a contraflow - in line with the principle that two-way cycling should be possible unless there is no space to do so.
Created by Pearl // 1 thread
A discussion about the Dept for Transport's new Call for Evidence about changing the law regarding e-scooters and other similar vehicles. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/873363/future-of-transport-regulatory-review-call-for-evidence.pdf
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/2903/14/OL for 286 No. dwellings including affordable housing, associated hard and soft landscaping and all ancillary works.
Parcels 1.3B, 1.3C, 1.3E, 1.4A And 1.4B Sheepfold Lane Cambourne Cambs CB23 6EA
Cambridge
Application reference : 20/01640/REM
Created by Roxanne (CEO) // 1 thread
The County Council would like to know our opinion on allowing motorcycles to use bus lanes.
Motorcycling has become increasingly popular as it is a cheaper alternative than travelling by car, it provides independence and mobility and reduces journey times and emissions on congested roads.
As part of the climate change strategy action plan, the County Council at its meeting on 19th December 2019, agreed to consult on the use of bus lanes for motorcycles and scooters, collectively referred to as powered-two-wheelers.
Over 30 UK towns and cities permit motorcycles in bus lanes since the original trials in London back in 2009 and 2011 demonstrated reduced journey times and environmental benefits with no significant safety issues for motorcyclists or other vulnerable road users.
We would therefore welcome your views on whether you support the use of bus lanes by powered-two-wheelers, these together with any additional comments should be sent in writing to the undersigned or by email to policyandregulation@cambridgeshire.gov.uk by 10th April 2020 quoting reference PTWBus.
The feedback we receive will help us understand the level of support for the scheme.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by MJR // 2 threads
There was a Heritage Lottery Fund stage 1 project hoping to progress to stage 2 and work for 5 years from June 2014 to regenerate the "old town" around the Saturday Market Place. The initial draft contains no cycle measures but does mention cycle access policy, so may be persuaded to reinstate lost public cycle parking in places like opposite the old Post Office and might even be a way to fill in the missing link in National Cycle Network Route 1. The consultation papers are online at http://www.west-norfolk.gov.uk/default.aspx?page=26919 and open until 16 December.
The key cycling problem in this area is the difficulty of accessing Saturday Market Place without passing through the poor junction at its east end and the lack of signs telling cyclists to use Priory Lane to reach SMP.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by David Wilcox // 0 threads
Proposal
Improve the public realm of Old Market
Rationale
Old Market functions as the primary eastern entrance and maintains one of the most important historical collections of historic buildings in the city. Its unique character, central location and distinct identity make it an ideal place for regeneration. To encourage investment and regeneration, a scheme is proposed which seeks a reworking of the buses to provide stops at the edge of the street along with wider footpaths, cycle facilities and de-cluttering of signage and lining and a higher quality public realm.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.