21/00772/OUT | A hybrid planning application next to ARM
Substantial proposed development next to the Technology Park on Fulbourn Road (ARM).
181 documents.
Lots of bike parking, mostly in double stackers.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by KW // 1 thread
Substantial proposed development next to the Technology Park on Fulbourn Road (ARM).
181 documents.
Lots of bike parking, mostly in double stackers.
Created by Gabriel // 1 thread
The plans for the improved shared pavement between Waterbeach and Milton have been added to the planning portal. Planning application: S/0559/17/COND29
Also please note the A10 SLO for a reduction of the speed limit on these sections from 50mph to 40mph.
https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-slo--reference-number-pr--------a---and-some-surrounding-roads-in-the-vicinity-of-milton--landbeach-and-waterbeach-18-0
From looking at the plans my main concerns
Narrow sections - less than 3m wide, which is not LTN 1/20 compliant and very unambitious seeing as 11,000 homes are being built in Waterbeach.
The separation from the carriageway is also very unambitious at 0,5m and not a properly segregated verge. 0,5m is the absolute minimum suggested in LTN 1/20. 1m is the minimum recommended.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Cambridgeshire County Council proposes to make the above Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Prohibit all motorised vehicles on Oakington Road, Longstanton from a point 460 metres south east of its junction with Wilson’s Road to Longstanton Road, Oakington and Westwick at a point 370 metres north west of its junction with Lowbury Crescent.
Access for pedestrians, cyclists & equestrians will be maintained with provision for access for adjacent agricultural landowners and emergency service vehicles.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Cambridgeshire County Council proposes to make the above Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Revoke 5.5 metres of the residents parking bay outside of 55 De Freville Avenue and replace with double yellow lines to facilitate a dropped kerb access.
Created by Steven Moseley // 1 thread
Part demolition of outbuilding to south west elevation and conversion of existing building to three two bedroom and three one bedroom apartments with associated parking
Created by Steven Moseley // 1 thread
Demolition of double garage and erection of five detached dwellings, garages with landscaping, access and front boundary wall. (re- submission of approval 181630 and 190582)
Created by Roxanne (CEO) // 1 thread
How can cycle parking at Queen Anne Terrace car park be improved and made more secure?
Outline Planning Application for up to 39 market homes and 16 affordable homes with vehicular access from Greate House Farm Road andThe Folley with all other matters reserved.
211392 / 211393
Large development, so several proposals for local routes in planning objection.
Created by Thomas Ashton // 1 thread
A pair of one way swing gates have been installed on Coldhams common. This blocks the path for people like me with a cargo bike because it is not possible to hold the gates open and hold the bike at the same time. I spoke with someone on the site and they said it was needed to stop cows escaping while they replaced the cattle grid. Surely there is a better way that don’t stop access for cargo bikes?
Created by KW // 1 thread
Hybrid planning application comprising: a) outline planning application for commercial development comprising B8 floorspace, including ancillary E(g)i floorspace, and flexible B8/E(g) floorspace, car and cycle parking, landscaping and associated infrastructure with all matters reserved except for access on Parcel A; b) full planning application for ecological enhancements on Parcel B; and c) full planning application for recreation and ecological enhancements, including landscaping, public open space and pedestrian and cycle access on Parcel C. | Land South Of Coldhams Lane Cambridge Cambridgeshire
Has implications for The Tins, Fulbourn Greenway, Cherry Hinton, Coldham's Lane, Brookfields, and Burnside.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing buildings/structures and erection of college accommodation, new access and landscaping
Wilberforce Road Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 2 No. one Bedroom Bungalows
Land To The Rear Of 32 And 32A Gray Road Cambridge CB1 3TA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of outbuilding into one new dwelling, and enlargement of cycle and bin store
1 Grosvenor Court Cambridge CB3 0HU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a 2bed dwelling on land rear of 57 Mowbray Road
57 Mowbray Road Cambridge CB1 7SR
Created by Rosamund Humphrey (Admin Officer) // 1 thread
External Improvements to St Peter's Terrace including improved bike racks & storage, removal of three trees, enlarge gravel area, relay tarmac, new bin stores, new fences and reduce rear garden.
No change of use.
Land At St Peters Terrace Cambridge CB2 1QQ
Created by Marcus Howarth // 1 thread
From https://haveyoursay.tfl.gov.uk/lumley-road
This is in response to a high number of collisions having been recorded at this location involving vehicles turning right from Lumley Road, and northbound traffic on St Dunstan's Hill. Local residents and stakeholders have also raised concerns about this junction. We are now holding a public consultation on our proposals, running from 7 June to 18 July 2021, and you can find details of how to take part below.
We propose making the exit from Lumley Road onto St Dunstan's Hill left turn only. To enforce this, we propose installing a pedestrian island in the carriageway at the end of Lumley Road, which would help prevent vehicles from turning right. This island would include dropped kerbs and tactile paving. As well as prohibiting the right turn, this would also provide a safer and easier crossing point for pedestrians and cyclists crossing Lumley Road.
From impact assessment
Created by Steven Moseley // 1 thread
Resubmission of application number 210196 following redesign, for a single linked 2 bedroom house.
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 172118 - APP/A1530/W/18/3200940 - Demolition of bungalow and barn/shed and the erection of 3no. dwellings.
Created by Steph Potter // 0 threads
This is a junction of a suburban road and a gravelled shared pedestrian/cycle route through Fish Pond Woods. Unfortunately, the dropped kerb to turn from the road onto the path does not line up with the path and there are no double yellow lines to prevent people from parking immediately blocking the path. Once on the path, the path is too narrow and poorly gravelled that it is difficult to try to stop or swerve if meeting a pedestrian or oncoming cyclist.
Created by John Seton // 1 thread
Aggregate Industries have contacted local cycling walking and equestrian groups about Rights of Way improvements they plan to implement on their site near Little Paxton, between the A1 and the River Ouse north of Little Paxton.
They say "As part of our planning permission at Little Paxton and specifically the restoration scheme we are starting to implement our Rights of Way improvements which will see a new network of Public Rights of Way and Bridleways linking Diddington Village with the River Ouse and Little Paxton Nature Reserve".
As the work is on a private site, it my not get picked up through regular County Council planning distribution lists, so this is creating a new issue to create a placeholder for any discussion about the plans.
Created by Steven Moseley // 1 thread
Outline Application, all matters reserved: Existing Dwelling House retained and refurbished with smaller Garden. 3No. new detached 3- bedroom Dwelling Houses.
Created by Jean Dollimore // 1 thread
Goods Way has been one way westbound for motor vehicles for most of its length during recent construction works. The section between the Kings Cross Station service road and York Way is two-way to allow service and construction vehicles to access York Way directly. Two-way cycling has been maintained right along Goodsway.
Camden proposes to make the current arrangements permanent
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.